Attachment 2 Revised Drawings Amendment-0002 - 07-15-2025.pdf
PDF 20 MB Posted
- Solicitation number
- 36C24925R0040
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24925R0040 0003.docx | DOCX document | |
| Attachment 1 Revised Specifications Amendment-0002 - 07-15-2025.pdf | ||
| LIST OF ATTACHMENTS.docx | DOCX document | |
| Attachment 3 Sign-in Sheet - Renovate B200 Ground For Bronchoscopy.pdf | ||
| 36C24925R0040 0002.docx | DOCX document | |
| 36C24925R0040 0001.docx | DOCX document | |
| Attachment 8 Request For Information Form.docx | DOCX document | |
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| 36C24925R0040_1.docx | DOCX document | |
| Attachment 2 Drawings.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 5 General Condition Breakdown.docx | DOCX document | |
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment 7 Contractor EMR Certification.docx | DOCX document | |
| Attachment 9 Wage Determination TN20250160 - Modification 0 - 01-03-2025.pdf | ||
| Attachment 4 Calc. of Self Performed Work General Contractor.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE PROJECT LOCATION
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/1
/2
:4
:5
P
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
-V A
M tn
H o m e
-B ro n c h o s c o p y -T
N R c k u rk u lG
V Y
H
.r v t
G-001
COVER SHEET
1 4CMK
A/E RENOVATE B200 GROUND
FLOOR FOR BRONCHOSCOPY
PROCEDURE ROOM
J.H. QUILLEN VAMC
LAMONT AND VETERANS WAY
MT. HOME, TN 37604 NOVEMBER 15, 2024
BID DOCUMENTS
621-24-10123-148
A/E RENOVATE B200 GROUND FLOOR FOR
BRONCHOSCOPY PROCEDURE ROOM
J.H. QUILLEN VAMC
LAMONT AND VETERANS WAY
MT. HOME, TN 37604
VA PROJECT #: 621-24-101
WVS
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 4
G-002 CAMPUS MAP 2 4
G-003 GROUND FLOOR CONSTRUCTION ROUTING PLAN 3 4
G-004 ICRA INFORMATION AND DETAILS 4 4
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 5
A-101 GROUND FLOOR PLANS 2 5
A-102 PARTIAL ROOF PLAN 3 5
A-110 GROUND FLOOR REFLECTED CEILING PLANS 4 5
A-501 PARTITION TYPES, DOOR SCHEDULE AND DETAILS 5 5
INTERIORS
I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 1 3
I-101 GROUND FLOOR FINISH, WALL PROTECTION, AND SIGNAGE PLAN AND GROUND FLOOR EQUIPMENT PLAN 2 3
I-201 CASEWORK, WALL PROTECTION, AND EQUIPMENT ELEVATIONS, CASEWORK DETAILS AND AXONOMETRIC VIEW 3 3
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX100 GROUND FLOOR FIRE SUPPRESSION DEMOLITION AND FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 6
PW100 GROUND FLOOR DRAIN, WASTE, AND VENT DEMOLITION, AND DRAIN, WASTE, AND VENT PLANS 2 6
PP100 GROUND FLOOR DOMESTIC WATER DEMOLITION AND DOMESTIC WATER PLANS 3 6
PG100 GROUND FLOOR MEDICAL GAS DEMOLITION AND MEDICAL GAS PLANS 4 6
P-501 PLUMBING DETAILS 5 6
P-901 SANITARY, DOMESTIC WATER, AND MEDICAL GAS PIPE RISERS 6 6
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 12
M-100 GROUND FLOOR OVERALL PLANS 2 12
M-101 GROUND FLOOR BRONCHOSCOPY RM A024A PLANS 3 12
M-102 GROUND FLOOR MECHANICAL ROOM A012 PLANS 4 12
M-103 GROUND FLOOR MECHANICAL ROOM C029 PLANS 5 12
M-104 FIRST FLOOR MECHANICAL PLANS 6 12
M-105 MECHANICAL ROOF PLAN 7 12
M-301 MECHANICAL SECTIONS 8 12
M-501 MECHANICAL DETAILS 9 12
M-502 MECHANICAL CONTROLS 10 12
M-503 MECHANICAL CONTROLS 11 12
M-601 MECHANICAL SCHEDULES 12 12
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
E-002 TECHNOLOGY AND FIRE ALARM GENERAL NOTES, SYMBOL LEGENDS AND ABBREVIATIONS 2 9
E-100 GROUND FLOOR OVERALL PLAN 3 9
E-101 GROUND FLOOR ELECTRICAL PLANS 4 9
E-102 GROUND FLOOR LIGHTING PLANS 5 9
E-103 MECHANICAL POWER PLAN ENLARGEMENTS 6 9
E-501 ELECTRICAL DETAILS 7 9
E-601 SINGLE LINE DIAGRAM 8 9
E-602 ELECTRICAL SCHEDULES 9 9
N N
1 Addendum 01 07/11/2025
W
AL
TE
R DAVID VAN SCOTER
REG. NO. 9953
Docusign Envelope ID: 66F67929-807E-43AF-8EB3-C674D3071CBC
7/15/2025
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
LEGEND
BUILDINGS IN SCOPE
CONTRACTOR STAGING
AREA
Engineers Architects
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7 /2
:5
:0
P
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
-V A
M tn
H o m e
-B ro n c h o s c o p y -T
N R c k u rk u lG
V Y
H
.r v t
G-002
CAMPUS MAP
2 4CMK
A/E RENOVATE B200 GROUND
FLOOR FOR BRONCHOSCOPY
PROCEDURE ROOM
J.H. QUILLEN VAMC
LAMONT AND VETERANS WAY
MT. HOME, TN 37604 NOVEMBER 15, 2024
BID DOCUMENTS
621-24-10123-148
WVS
GENERAL SYMBOL LEGEND
SCALE: NO SCALE
CAMPUS MAP
NORTH
1 STAGING AREA, COORDINATE WITH COR FOR EXACT
LOCATION. CONTRACTOR PERMITTED UP TO 30'X50'
AREA. PROVIDE 6' H TEMPORARY CHAIN LINK PANEL
FENCING WITH WIND SCREEN AND ONE 8' WIDE
SWINGING GATE. PANEL FENCING TO BE WEIGHTED
WITH SAND BAGS.
W
AL
Docusign Envelope ID: 4407C7FD-0318-499F-B91A-339CA5083F04
11/8/2024
R
P
U
24 22
A056
OFFICE
A024A
BRONCHOSCOPY
VENTILATORY
TESTING
A054
PULM.
STORAGE
A052
VENTILATORY
TEST AREA
A050
BLOOD GAS
LAB
A046
ANTE
A024
GAS STOR.
A048
CORRIDOR
A053
S. UTILITY
A045
COPY
A043
MALE TOILET
A060
ELEC.
CLOSET
A022
TELE CLO.
A020
CHAPLAN
OFFICE
A018D
CHIEF
CHAPLAIN
OFFICE
A018CCHAPLAIN
SVC
A018
CHAPLAIN
OFFICE
A018B
CHAPLAIN
OFFICE
A018A
STORAGE
A016A
CHAPLAIN
OFFICE
A016
DIET'N
OFFICE
A015
CRNA
A064
FEMALE
TOILET
A062A
FEMALE
LOCKERS
A062
MALE
LOCKERS
A060A
WAITING
A040
OFFICE
A042
SUPV RESP
THERAPY
OFFICE
A044
CORRIDOR
A057
CORRIDOR
A058
CORRIDOR
CG-55
CORRIDOR
CG-37
MECH
D024A
NURSE MGR
C002C
CLINICAL
NURSE
C002B
OFFICE
C002A
C002
BATH
C001A
VACANT
C001
STAIR
VACANT
C004
VACANT
C003
BATH
C003A
BATH
C004A
VACANT
C006
VACANT
C005
VACANT
C007
OFFICE
C008
BATH BATH
C007A
STORE
C009
CHIROPRACTIC
WAITING RM
C010
OFFICE
C012
OFFICE
C011
BATH
C011A
BATH
OFFICE
C014
OFFICE
C013
ANTE RM
C016B
TLT
C016A
ICU 4 - BARI
C016
CORR
CG33
CRASH
C057A
CLEAN
C017
BIO-MED
C015
EQUIP STOR
C057
ELEC
C055
IT
C053
IT
C051
TLT
C049A
ICU-5 BARI
C049
CORR
CG30
ICU-6
C047
TLT
C047A
TLT
C045A
ICU-7
C045
ICU-8
C043
TLT
C043A
TLT
C041A
ICU-9
C041
ICU-10
C039
TLT
C039A
TLT
C037A
ICU-11
C037
TLT
C035A
ICU-12
C035
ICU-13
C033
CORR
CG27
LINEN
C031
STAFF CONF /
LOUNGE
C030
STAFF TLT
C031A
ALCOVE
C027A
HOUSEKEEP
C028A
RECYCLING
C028
STAFF TLT
C040
MALE
LOCKERS
C030B
FEMALE
LOCKERS
C030A
STAFF TLT
C038
CORR
CG29
CORR
CG22
CORR
CG25
EQUIP
C036A
MED GAS
C036
MEDS
C023
EMS SOILED
HOLDINGS
C034
SPS SOILED
C032
OFFICE
C025
TEAM WORK
C027
NOURISH
C021
LOGISTICS
STOR
C042
CONSULT
C026
WARD
CLERK/TEAM
WORK
C019CORR
CG34
ICU 3
C018
TOILET
C018A
ICU 2
C020TOILET
C020A
ICU 1 -
ISOLATION
C022
ANTE RM
C022B
TLT
C022A
STRETCHER/
WC HOLDING
C024
HAC
C026A
MECH RM
C029
C024
TOILET
C026
RECYCLING
C028
WAITING
ELEVATOR
S4
ELEVATOR
S3
TELE
ALCOVE
CART
CORR
CG27A
ELEV LOBBY
CG35
STORAGE
B069
TRASH /
LINEN
C035
ELEC
B067
ALCOVE
CART
TELE
HAC
B065 TEL
B059
WAITING
B057
LAB
B073 ON-CALL
B075 TLT
C033A
WOMEN'S
LOCKERS
B055A
ON-CALL TLT
B075A
TLT
B057A
TLT
B057B
HALL
B055
OFFICE
B053
MEN'S
LOCKERS
B055B
TELE
B002
ELEC
B004
STORAGE
B001
DIETIC
KITCHEN
B003
MULTI-PURPOSE
RM/CCU
SOILED
UTILITY
B005
WORK
STATION
B006
CLEAN LINEN
B007
NURSE
STATION
MULTI-PURPOSE
RM/CCU
CORRIDOR
PATIENT RM
B006
PATIENT RM
B008
PATIENT RM
B010
PATIENT RM
B012
PATIENT RM
B014
MULTI-PURPOSE
RM/CCU
LOUNGE
B016
FEMALE
LOCKERS
B016C
MALE
LOCKERS
B016A
TLT
B016B
TLT
B016D
HOUSEKEEP
B015
MED RM
B011
MULTI-PURPOSE
RM
B017
OFFICE
B013
BATH
B017A
LOGISTICS
STORAGE
B018
STAIR
PATIENT RM
B020
PATIENT RM
B022
PATIENT RM
B024
PATIENT RM
B026
PATIENT RM
B028A
B028
DIALYSIS
UNIT
B030
WORKROOM
BATH
B056
CORRIDOR
SOILED
B060G
RESPITORY
CARE
B32
OFFICE
B060A
ENGG MECH
RM
B062
OFFICE
B060B
STORAGE
B060E
RT STORAGE
B060D
EMPLOYEE
LOUNGE
B060C
CORRIDOR
STORAGE WC
B064
MECH RM
A096
LINEAR
ACCELERATOR
VAULT 1
A069
STAIR
A097
HVAC
STORAGE
A069N
LINEAR
ACCELERATOR
VAULT 2
A069K
PHYSICS
STORAGE
A069M
STORAGE
A069L
MECH RM
A069H
STORAGE
A069H
OFFICE
A069F
CONTROL RM
A069J
WAITING
AREA
DRESSING
RM
A069ESTORAGE
A069D
HAC
A093
DOOR
CONTROL
A069C
MECH
CLOSET
A069B
CONTROL RM
A069B
CORRIDOR
CHIEF
CONTROL
A073
WAITING
A068
PATIENT TLT
A068A
OFFICE
A070A
ADMIN
OFFICE
A070
PATIENT TLT
A071
RAD
ONCOLOGY
NURSE
A075
OFFICE
A072
OFFICE
A072A
EXAM AREA
A074
ELEC CLOSET
A091
STORE
A089A
LAB
EQUIPMENT
A089
CT SCAN
A077
EXAM AREA
A076
BREAK RM
A078
OFFICE
A080
STORE
A082 RAD/ONCOLOGY
A083
PHYSICIST
A085
TREATMENT
PLANNING
A087
OFFICE
A026
OFFICE
A026A
STRETCHER
EXAM
A028
MALE TLT
A057
FEMALE TLT
A059
HAC
A029
HOME PAP
THERAPY CO.
A031
PROPOSED
RESP. CARE
VENTILATOR
STORAGE
A041
HOME PAP
THERAPY CO.
A033
OFFICE
A033A
HOME PAP
THERAPY CO.
A030
PHYSICIAN
OFFICE
A032
OFFICE
A033B
MULTIPURPOSE
A040A
PULMONARY
A042
MULTIPURPOSE
A034
PULM
FELLOWS
A036
PHYSICIAN
OFFICE
A038
PHYSICIAN
OFFICE
A040
MEN'S REST
MEN'S VEST
CORRIDOR
WOMEN'S
VEST
WOMEN'S
REST
PRE-FUNCTION
SPACE
INTERNET
LOUNGE
BOARD ROOM
VESTIBULE
ENTRY
CORRIDOR
SERVING
PANTRY
CAFE
PRE-FUNCTION
SPACE
EMERGENCY
GENERATOR
A010
MECHANICAL
ROOM
A010A
STAIR
MECH RM
A012
ELECTRICAL
SWITCHGEAR
A008
TEL
A006A
TELE-COM
RM
A006
CHAIR/TABLE
STORAGE
SMALL
MEETING RM
CISCO
TELE-PRESENCE
MULTIPURPOSE
RM
SMALL
MEETING RM
CISCO
TELE-PRESENCE
RM
ELEC CLOSET
ELEC RM
TELECOM
ELEVATOR
P2
ELEVATOR
P1
CORRIDOR
STAIR
BMS
STORAGE
A005
BIO-MED
WORK AREA
A003
TLT
A066B
TLT
A066A
TLT
A003A
ESCORT SVC
STORAGE
A066 STOCK/STORAGE
A001D
BIO-MED
A001
OFFICE
A001A
OFFICE
A001B
STORE
A001C
CORRIDOR
C O
R R
ID
O
R
STORAGE
A025B
CHURCH
A025A
CHAPEL
A025
CORRIDOR
EUCHARIST
A027
MALE TLT
A023
FEMALE TLT
A021
RECYCLING
OFFICE
D0XX
ELEVATOR
LOBBY
ELEVATOR
S6
ELEVATOR
S5
LOBBY ELEV
CORRIDOR
STORAGE
D019A
ISOLATION
RM
D019B
CONTROL
STATION
D029
NURSE MGR
D030
PACU/RECOVERY
D019
CORRIDOR
FAMILY
WAITING
E033
TOILET
E024
STORE
E022
MECH
E020
HOLDING RM
E018
BATH
E018A
BATH
E016A
HOLDING RM
E016
CYSTO
STORAGE
E029A
COMM
E015
STORAGE
GAS
E017
ENDO/CYSTO
PROCEDURE
RM
E029
CYSTO
PROCEDURE
RM
D038
STORAGE
D036
ENDOSCOPY
PROSEDURE
D035
ENDOSCOPY
PROSEDURE
D034
ENDOSCOPY
PROSEDURE
D033
MINOR
TREATMENT
D032
STERILE
STORAGE
D028
CORRIDOR
SURGY
LOUNGE
D027
SPECIAL
PROCEDURES
ROOM
D026A
CONTROL
ROOM
D026B
EQUIPMENT
STORAGE
D026C
SPS STERILE
SUPPLY
ROOM
D024
ANESTH
WORK RM
D013
CORRIDOR MENS
LOCKER
D027A
MENS
SHOWER
E026B
D027B
FEMALE
TOILET
E027A
FEMALE
SHOWER
E027B
FEMALE
LOCKER
E027
MENS
LOCKER
E026
WRK AREA
D038
SOILED
D037
STERIS
SOILED RM
D039A
SCOPE RM
D039
STERIS
CLEAN RM
D039B
STATION
NURSE
E019
MEDS RM
E021
HAC
E023
TELE
E025
ELECTRICAL
E028
ELECTRICAL
E030
STORAGE
E032TRASH
E031
SPS STERILE
CART ROOM
D030
PATIENT
HOLDING
D022
FAMILY
WAITING
D022A
PATIENT
TOILET
D022B
RECOV
CLEAN
SUPPLY
D021
RECOV
SOILED
UTILITY
D020
NURSE
STATION
D018
PNEUMATIC
TUBE
CHART'G
D018A STAFF TLT
D017
OR-1
D012
SOILED
HANDLING
D016
ELEC
D014
OR-2
(ORTHOPEDIC)
D010
CORRIDOR
STERILIZER
D011
CLEAN
SUPPLY
D009
CORRIDOR
SURGY
EQUIPMENT
STORAGE OR-3
D008
SUB STERILE
D007
HAC
D005
OR-4
D006
STORAGE
D004
CORRIDOR
HAC
D002
STAIR
WORK ROOM
D001
ANESTH
OFFICE
D001A
NURSE MGR
D001B
ANESTH
OFFICE
D001D
CHIEF OF
ANESTH
D001C
HOLDING RM
E013
HR
E011
BATH
E011A
CORRIDOR
HOLDING RM
E009
HOLDING RM
E007
BATH
E007A
STORAGE
E005
HOLDING RM
E003
LOUNGE
STAFF
E001
BATH
E001A
BATH
E003A
WAITING RM /
AMBULATORY
/ SURGERY /
MRI
E002
STAIR
IN PATIENT
HOLDING
X101
STAFF TLT
X102
HOLDING RM
E006
HOLDING RM
E008
BATH
E008A
HOLDING RM
E010
HOLDING RM
E012
HOLDING RM
E014
BATH
E012A
MATERIAL SUPPLY
ENTRY POINT
WORKER ENTRY
POINT
LEGEND
CONSTRUCTION ROUTE
AREA OF WORK
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:4
:5
P
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
-V A
M tn
H o m e
-B ro n c h o s c o p y -T
N R c k u rk u lG
V Y
H
.r v t
G-003
GROUND FLOOR CONSTRUCTION
ROUTING PLAN
3 4CMK
A/E RENOVATE B200 GROUND
FLOOR FOR BRONCHOSCOPY
PROCEDURE ROOM
J.H. QUILLEN VAMC
LAMONT AND VETERANS WAY
MT. HOME, TN 37604 NOVEMBER 15, 2024
BID DOCUMENTS
621-24-10123-148
WVS
SCALE: 1" = 20'-0"
GROUND FLOOR CONSTRUCTION ROUTING PLAN
N O
R T H0 2010 40
A. CEILING TILES TO BE REPLACED AT THE END OF
EACH SHIFT FOR WORK AREAS OUTSIDE OF A
RATED CONSTRUCTION BARRIER. IF THE TILES
CANNOT BE REPLACED, THE SPRINKLER
SYSTEM MAY BE CONSIDERED OUT OF SERVICE
IN THESE AREAS AND 1-HOUR FIRE RATED
SEPARATION WILL BE REQUIRED BETWEEN THE
CONSTRUCTION AREA AND THE OCCUPIED
PORTIONS OF THE BUILDING.
SHEET NOTES:
1 Addendum 01 07/11/2025
W
AL
3 5/8" INSULATED WALL
WITH METAL STUDS @
16" O.C. WALL TO
EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT
GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
B
1-HR RATED U.L. DESIGN NO. U419
3 5/8" INSULATED WALL WITH
METAL STUDS @ 16" O.C.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
A
NON-RATED
EXISTING WALL
2'-0"
EXISTING CEILING TO BE
REMOVED AND RE-INSTALLED
EXISTING LIGHT TO REMAIN
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
RENOVATE B200 GROUND FLOOR
BRONCHOSCOPY PROCEDURE ROOM
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE
SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT
AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE COVERED AND PROTECTED PRIOR STARTING EACH
CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED
BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Note: Infection Control approval will be required when the Construction Activity and Risk Level that indicates
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV The ICRA classification for this project is Class IV.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
HEPA NEGATIVE AIR UNIT FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD, TEMPORARY.
SALVAGE PROTECT AND STORE
EXISTING WINDOW TO BE RE-INSTALLED
AFTER CONSTRUCTION IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
SWIVEL CASTERS WITH
TWO LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
CEILING
FLEX PORTION
R
P
U
24 22
A050
VENTILATORY
TEST AREA
A048
GAS STOR.
A045
S. UTILITY
A043
COPY
A060
MALE TOILET
ELEC.
CLOSET
A022
CORRIDOR
A053
CORRIDOR
PULMONARY
PROCEDURE
ROOM
A052
VENTILATORY
TEST AREA
A054
PHARMACY
WORKROOM
A024A
PHARMACY
WORKROOM
A024
OFFICE
A056
CUBICLE
STUDY
A057
CORRIDOR
CG-37
R
P
U
24 22
PULMONARY
PROCEDURE
ROOM
A052
VENTILATORY
TEST AREA
A054
PHARMACY
WORKROOM
A024A
PHARMACY
WORKROOM
A024
OFFICE
A056
MALE TOILET
A060
ELEC CLOSET
A022
VENTILATORY
TEST AREA
A050
GAS STORAGE
A048
UTILITY
A045
CORRIDOR
CG-55
CORRIDOR
CG-37
CUBICLE
STUDY
A057
TELE CLOSET
A018A
COPY
A043
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7 /2
:5
:2
P
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
-V A
M tn
H o m e
-B ro n c h o s c o p y -T
N R c k u rk u lG
V Y
H
.r v t
G-004
ICRA INFORMATION AND DETAILS
4 4CMK
A/E RENOVATE B200 GROUND
FLOOR FOR BRONCHOSCOPY
PROCEDURE ROOM
J.H. QUILLEN VAMC
LAMONT AND VETERANS WAY
MT. HOME, TN 37604 NOVEMBER 15, 2024
BID DOCUMENTS
621-24-10123-148
WVS
SCALE: NO SCALE
ICRA BARRIER WALL TYPE
SCALE: NO SCALE
ILSM CONSTRUCTION EGRESS SIGNAGE
SCALE: NO SCALE
CROSS SECTION "A"
SCALE: NO SCALE
ICRA MOBILE CONTAINMENT CART
SCALE: 1/8" = 1'-0"
GROUND FLOOR ICRA DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
GROUND FLOOR ICRA REFLECTED CEILING DEMOLITION PLAN
1 ICRA BARRIER WALL TYPE A. TO BE PUT UP AND TAKEN DOWN IN ONE SHIFT.
2 STICKY MATS.
3 HEPA FILTER.
4 ICRA BARRIER WALL TYPE A.
5 ICRA BARRIER WALL TYPE B.
6 THIS SIDE OF BARRIER TO BE FINISHED. SANDED, PAINTED, AND BASE TO MATCH EXISTING.
7 ABOVE CEILING WORK TO BE COMPLETED DURING OFF HOURS.
8 INSTALL HEAVY DUTY OSHA FIRE RETARDANT FLOOR PROTECTION,13 MIL.
9 CEILING WORK ON THIS SIDE OF BARRIER TO TAKE PLACE DURING OFF HOURS,
COORDINATE WITH COR.
10 PLASTIC BARRIER OR TEMPORARY WALL SYSTEM. BASIS OF DESIGN STARC WALL OR
EDGEGUARD OR EQUAL
KEY NOTES:
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
W
AL
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1#
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCTS.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF GYPSUM BOARD, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORESEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
17. WHERE INSTALLATION OF NEW FIXTURES, EQUIPMENT, DEVICES, OR SYSTEMS REQUIRES REMOVAL OF EXISTING WALL SURFACE, CONTRACTOR SHALL COORDINATE THE EXTENT OF SUCH REMOVAL AND PATCH/
REPAIR THE EXISTING WALL AFTER INSTALLATION.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
1 HOUR FIRE SMOKE SEPARATION
SMOKE RATED
EXPOSED PLUMBING AT
BARRIER FREE
LAVATORIES
SHALL BE INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
CLEAR
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
INTERCOM
STATION INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
E
S
U R
F A
C E
O F
M
IR
R
O R
NOTE: FIRE EXTINGUISHERS
HAVING A GROSS WEIGHT
NOT EXCEEDING 40 LB (18.14
KG) SHALL BE INSTALLED SO
THAT THE TOP OF THE FIRE
EXTINGUISHER IS NOT MORE
THAN 5'-0" (1.53 M) ABOVE
THE FLOOR.
FIRE EXTINGUISHER
CABINET
ELECTRICAL PANEL
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
(3-6" MIN)
(4'-0" MAX)
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
NOTE: PROVIDE WALL BLOCKING
FOR ALL WALL MOUNTED
EQUIPMENT AND ADA WALL
MOUNTED ACCESSORIES. BLOCKING
SHALL EITHER BE STEEL STRIP, 6"
WIDE, WITH LENGTH EXTENDING
ONE STUD SPACE BEYOND END OF
ITEM SUPPORTED, OR 5 1/2" WIDE
FIRE TREATED WOOD BLOCKING
ONLY AT GRAB BAR CONDITIONS.
TELEPHONE
OR DATA
OUTLET
ACCESSORIES
HAND
SANITIZER
GLOVE
DISPENSER
SHARPS WITH
GLOVE DISPENSER
1. ACCESS PANELS ARE NOT PERMITTED IN SOFFITS, CHECK ALL VALVES, FIRE DAMPERS, REHEAT BOXES, ETC.
FOR ACCESS POINTS. ARRANGE FIRE AND SMOKE DAMPER ACCESS FROM NON-CORRIDOR SIDE.
2. LIGHTS, DIFFUSERS, EXIT SIGNAGE, SPRINKLER HEADS, AND SMOKE DETECTORS MUST BE CENTERED IN
CEILING PANELS IN WHICH THEY OCCUR.
3. COORDINATE WITH SEPARATE MECHANICAL AND ELECTRICAL DESIGN PACKAGES FOR CEILING MOUNTED
DEVICES.
4. PAINT CUT EDGES OF ACT TO MATCH CEILING TILE WHERE EXPOSED TO VIEW.
5. CONTRACTOR TO REVIEW CEILING LAYOUT AS SHOWN AND NOTIFY ARCHITECT OF ANY CONFLICTS BEFORE
PROCEEDING WITH CONSTRUCTION.
1. ALL MECHANICAL SHAFTS SHOULD BE FIRE RATED CONSTRUCTION. AS SHOWN ON PLAN.
2. REFER TO FLOOR PLAN SHEET FOR FIRE RATED AND SMOKE PARTITION LOCATIONS. ALL FIRE & SMOKE PARTITIONS SHALL EXTEND FROM FLOOR SLAB TO THE UNDERSIDE OF STRUCTURE - DECK ABOVE. ALL PENETRATIONS SHALL BE SEALED AND PROTECTED WITH FIRE RATED SEALANT TO MAINTAIN THE INTEGRITY
OF THE PARTITION.
3. PARTITION INSTALLATION SHALL CONFORM TO ALL CODE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .