This document is a specification for replacing medical air and vacuum pumps at a Department of Veterans Affairs medical center. The specification calls for replacing two existing vacuum pumps and installing a new third pump. It details the required products and services, which include new vacuum pumps and connections, piping, fittings, valves, gauges, and electrical work. The contractor must provide all necessary labor, equipment, and parts for a complete and operational medical vacuum system. The specification also outlines quality assurance requirements, submittal processes, testing and certification procedures to verify the new system meets applicable NFPA and ASHRAE standards for medical gas systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05-01-23

22 62 00 - 1

SECTION 22 62 00

VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES

PART 1 - GENERAL

1.1 DESCRIPTION

A. Healthcare Vacuum Systems: This section shall apply only to the installation of the new vacuum pumps and connections necessary for those pumps and describes the labor, equipment, and services necessary for and incidental to the installation of the new pumps for the existing piped medical vacuum system. The scope of work shall include all necessary piping, fittings, valves, gages, vacuum pumps, electric motors and starters, and all necessary parts, accessories, connections, and equipment for a complete and operational system including testing and certification of the medical vacuum system relative to the new pumps.

B. The contractor shall provide all elements and accessories required for a complete system according to the most recent edition of NFPA 99, Gas and Vacuum Systems relative to the new pumps and excluding all connections downstream of the receiver.

C. All necessary connections to owner furnished equipment shall be made as indicated on the contract documents. A separate construction isolation valve shall be made at the point of connection to an existing vacuum system.

D. Electrical power and control wiring for vacuum pump(s), and modular accessories associated with the system(s) shall be included.

E. Final testing per NFPA 99 shall be performed excluding downstream of the receiver.

F. The contractor shall retain a qualified third-party medical vacuum verifier acceptable to the COR to perform and attest to final verification of the systems. The contractor shall make all corrections as determined by this third-party verifier, including additional testing if necessary to attain full and unqualified certification at no additional time or cost to the Government.

1.2 RELATED WORK; SECTIONS MAY BE FOUND AT:

HTTPS://WWW.CFM.VA.GOV/TIL/SPEC.ASP

A. SAFETY REQUIREMENTS

1. All employees of general contractor and subcontractors shall comply with VA and OSHA Safety Requirements.

22 62 00 - 2

B. GENERAL INTENTION

1. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Contracting Officer’s Representative.

2. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission through the VA COR, be identified by project and employer, and restricted from unauthorized access.

C. STATEMENT OF BID ITEM(S)

1. ITEM I, BASE BID: Work necessary to replace two vacuum pumps and install a third as outlined in attached Spec 226200.

2. ALTERNATE NO.1: BASE BID except only replace two vacuum pumps excluding the installation of a third.

D. SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1. Contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

E. CONSTRUCTION SECURITY REQUIREMENTS

1. Security Plan:

a. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees comply with VA regulations.

2. Security Procedures:

a. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

b. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

c. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting

Officer.

3. Document Control:

22 62 00 - 3

a. In the event that any documents are produced, the General

Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

b. Certain documents, sketches, videos or photographs and drawings cold be marked “Sensitive Unclassified”; currently there are none. Secure such information in separate containers and limit the access to only those who will need it for the project.

Return the information to the Contracting Officer upon request.

c. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

d. All paper waste or electronic media such as CD’s and DVD’s shall be shredded and destroyed in a manner acceptable to the VA.

e. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

4. Motor Vehicle Restrictions

a. Vehicles may be parked in Lot 6. Access to the Loading Dock is to be arranged with the Warehouse Manager and only for loading or unloading materials.

F. OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

1. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

2. Working space and space available for storing materials is within the 10th floor space adjacent to Vacuum Pumps to be replaced.

3. Workers are subject to rules of the Medical Center applicable to their conduct.

4. Execute work in such a manner as to interfere as little as possible with work being done by others.

5. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building

22 62 00 - 4 structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and

Contractor's personnel, except as permitted by COR where required by limited working space.

a. Do not store materials and equipment in other than assigned areas.

b. Schedule delivery of materials with the VA Warehouse Supervisor.

6. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places; or, in absence of such indication, where directed by COR.

7. Phasing:

a. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

b. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

Arrange such phasing to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.

Recommended phasing as follows:

c. Phase 1: Replace Vacuum Pump #1. Certify Vacuum Pump #1.

d. Phase 2: Replace Vacuum Pump #2.

e. Phase 3: Install Vacuum Pump #3. Certify pumps #2 and #3.

f. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in

22 62 00 - 5 affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel.

8. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing vacuum pipes, or conduits, wires, cables, etc. of utility services, they shall be cut and capped at suitable places.

a. No utility service may be interrupted without prior approval of

COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval.

b. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

c. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than

Contractor's normal working hours.

d. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

e. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

9. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within

22 62 00 - 6 furred spaces, in unfinished areas, or within walls or partitions;

so that they are completely behind the finished surfaces.

10. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

a. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

G. ALTERATIONS

1. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer.

This report shall list by rooms and spaces:

a. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of the building.

b. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

2. Re-Survey: Thirty days before expected final inspection date, the

Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

a. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures;

and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

3. Protection: Provide the following protective measures:

a. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

b. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately

22 62 00 - 7 protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

H. DISPOSAL AND RETENTION

1. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

a. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center. Weights of recycled metals shall be reported to the COR. Coordinate oil removal with COR; VA shall dispose of used oil.

I. RESTORATION

1. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

2. Upon completion of contract, deliver work complete and undamaged.

Existing work (mechanical and electrical work, etc. disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

3. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

4. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

22 62 00 - 8

J. WARRANTY MANAGEMENT

1. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of

Construction in at least 30 days before the completion of installation. Submit one set of the warranty management plan.

Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract.

The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work.

The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period.

Include in the warranty management plan, but not limited to, the following:

a. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

b. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

c. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include associated pumps, motors, and control systems.

d. A list for each warranted equipment item, feature of construction or system indicating:

1. Name of item.

2. Model and serial numbers.

3. Location where installed.

4. Name and phone numbers of manufacturers and suppliers.

5. Name and phone numbers of manufacturers or suppliers.

22 62 00 - 9

6. Names, addresses and phone numbers of sources of spare parts.

7. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

8. Starting point and duration of warranty period.

9. Summary of maintenance procedures required to continue the warranty in force.

10. Cross-reference to specific pertinent Operation and

Maintenance manuals.

11. Organizations, names and phone numbers of persons to call for warranty service.

12. Typical response time and repair time expected for various warranted equipment.

e. Procedure and status of tagging of all equipment covered by extended warranties.

2. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

a. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting

Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

b. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

c. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions.

Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

3. Contractor’s Response to Construction Warranty Service Requirements:

22 62 00 - 10

4. Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the

Government will perform the work and back charge the construction warranty payment item established.

a. Warranty Response Action: Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

b. Warranty Tags: At the time of installation, submit record copies of the warranty tags. The date of acceptance and the QC signature must remain blank until the project is accepted. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

K. USE OF ROADWAYS

1. For hauling, use only established public roads and roads on Medical

Center.

2. Access to Loading Docking for loading and unloading is coordinated with the Warehouse Supervisor.

22 62 00 - 11

L. USE OF ELEVATORS

1. The Contractor and his personnel shall be permitted use elevator designated “S-5” to hoist equipment and supplies to the 9th floor within the weight limit of the elevator. Access to 10th floor for equipment may be hoisted through hatch access.

M. AVAILABILITY AND USE OF UTILITY SERVICES

1. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies.

N. TESTS

1. Testing shall be performed per specification section 226200.

O. INSTRUCTIONS

1. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

2. Manuals: Maintenance and operating manuals and one compact disc (one hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished.

Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

3. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned

22 62 00 - 12

Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the technical sections 226200. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The

Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

P. GOVERNMENT-FURNISHED PROPERTY

1. There is no GFE planned for this project.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the test by the basic designation only.

B. American Society of Mechanical Engineers (ASME):

A13.1-2007 (R2013)......Scheme for the Identification of Piping Systems

B16.15-2013.............Cast Copper Alloy Threaded Fittings: Classes

125 and 250

B16.22-2013.............Wrought Copper and Copper Alloy Solder-Joint

Pressure Fittings

B16.50-2013.............Wrought Copper and Copper Alloy Braze-Joint

Pressure Fittings

B40.100-2013............ Pressure Gauges and Gauge Attachments

22 62 00 - 13

ASME Boiler and Pressure Code -

BPVC Section IX-2015....Welding, Brazing, and Fusing Qualifications

C. American Society of Sanitary Engineers (ASSE):

6000 Series-2012........Professional Qualifications Standard for

Medical Gas Systems Personnel

D. American Society for Testing and Materials (ASTM):

B43-2014................Standard Specification for Seamless Red Brass

Pipe, Standard Sizes

B687-1999 (2011)........Standard Specification for Brass, Copper, and

Chromium-Plated Pipe Nipples

B819-2000 (R2011).......Standard Specification for Seamless Copper Tube for Medical Gas Systems

D1785-2012..............Standard Specification for Poly (Vinyl

Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120

E. American Welding Society (AWS):

A5.8M/A5.8-2011-AMD1....Specification for Filler Metals for Brazing and

Braze Welding

B2.2/B2.2M-2010.........Specification for Brazing Procedure and

Performance Qualification

F. Compressed Gas Association (CGA):

P-9-2008................The Inert Gases: Argon, Nitrogen, and Helium

G. Manufacturing Standardization Society (MSS):

SP-72-2010a.............Ball Valves with Flanged or Butt-Welding Ends

For General Service

SP-110-2010.............Ball Valves Threaded, Socket-Welding, Solder

Joint, Grooved and Flared Ends

H. National Electrical Manufacturers Association (NEMA):

ICS 6-1993 (R2001, R2006) Industrial Control and Systems Enclosures

I. National Fire Protection Association (NFPA):

70-2014.................National Electrical Code

99-2015.................Health Care Facilities Code

1.4 SUBMITTALS

A. Information and material submitted under this section shall be marked

“SUBMITTED UNDER SECTION 22 62 00, VACUUM SYSTEMS FOR LABORATORY AND

HEALTHCARE FACILITIES”, with applicable paragraph identification.

B. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, 22 62 00 - 14 materials, applications, standard compliance, model numbers, size, and capacity.

1. Complete specifications for the product intended to be installed, dimensional drawings, and wiring schematics.

2. Package drawing indicating package style, dimensions when complete, method of disassembly and sizes of subsections for rigging and installation.

3. Piping.

4. Valves.

5. Gages.

6. Vacuum switches.

7. Vacuum pump systems. Benchmark system: Quincy QSV-345 10HP 330 CFM

Rotary Screw Vacuum Pump. (Provide certified pump test data at startup):

a. Pumps: Manufacturer and model.

b. Pump performance curves.

c. Pump operating speed (RPM).

d. Capacity: Free air exhaust from 65 and 80 kPa (19- and 24-inches

Hg) gage vacuum (L/s) (SCFM).

e. Capacity: Expanded air capacity at 65 and 80 kPa (19- and 24-inches Hg) gage vacuum (L/s) (SCFM).

f. Type of bearing in pump.

g. Type of lubrication.

h. Type and adjustment of drive.

i. Electric motors: Manufacturer, frame and type.

j. Speed of motors (RPM).

k. Current characteristics and horsepower of motors.

l. Receiver capacity and rating.

m. Silencers: Manufacturer, type and model.

C. Certification: The completed systems have been installed, tested, purged and analyzed in accordance with the requirements of this specification. Certification shall be submitted to COR.

D. A notarized affidavit from the verifier stating that the verifier undertakes to verify this project and thus agrees to disqualify themselves from supplying any equipment which shall be included in the scope of their verification. No verifier who supplies equipment shall be permitted to verify that equipment. Statement declaring that the vacuum system manufacturer has no fiduciary interest in the verifier

22 62 00 - 15 and that the verifier is not an agent or representative of the vacuum system manufacturer. Statement declaring that the contractor has no fiduciary interest in the third-party verifier and that the third-party verifier has no fiduciary interest in the contractor.

1.5 QUALITY ASSURANCE

A. Contractor shall include with submittals an affidavit attesting to compliance with all relevant paragraphs of NFPA 99 most recent edition.

Personnel assembling medical vacuum and WAGD system shall meet NFPA 99

5.1.10.11.10 “Qualification of Installers” and hold medical gas endorsements as under ASSE Standard Series 6000. The Contractor shall, on company letterhead, furnish documentation attesting that all installed piping materials were purchased cleaned and complied with the requirements of NFPA 99 5.1.10.1 and 5.1.10.2. Electrical Control systems and Medical vacuum Alarms are to be UL listed as assemblies with label affixed. Medical vacuum is to be wired in accordance with

NEC.

B. Equipment Installer: The equipment installer shall provide documentation proving that the personnel installing the equipment meet the standards set by ASSE Standard Series 6000. Show technical qualifications and previous experience in installing medical gas equipment on three similar projects. Submit names, phone numbers, and addresses of referenced projects. The equipment installer shall perform the following coordination functions:

1. Coordinate with other trades to ensure timely installations and avoid conflicts and interferences.

2. The contractor shall coordinate with the Medical Vacuum System.

Verifier to deliver a complete, operational, and tested medical gas installation ready for owner’s use.

C. Equipment Supplier: The Equipment supplier shall demonstrate evidence of installing equivalent product at three installations similar to this project that has been in satisfactory and efficient operation for three years. Names, phone numbers, and addresses where the product is installed shall be submitted for verification.

D. Medical Gas System Testing Organization: The Medical vacuum verifier shall show documentation proving that the medical gas verifier meets the standards set by ASSE Standard Series 6000. The testing shall be conducted by a party technically competent and experienced in the field of medical gas pipeline testing. Such testing shall be performed by a

22 62 00 - 16 third-party testing company independent of the installing and general contractor.

E. Names of three projects where testing of vacuum systems has been performed by the testing agency shall be provided. The name of the project, names of such persons at that project who supervised the work for the project owner, or who accepted the report for the project owner, and a written statement that the projects listed required work of similar scope to that set forth in this specification shall be included in the documentation.

F. The testing agency's detailed procedure shall be followed in the testing of this project and submitted to COR 10 working days prior to testing. In the testing agency’s procedure documentation, include details of the testing sequence, procedures for cross connection tests, outlet function tests, alarm tests, purity tests, etc., as required by this specification.

G. Installation and Startup: The manufacturer shall provide factory authorized representatives to review the installation and perform the initial startup of the system. The factory authorized representatives shall submit a report to the COR and to the Contractor. The Contractor shall make all corrections identified by the factory authorized representative at no additional cost or time to the Government.

H. Certification: The Final inspection documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits allowed by this specification.

1.6 MAINTENANCE SUPPORT

A. The medical vacuum equipment manufacturer shall demonstrate a national factory direct service capability able to perform major overhauls. The medical vacuum equipment manufacturer shall provide factory direct preventative maintenance contract. The medical vacuum equipment manufacturer shall provide formal maintenance training courses. See paragraph “Demonstration and Training” for additional requirements for training. Servicer shall be no more than 100 miles away, be capable of responding within 4 hours, and provide certified personnel to perform all work.

22 62 00 - 17

1.7 AS-BUILT DOCUMENTATION

A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.

B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices such as damper and door closure interlocks shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner shall be required to employ shall be inserted into the

As-Built documentation.

C. Certification documentation shall be provided to COR 10 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits specified.

PART 2 - PRODUCTS

2.1 GENERAL PRODUCT REQUIREMENTS

A. A single Medical Vacuum Equipment Manufacturer shall supply the medical vacuum system(s) and equipment to include outlets, valves and gauges, valve boxes, alarm panels, manifolds, medical air, instrument air, vacuum and WAGD sources.

2.2 PIPING

A. Copper Tubing: Copper tubing shall be type "K", ASTM B819, seamless copper tube, hard drawn temper, with wrought copper fittings conforming to ASME B16.22 or brazing fittings complying with ASME B16.50. The copper tubing size designated reflects nominal inside diameter. All tubing and fittings shall be labeled "ACR/OXY", "OXY", "OXY/MED", "ACR/MED", or "MED".

B. Brazing Alloy: The brazing alloy shall comply with AWS A5.8M/A5.8, Classification BCuP, greater than 538 degrees C (1000 degrees F)

22 62 00 - 18 melting temperature. Flux shall be strictly prohibited for copper-to-copper connections.

C. Screw Joints: Screw joints shall use polytetrafluoroethylene (Teflon) tape.

D. Use only copper or stainless-steel pipes for discharge from vacuum product (exhaust pipes).

E. Memory metal couplings shall have temperature and pressure ratings not less than that of a brazed joint.

F. Piping identification labels shall be applied at time of installation in accordance with NFPA 99. Supplementary color identification shall be in accordance with CGA Pamphlet C-9.

G. Special Fittings: The following special fittings shall be permitted to be used in lieu of brazed joints:

1. Memory-metal couplings having temperature and pressure ratings joints not less than that of a brazed joint.

2. Listed or approved metallic gas tube fittings that, when made up, provide a permanent joint having the mechanical, thermal, and sealing integrity of a brazed joint.

3. Dielectric fittings where required by the manufacturer of special medical equipment to electrically isolate the equipment from the piping distribution system.

4. Axially swaged, elastic strain preload fittings providing metal to metal seal having pressure and temperature ratings not less than that of a brazed joint and when complete are permanent and non-separable.

2.3 VALVES

A. Ball: Ball valves shall be in line, other than zone valves in cabinets.

1. 65 mm or DN65 (2-1/2 inches) and less: Ball valves shall be bronze/ brass body, MSS SP-72 and MSS SP-110, Type II, Class 150, Style 1, with tubing extensions for brazed connections, full ported, three piece or double union end connections, Teflon seat seals, full flow, 4138 kPa (600 psig) WOG minimum working pressure, with locking type handle.

2. 75 mm or DN75 to 100 mm or DN100 (3 to 4 inches): Ball valves shall be bronze/ brass body, MSS SP-72 and MSS SP-110, Type II, Class 150, Style 1 with tubing extensions brazed to flanges, full ported, three-piece, double seal, Teflon seals, full flow, 4138 kPa (600 psig) WOG minimum working pressure, with locking type handle.

22 62 00 - 19

B. Check:

1. 75 mm or DN75 (3 inches) and less: Check valves shall be brass and bronze body, straight through design for minimum pressure drop, spring loaded, self-aligning with Teflon cone seat, vibration free, silent operation, supplied NPT female threads at each end with flow direction arrow permanently cast into body, 2758 kPa (400 psig) WOG minimum working pressure.

2. 100 mm or DN100 (4 inches) and greater: Check valves shall be iron body, bronze trim, swing type, vertical or horizontal installation, flange connection, 1035 kPa (150 psig) WSP with flow direction arrow permanently cast into body.

2.4 GAGES

A. Vacuum Gages:

1. For vacuum line adjacent to source equipment the vacuum gages shall comply with ASME B40.100, vacuum gage type, size 115 mm (4-1/2 inches), gage listed for vacuum, accurate to within 2-1/2 percent, with metal case. The vacuum gage range shall be 0 to 100 kPa (0 to

29.5 inches Hg). Dial graduations and figures shall be black on a white background, or white on a black background. Label shall be for vacuum service. A gage cock shall be installed. Dual scale gages shall be installed for vacuum system.

2. For vacuum service upstream of main shut-off valve: A 40 mm (1-1/2 inches) diameter gage shall be provided with steel case, bourdon tube and brass movement, dial range 0 to 100 kPa (0 to 29.5 inches

Hg). Dual scale gages shall be provided for vacuum system.

2.5 MEDICAL VACUUM SYSTEMS

A. Provide medical vacuum package, complying with NFPA 99 in all respects, as specified and scheduled in the contract documents. All components shall be factory packaged (pre-wired and pre-piped), on a steel base, or tank mounted. All package piping shall be type “K” rigid copper.

Provide discharge separator/silencer.

B. All components shall be valved as permitted NFPA 99 to allow service to any component without interrupting vacuum service to the facility during any maintenance operation or any condition of single fault failure. The design load shall be met with a single unit. Each pump

22 62 00 - 20 exhaust shall be isolated by a union fitting permitting capping for service removal.

C. A complete and operational plant (source equipment) shall be furnished consisting of pumps and controls capable of providing the scheduled capacity with one pump in service; this is 330 SCFM. All capacities shall be indicated in SCFM at 483 mm (19 inches Hg) and 600 mm (24 inches Hg).

D. System shall be completely factory assembled, requiring only interconnection between modules on site. Systems requiring on site assembly other than interconnection are prohibited (replacement of components removed for shipping is permitted).

E. Motor and Starter: Maximum 40 degrees C (104 degrees °F) ambient temperature rise, close coupled to a NEMA rated, High Efficiency, TEFC motor with a service factor of 1.15, ball bearings. Motor shall be of such capacity that brake horsepower required by driver equipment at normal rated capacity will not exceed nameplate rating of the motor.

Provide each motor with automatic fully enclosed variable frequency drive.

F. Each pump shall include inlet and outlet flex connectors supplied by the medical vacuum equipment manufacturer.

G. Programmable Logic Controllers (PLC) or Direct Digital Controls (DDC) can be used to implement operating logic. Controls shall have integral memory and EPROM backup. Controls shall control the automatic alternation lead-lag with one standby of the vacuum pumps with provisions for simultaneous operation if required, and automatic activation of reserve or lag unit if required. A lag alarm on control cabinet and contacts for the master alarm shall be provided.

H. The complete control system and all electrical components shall be NEMA

ICS 6, Type 12 and UL labeled. The control system shall provide:

1. Automatic lead/lag sequencing including self-adjusting minimum run timers which adaptively optimize the number of pump starts based on demand.

2. Circuit breaker disconnects for each vacuum pump with external operators. Units with fuses instead of circuit breakers in motor circuit are prohibited. The control system shall include an automatic minimum run time adjustment to automatically adjust run time based on demand.

3. Full voltage motor starters with overload protection.

22 62 00 - 21

4. Redundant 120-volt control circuit transformers.

5. Visual and audible reserve unit alarm with isolated contacts for remote alarms and audio cancel.

6. Control cabinet shall have lighted HOA selector switches

7. Panel mounted vacuum gauge, external visual lights indicating on/off status, audible and visual signals for thermal overload, oil discharge filter differential pressure or back pressure alarm, and alarm silence button.

8. Contacts for external oil discharge filter differential pressure or back pressure alarm

9. If silence has been pressed, audible and visual signal would be reactivated upon second alarm condition. Alarm shall be reset upon correction of original signal.

10. Monitoring system for indication of pump operating status, running hours, temperature and pressure readouts, warning indications, fault and shutdown indications. Monitoring system shall be capable of integration into Building Automation System. Monitoring system outputs display on HMI panel.

11. Control of Variable frequency drives for optimizing energy usage.

I. The medical vacuum pumps shall be direct-drive oil-lubricated rotary screw type. The oil recirculation design shall be differential pressure type with full recirculation and multistage exhaust oil separation rated at not less than 99.998 percent efficiency. Each medical vacuum pump shall be provided with an oil non return valve, filter change indicator for exhaust oil separation filters, and high discharge temperature switch. Service to the oil lubrication system filters shall not require disconnection of the exhaust piping. The oil lubrication system shall be enclosed in one module to minimize oil leaks. Vacuum pumps that have exterior piping for oil lubrication are prohibited.

Medical Vacuum pumps requiring separate electrical motors for oil cooling are prohibited. Rubber hose flexible connections and hose clamps are prohibited.

J. Include a modulating inlet valve with each pump system to reduce the flow and then the power when pressure is close to atmospheric pressure.

K. The complete medical vacuum pump system and all electrical components shall be factory tested prior to shipment by the medical vacuum equipment manufacturer.

22 62 00 - 22

L. Controls:

1. Automatic: Adjustable, vacuum operated, automatic, electric switch to start and stop motor at receiver vacuum indicated. Provide heavy duty alternator, automatic, operating on a timed basis, to alternate the pumps by time forced alternation for Lead-Lag with standby for combination A-B, B-C, C-A.

2. Control panel: Housed in a NEMA ICS 6, Type 12, listed, dust proof enclosure; prewired to include all specified electrical, electronic and electro pneumatic devices. Include wiring diagrams and operating descriptions in the cabinet. Include the following:

a. Circuit breakers for each control and motor circuit.

b. Hand off automatic selector switch for each pump.

c. Hour meter for each pump, may be in HMI.

d. Control circuit transformers.

e. One magnetic motor starter for each pump as required for Variable frequency drive.

f. Provide panel with external visual (lights, red for running, green for off; can be on HMI) and audible (horn/buzzer) signals.

The signals provided include:

1) Pump in operation (visual only).

2) Thermal overload shutdown (visual and audible).

3) Oil discharge filter differential pressure or back pressure alarm (visual), with contacts for external signal. Wire to master alarm panel.

4) Cancel button, which shall silence an audible alarm, reactivate should a second alarm occur while the horn is silenced, and reset automatically upon correction of the original signal.

5) Visual indications may be displayed on package unit HMI.

M. Bio-Hazard Safety Statement: "BIOHAZARD CAUTION: Fluid and waste material inside vacuum pipelines and vacuum equipment may be contaminated with blood and other potentially infectious material.

Construction and service personnel shall use proper PERSONAL PROTECTIVE

EQUIPMENT and practice UNIVERSAL PRECAUTIONS when opening or servicing vacuum systems."

22 62 00 - 23

PART 3 - EXECUTION

3.1 INSTALLATION

A. All installation shall be performed in strict accordance with NFPA 99

5.1.10. Brazing procedures shall be as detailed in NFPA 99 5.1.10.4.

Brazing shall be performed only by Brazers qualified under NFPA 99

5.1.10.11.10. Where piping runs underground, the installation shall be made in accordance with NFPA 99 5.1.10.11.5.

B. Contractor shall furnish 100 mm (4 inches) high concrete housekeeping pads. The contractor shall furnish inertia bases in lieu of housekeeping pads where the equipment installed is not factory isolated by the manufacturer. Anchor bolts shall be cast into bases.

C. Open ends of tube shall be capped or plugged at all times or otherwise sealed until final assembly to prevent infiltration of any foreign matter.

D. Piping shall be cut square and accurately with a tube cutter (sawing is prohibited) to measurements determined at place of installation. The tubing shall be reamed to remove burrs, being careful not to expand tube, and so no chips of copper remain in the tube. The tubing shall be worked into place without springing or forcing. The tubing shall be bottomed in socket so there are no gaps between tube and fitting. Care shall be exercised in handling equipment and tools used in cutting or reaming of tube to prevent oil or grease from being introduced into the tubing. Where contamination has occurred, material shall be no longer suitable for vacuum service and new, sealed tube sections used.

E. Piping shall be supported with pipe trays or hangers at intervals as shown on the contract drawings or as defined in NFPA 99. Piping shall not be supported by other piping. Isolation of copper piping from dissimilar metals shall be of a firm, positive nature. Duct tape is prohibited as an isolation material.

F. Valves and other equipment shall be rigidly supported to prevent strain on tube or joints.

G. Piping exposed to physical damage shall be protected.

H. During any brazing operation, the interior of the pipe shall be purged continuously with oil free, dry nitrogen NF, following the procedure in

NFPA 99 5.1.10.4.5. At the completion of any section, all open pipe ends shall be capped using an EXTERNAL cap. The flow of purged gas shall be maintained until joint is cool to touch. The use of flux is

22 62 00 - 24 prohibited when making of joints between copper-to-copper pipes and fittings.

I. Threaded joints in piping systems shall be avoided whenever possible.

Where unavoidable, make up the male threads with polytetrafluoroethylene (such as Teflon) tape. Liquid sealants are prohibited.

J. Tubing shall not be bent. Fittings shall be used in all change of direction or angle.

K. Pressure and vacuum switches, transmitter and gauges shall be installed to be easily accessed. Pressure switch and sensors shall be installed with orifice nipple between the pipeline and switches/sensors.

L. Pipe labeling shall be applied during installation process and not after installation is completed. Size of legend letters shall be in accordance with ASME A13.1.

M. Piping shall be labeled with name of service, identification color and direction of flow. Labels shall be placed at least once every 6.1 m (20 feet) of linear run or once in each story (whichever is more frequent).

A label shall additionally be placed immediately on each side of all wall or floor penetrations. Pipe labels shall be self-adhesive vinyl type or other water-resistant material with permanent adhesive colored in accordance with NFPA 99 Table 5.1.11 and shall be visible on all sides of the pipe. Each master alarm signal shall be labeled for function after ring out. Labels shall be permanent and of a type approved by the VAMC.

N. Alarms and valves shall be labeled for service and areas monitored or controlled. Coordinate with the VAMC for final room or area designations. Valves shall be labeled with name and identification color of the gas and direction of flow.

3.2 INSTALLER TESTING

A. Prior to declaring the lines ready for final verification, the installing contractor shall strictly follow the procedures for verification as described in NFPA 99 5.1.12.2 and attest in writing over the notarized signature of an officer of the installing company the following:

1. That all brazing was conducted by Brazer qualified to ASSE Standard

Series 6000 and holding current medical gas endorsements.

2. That all brazing was conducted with nitrogen purging. (Procedure per

NFPA 99 5.1.10.4.5).

22 62 00 - 25

3. That the lines have been blown clear of any construction debris using oil free dry nitrogen or air are clean and ready for use.

(Procedure per NFPA 99 5.1.12.2.2).

4. That the assembled piping, prior to the installation of any devices, maintained a test pressure 1 1/2 times the standard pressures listed in NFPA 99 Table 5.1.11 without leaks. (Procedure per NFPA 99

5.1.12.2.3).

5. That after installation of all devices, the pipeline was proven leak free for 24 hours at a pressure 20 percent above the standard pressures listed in NFPA 99 Table 5.1.11. (Procedure per NFPA 99

5.1.12.2. 6)

6. That the systems have been checked for cross connections and none were found. (Procedure per NFPA 99 5.1.12.2.4)

7. That the…