This document contains an amendment to a solicitation for a design-build renovation project. The Department of Veterans Affairs is seeking offers to renovate Building 204 at its medical center to install a new SPECT CT imaging system. The amendment provides responses to questions from potential offerors to clarify the scope of work. It specifies that asbestos and lead are not expected but the contractor is responsible for verifying existing conditions. Wall protection, flooring repairs, and painting requirements are clarified. It also addresses access needed for structural and electrical assessments below the imaging suite. The solicitation number is 36C24923R0128 and offers are due by May 23, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| first site visit sign in sheet.pdf | ||
| second site visit sign in sheet.pdf | ||
| 36C24923R0128 0004.docx | DOCX document | |
| 36C24923R0128 0003.docx | DOCX document | |
| 621-23-101 SOW 6-21-2023.pdf | ||
| 621-23-101 SOW 5-24-2023.pdf | ||
| 36C24923R0128 0001.docx | DOCX document | |
| 36C24923R0128_1.docx | DOCX document | |
| Past Performance Questionnaire.pdf | ||
| DUNS _ TAX ID.docx | DOCX document | |
| 621-23-101 SOW 5-2-2023.pdf | ||
| WD TN20230191 05122023.pdf | ||
| SCA 2015-4641 Rev 19 12272022.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 621-23-4-5082-0025 621-23-101 90C Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders
36C24923R0128 05-23-2023
X x x
621-3630162-5082-854200-3220 23NRNR001
x The purpose of this amendment is to answer the questions submitted and the revised SOW. See page 2 for details.
Jeannette Morphew Contracting Officer RFIs DB Renovate Bldg 204 for SPECT CT
1. Are there known hazards (Examples: Asbestos, Lead paint, mold, contamination, etc.…).
Answer: B204 was built in 1999. Asbestos and lead are not expected to be present. No known mold contamination.
2. Are Arc Flash studies required (I see labels on all panels)
Answer: For circuits coming from existing panels, arc flash study is not required. For new electrical equipment, arc flash study is required.
3. Are vibration studies required
Answer: To be determined by the A/E.
4. When was the last time the electrical panels were certified for torque, accurate breaker labels, accurate panel labeling
Answer: Unknown.
5. What seismic zone is this project in…are there seismic or “event” requirements for this project
Answer: Zone 2A. To be determined by A/E.
6. Will any of this work require entrance into a confined space?
Answer: The VA does not anticipate any confined space work. However, if the contractor’s means and methods require entry into confined space, a permit will be required.
7. What all tests and exams are required for this project?
Answer: To be determined by the A/E.
8. May we have a copy of “As Builts” for this area?
Answer: See Appendix F in revised SOW. Contractor to verify existing conditions.
9. May we have structural drawings for this area and for this specific site.
a. Note: The existing Siemens Symbia Evo Nuc Med (Gamma Camera) equipment and ancillary weight in the suite is approximately 9,000 lbs and the proposed Siemens Symbia SpecCT equipment and ancillaries’ weight is approximately 14,000 lbs. This will require design and possible structural mods below the suite.
Answer: The floor capacity has been previously evaluated by a structural PE and was determined to support the new equipment.
10. Considering structural mods and below floor electrical work will be likely, can the facility provide Architectural floor plans and MEP drawings of the space directly below the proposed SpecCT location?
Answer: See Appendix A in revised SOW. Contractor to verify existing conditions.
11. Can the floor space and above ceiling space below the proposed project be access and inspected for as-built conditions?
Answer: Yes. A second site visit will be scheduled.
12. Has Siemens prepared a manufacturer approved site specific preliminary or final equipment drawings for this location?
Answer: No, Contractor shall coordinate with Siemens.
13. The clearance distance from the end of table to control window wall appears to be less than required by VA Design Guides / FGI/ industry standard. Are VA facility and department reps aware of and OK with this.
Answer: See drawing G-001 in Appendix A in revised SOW.
14. Will the Siemens SepcCT come with the sometimes-optional PHS (Patient Handling System)?
Answer: No
15. The solicitation title refers to “EP Cath Lab”. In addition to the Nuclear Medicine equipment replacement outlined in the solicitation docs, is there additional work and equipment elsewhere in the facility involving EP Cath Lab Equipment?
Answer: EP Cath Lab was in error and is not part of this solicitation.
16. May we have Electrical, plumbing, fire alarm/fire sprinkler, and Mechanical drawings for this area…including ductwork, locations of VAV’s etc.
Answer: See Appendix F in revised SOW. Contractor to verify existing conditions.
17. May we have a floor plan for this area and the floor underneath this project
Answer: See Appendix A in revised SOW.
18. Please provide a facility drawing/ site drawing that will show where the contractor and subcontractors may park their vehicles, storage trailer and a dumpster
Answer: To be field coordinated with COR.
19. May we have a facility specifications list for finishes?
Paint (Wall and trim paints), flooring, base, ceiling tile and grid, sinks -handles And faucets (that would be used in this installation), laminate color/s, solid surface material (company, product, product color and number) door materials, (Frames, hardware, locks and handles, kick plates, hinges, door operators, hand wave devices, finishes [door laminates or type of wood door and finishes]).
Answer: Please reference VA TIL guidelines. Also Appendix F in revised SOW.
a. Note 10 in the drawings refer to wall protection on 3 walls of room L254C and room L254. Please clarify the meaning of this note and the boundaries of application in room L254.
Answer: Wall protection is to be installed on 3 walls of L254C and the new construction side of L254.
b. The scope says to paint new walls and trim, but the drawings in note 9 says to prep and paint new and existing walls in L254, L254C and L254D…which is correct?
Answer: The scope and Note 9 are revised. New and existing walls in L254C are to be painted. Walls in L254 and L254D that connect to new walls shall be painted corner to corner. Touch up work and paint may be required in L254C to repair any damage during construction.
20. If the existing flooring is not still in production, and facility does not have any in stock what product and color should be used for the new floors. Note, even if the same item is being produced, a different batch may not match the existing product in the area/s.
Answer: Existing stock is unknown.
a. (The scope says in 2.1.6 that the DB is to install all new flooring in L254C and L254 D but the drawings in note 6 say to patch or replace floor finish…which is correct?)
Answer: All new flooring is not required. Patch and repair only.
21. What size view window is required for this project
Answer: A/E shall coordinate with Siemens.
22. What all tests or exams are required to be taken to work on this project. Facility noted that there is a program that must be taken on site prior to anyone beginning work on the project. It is only given once a month. That means a project start could be delayed depending on when the program is given.
a. What days of the month are the facility safety programs given.
Answer: First Tuesday in the month.
23. Will the existing curtains and rails be reused on this project. Who is responsible for their removal and storage?
Answer: Contractor to remove existing and store for reinstallation.
24. What should the verbiage on the new “In Use” light be?
Answer: “DO NOT ENTER”
25. Telecommunications room. Since we may have to get into this room for connections is a security requirement needed for access?
Answer: Access will be provided as necessary.
A.1 List of Attachments See attached document: 621-23-101 SOW 6-21-2023.