Attachment 5 - Calc. of Self Performed Work General Contractor.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24924R0038
About this file
This document contains a template for calculating the percentage of self-performed work on a federal construction contract. The template requires contractors bidding on Solicitation Number 36C24924R0038 to replace medical air and vacuum pumps at the Robley Rex Veterans Affairs Medical Center in Louisville, Kentucky, to specify the personnel and material costs that will be self-performed by the prime contractor versus subcontracted. Contractors must self-perform at least 25% of total contract costs for personnel. The template includes spaces to provide costs by specification division for both prime contractor and subcontractor work, then calculates overhead, profit, bonding, subtotals, and the final percentage of self-performed work. It requires the contractor's authorized representative to certify the accuracy of the information provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for Contractors (NAICS code 238220) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)