Attachment 6 General Condition Breakdown.docx

DOCX document 13 KB Posted

Attached to
Z2DA--FY26 NRM - 626-25-101 - Upgrade Critical Environments I
Solicitation number
36C24927B0004-626-25-101_UpgradeCriticalEnvironmentsI
Issued by

About this file

This file is a General Condition Breakdown attachment for a construction-related federal contract opportunity. The document is associated with solicitation 36C24927B0004, titled "Z2DA--FY26 NRM - 626-25-101 - Upgrade Critical Environments I," issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The requirement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 236220 (Commercial and Institutional Building Construction), with a small business size standard of $45 million. This is an Invitation for Bid (IFB) for commercial products and commercial services prepared under Revolutionary Federal Acquisition Regulation Overhaul (RFO) Parts 12 and 14, with award to be made to the lowest-priced responsive, responsible bidder without negotiation.

Bidders must be listed and viewable in the SBA's SDVOSB database at the time of bid submission and prior to award, maintain an active listing in the System for Award Management (SAM) database, and submit evidence of enrollment with VETS4212 upon award. The Contracting Officer will determine contractor responsibility in accordance with RFO Part 9 prior to award. The file itself appears to be a template or breakdown document providing general conditions for the construction project, though specific product requirements, services scope, pricing terms, response dates, and award dates are not detailed within this attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Management:

Superintendent(s)

Safety Manager

CPM Scheduler

Quality Assurance/Quality Control

Project Manager (s)

Project Executive

Field Office Engineer

Field Office Support Staff

Project Expeditor

Assistant Superintendent (s)

Project Manager Subtotal

Bonds and Insurance (excluding any for Subcontractors):

Builder’s Risk Insurance

General Liability Insurance

Security, Payment & Performance Bonds

Bonds and Insurance Subtotal:

Site Conditions:

Temporary Power Consumption (Offices)

Temporary Power Consumption (General Site Use)

Temporary Water and Sewer Consumption

Temporary Water Hookup, Distribution & Meters

Temporary Electrical Hookup, Distribution & Meters

Temporary Telephone & Network System Installation

Temporary Telephone & Internet Consumption Fees

Temporary Fire Protection

Temporary Heating & Cooling

Temporary Fencing

Temporary Covered Walkways

SWPPP Measures

Temporary Entries and Truck Washes

Street Cleaning (by G.C.)

Traffic Control Measures

Temporary Barricades & Signage

Temporary Roads & Walkways (install & maintenance)

Temporary Lighting

Temporary Partitions & Covered Floor Openings

Temporary Toilets/Sanitary Measures

Temporary Laydown (prep and restoration)

Security System/Watchman

Pre-construction Photo Documentation

Progress Photos

Temporary Protection (in place work/adjacent structures)