This file is a General Condition Breakdown attachment for a construction-related federal contract opportunity. The document is associated with solicitation 36C24927B0004, titled "Z2DA--FY26 NRM - 626-25-101 - Upgrade Critical Environments I," issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The requirement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 236220 (Commercial and Institutional Building Construction), with a small business size standard of $45 million. This is an Invitation for Bid (IFB) for commercial products and commercial services prepared under Revolutionary Federal Acquisition Regulation Overhaul (RFO) Parts 12 and 14, with award to be made to the lowest-priced responsive, responsible bidder without negotiation.
Bidders must be listed and viewable in the SBA's SDVOSB database at the time of bid submission and prior to award, maintain an active listing in the System for Award Management (SAM) database, and submit evidence of enrollment with VETS4212 upon award. The Contracting Officer will determine contractor responsibility in accordance with RFO Part 9 prior to award. The file itself appears to be a template or breakdown document providing general conditions for the construction project, though specific product requirements, services scope, pricing terms, response dates, and award dates are not detailed within this attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf | ||
| Attachment 5 Contractor EMR Certification Form.docx | DOCX document | |
| 36C24927B0004.docx | DOCX document | |
| Attachment 8 Wage Determination - TN20260178 - Modification 1 - 05-18-2026.pdf | ||
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 9 SF33 36C24927B0004.pdf | ||
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 3 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Attachment 7 Request For Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Management:
Superintendent(s)
Safety Manager
CPM Scheduler
Quality Assurance/Quality Control
Project Manager (s)
Project Executive
Field Office Engineer
Field Office Support Staff
Project Expeditor
Assistant Superintendent (s)
Project Manager Subtotal
Bonds and Insurance (excluding any for Subcontractors):
Builder’s Risk Insurance
General Liability Insurance
Security, Payment & Performance Bonds
Bonds and Insurance Subtotal:
Site Conditions:
Temporary Power Consumption (Offices)
Temporary Power Consumption (General Site Use)
Temporary Water and Sewer Consumption
Temporary Water Hookup, Distribution & Meters
Temporary Electrical Hookup, Distribution & Meters
Temporary Telephone & Network System Installation
Temporary Telephone & Internet Consumption Fees
Temporary Fire Protection
Temporary Heating & Cooling
Temporary Fencing
Temporary Covered Walkways
SWPPP Measures
Temporary Entries and Truck Washes
Street Cleaning (by G.C.)
Traffic Control Measures
Temporary Barricades & Signage
Temporary Roads & Walkways (install & maintenance)
Temporary Lighting
Temporary Partitions & Covered Floor Openings
Temporary Toilets/Sanitary Measures
Temporary Laydown (prep and restoration)
Security System/Watchman
Pre-construction Photo Documentation
Progress Photos
Temporary Protection (in place work/adjacent structures)