8 Price Schedule Project 626A4-22-211 AJP-Replace Chilled Water Loop.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z2DA--626A4-22-211 - AJP-Replace Chilled Water Loop Federal contract opportunity
Solicitation number
36C24924R0074
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document is a Price Schedule and related Solicitation for a federal contract opportunity to replace the chilled water loop at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The solicitation number is 36C24924R0074, and the project title is "AJP-Replace Chilled Water Loop".

The contractor shall provide all labor, material, equipment, and supervision necessary to accomplish the work, which includes demolition and new construction of the general, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, and industrial hygiene systems. The period of performance is 360 calendar days for the base offer and 300 calendar days for Deduct Alternate 1, which excludes work related to buildings 10, 11, and 17. The project magnitude of construction is between $5M and $10M, under NAICS code 238220 for Plumbing, Heating, and Air Conditioning Contractors. The agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 9.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--626A4-22-211 - AJP-Replace Chilled Water Loop, newest first.
File Type Posted
Amend 0002 RFI Responses 626A4-22-211 - Construction AJP Replace Chilled Water Loop.pdf PDF
36C24924R0074 0002.pdf PDF
Amend 0002 - 18235 GEOTECH REPORT.pdf PDF
Site Visit Scanned Sign In Sheet.pdf PDF
36C24924R0074 0001.pdf PDF
4 Contractor EMR Certification Form.docx DOCX document
36C24924R0074.pdf PDF
3 AJP-Replace_Chilled_Water_Loop_100_Const_Specs_2024_01_19.pdf PDF
6 UEI _ TAX ID.docx DOCX document
7 Calculation of Self Performed Work.docx DOCX document
1 Wage Determination TN20240187 06212024 626A4-22-211 Replace Chilled Water Loop.pdf PDF
2 AJP-Replace_Chilled_Water_Loop_100_Const_Drawings_2024_01_19.pdf PDF
5 RFI Form.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: AJP-Replace Chilled Water LoopLocation: Alvin C. York VA Medical Center, Murfreesboro, TN 37129Solicitation Number 36C24924R0074Project Title - AJP-Replace Chilled Water LoopProject Number - 626A4-22-211Proposal Date:___________
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00GENERAL REQUIREMENTS$0.00$0.00$0.00$0.00
01 33 23Shop Drawings, Product Data, and Samples$0.00$0.00$0.00$0.00
01 35 26Safety Requirements$0.00$0.00$0.00$0.00
01 42 19Reference Standards$0.00$0.00$0.00$0.00
01 45 29Testing Laboratory Services$0.00$0.00$0.00$0.00
01 58 16Temporary Interior Signage$0.00$0.00$0.00$0.00
01 74 19Construction Waste Management$0.00$0.00$0.00$0.00
01 81 13Sustainable Construction Requirements$0.00$0.00$0.00$0.00
DIVISION 2EXISTING CONDITIONS$0.00
02 41 00Demolition$0.00
DIVISION 5METALS$0.00
05 40 00Cold-Formed Metal Framing$0.00$0.00$ - 0$0.00
DIVISION 6WOOD, PLASTICS, AND COMPOSITES$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 8OPENINGS$0.00
08 11 13Hollow Metal Doors and Frames$0.00$0.00$0.00$0.00
08 14 00Interior Wood Doors$0.00$0.00$0.00$0.00
08 41 13Aluminum-Framed Entrances and Storefronts$0.00$0.00$0.00$0.00
08 71 00Door hardware$0.00$0.00$0.00$0.00
08 71 13Automatic Door Operators$0.00$0.00$0.00$0.00
08 80 00Glazing$0.00$0.00$0.00
0$0.00$0.00$0.00$0.00
DIVISION 9FINISHES$0.00
09 05 16Subsurface Preparation for Floor Finishes$0.00$0.000.00$0.00
09 22 16Non-Structural Metal Framing$0.00$0.000.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 30 13Ceramic/Porcelain Tiling$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 54 23Linear Metal Ceilings$0.00$0.00$0.00$0.00
09 65 13Resilient Base and Accessories$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00$0.00
09 66 16Terrazzo Floor Tile$0.00$0.00$0.00$0.00
09 72 16Vinyl Coated Fabric Wall Covering$0.00$0.00$0.00$0.00
09 72 31Polypropylene Fabric Wall Covering$0.00$0.00$0.00$0.00
09 84 33Sound-Absorbing Wall Units$0.00$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
DIVISION 10SPECIALTIES$0.00
10 14 00Signage$0.00$0.00$0.00$0.00
10 26 00Wall and Door Protection$0.00$0.00$0.00$0.00
10 28 00Toilet, Bath and Laundry Accessories$0.00$0.00$0.00$0.00
DIVISION 12FURNISHINGS$0.00
12 32 00Manufactured Wood Casework$0.00$0.00$0.00$0.00
12 36 00Countertops$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
DIVISION 22PLUMBING$0.00
22 05 11Common Work Results for Plumbing
22 40 00Plumbing Fixtures
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)ERROR:#REF!
23 37 00Air Outlets and Inlets
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 19Low-Voltage Electrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway and Boxes for Electrical Systems
26 27 26Wiring Devices
26 51 00interior Lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 33Raceways and Boxes for Communications Systems
27 15 00Communications Structured Cabling
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electronic Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 28.33Conduits and Backboxes for Electronic Safety and Security
28 31 00Fire Detection and Alarms
$0.00

$0.00

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for Project #626A4-22-211, AJP-Replace Chilled Water Loop at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the Statement of Work, project specifications, and drawings. Work includes demolition and new construction, including, but not limited to general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, industrial hygiene, and certain other items. Period of Performance: 360 calendar days after receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

Deduct Alternate 1

JOB NAME: AJP-Replace Chilled Water LoopLocation: Alvin C. York VA Medical Center, Murfreesboro, TN 37129Solicitation Number 36C24924R0074Project Title - AJP-Replace Chilled Water LoopProject Number - 626A4-22-211Proposal Date:___________
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$0.00$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Deduct Alternate 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
Same as BID ITEM 1, except remove all work related to buildings 10, 11, and 17. Period of Performance: 300 calendar days after receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

FFP Per Item

JOB NAME: AJP-Replace Chilled Water LoopLocation: Alvin C. York VA Medical Center, Murfreesboro, TN 37129Solicitation Number 36C24924R0074Project Title - AJP-Replace Chilled Water LoopProject Number - 626A4-22-211Proposal Date:___________
Base Bid Item 1DescriptionFirm Fixed Price
A. Bid Item No. 1: Includes all work per drawings and specifications. Period of Performance: 360 calendar days after receipt of notice to proceed.$0.00

Alt Ded 1 B. Deduct Alternate No. 1: Same as BID ITEM 1, except remove all work related to buildings 10, 11, and 17. Period of Performance: 300 calendar days after receipt of notice to proceed. $0.00

File details come from the government source that posted it. Updated .