This document is an amendment to a solicitation for lightning protection system inspection and testing services at multiple buildings on the Murfreesboro Campus of the Veterans Affairs Medical Center. The amendment provides answers to questions from potential offerors, including clarifying that the contractor must supply their own safety equipment for roof inspections due to steep pitch, and attaching single line diagrams and three line drawings of the campus buildings. Inspection and testing is required at 17 buildings ranging from 1 to 5 stories, with a variety of roof types. The total estimated square footage of lightning protection systems to be inspected is over 500,000 square feet. The solicitation number is 36C24923Q0197 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 for a period of 120 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ACY Arc Flash Drawings 09 22 22.pdf | ||
| 36C24923Q0197 0002_1.docx | DOCX document | |
| ACY Updated One Line working 12 29 2020 Model 1.pdf | ||
| 36C24923Q0197 0001.pdf | ||
| 36C24923Q0197 0001_1.docx | DOCX document | |
| 36C24923Q0197 RFQ Triannual Murfreesboro Campus.pdf | ||
| 36C24923Q0197_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 30
626-24-1-4138-0002 n/a
Department of Veterans Affairs
Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400
Murfreesboro TN 37129
90C
Network Contracting Office 9
Department of Veterans Affairs
Network Contracting Office (90C)
1639 Medical Center Parkway Suite 400
Murfreesboro TN 37129
To all Offerors/Bidders
36C24923Q0197
04-10-2023
X
X X
X 1
The purpose of this amendment is to attach the questions and answers for this requirement. Two documents are also being added to assist companies with preparing their quotes based upon the questions asked.
All other terms and conditions remain unchanged.
Lori Ellis
Contracting Officer
Questions & Answers
1. Are you able to provide single line and/or three line drawings for the York Campus?
Answer: Yes, two different sets of drawings are attached.
ACY Arc Flash Drawings 09.22.22 26 26 pages
ACY Updated One-Line (working 12-29-2020) Model (1) 1 page
2. Do you also have the roof safety protocol on the lighting suppression systems? For example, is the customer providing the safety equipment for these inspections or does the contractor need to provide it?
Answer: The contractor provides their own safety equipment. Due to the steep pitch of most buildings have 6/12 pitch, a few with 5/12 and a couple with 7/12, the last triennial they did not physically get on these roofs to inspect but utilized a drone for the visual inspection in a logical and cost effective manner to attempt to meet the simplistic approach in the VA Directive, my thoughts being a visual inspection of LP system of each building containing a system and possibly a simple measurement of the down rod resistance to mother earth, I would except a measurement with an inductive clamp-on ground meter. The VHA directive indicates ground resistance no greater than 25 ohms for grounding systems and touches on the LP system in the same paragraph. I do realize this will not be a cheap endeavor as we have many buildings on this facility with LPS installed but I am not going to tear up the facility or run into astronomical requirements and cost to perform an inspection of a system that has been here for eons.
Below are the buildings I am well aware of having installed LPSs. Most of these buildings have had roof replacements within the last 10-12 years.
Bldg. 1 – 5 story 97,529 sqft. external system, pitched roof
Bldg. 2 – 2 story 46,633 sqft. external system with an antenna mast, flat roof
Bldg. 3 - 3 story 50,958 sqft. external system, pitched roof
Bldg. 4 – 2 story with theater roof, 18, 306 sqft external system, flat roof
Bldg. 5 – 3 story 45634 sqft. external system, pitched roof
Bldg. 6 – 3 story 55,559 sqft. external system pitched roof
Bldg. 7 – 3 story 41178 sqft. external system mostly pitched roof with 2 areas flat
Bldg. 8 – 3 story 40,509 sqft external system mostly pitched roof with 2 areas flat
Bldg. 9 – 3 story 45,627 sqft. external system, pitched roof
Bldg. 10 – 3 story 15,300 sqft. external system mostly pitched roof with 2 areas flat
Bldg. 11 – 3 story 17,250 sqft. external system mostly pitched roof with 2 areas flat
Bldg. 13 – 1 story 4840 sqft. external system, pitched roof, 2 years ago the system was modified with new roof
Bldg. 16 – boiler plant 4844, certified installation 4 years ago, flat roofs, square footage may be shy and not including the CoGen plant roof - +/- 3000sqft
Bldg. 17 – 1 story, 9430 sqft, internal installation certified 3-4 years ago, combination flat/pitched roof
Bldg. 106 – 1 story 14, 550 sqft, internal installation, certified 3 years ago, low sloped roof (3-4/12)
Bldg. 107 multi-level, 57,100 sqft, external installation, flat roofs
Bldg. 116, , mainly 1 level with 2nd floor service room, 55245 sqft. external system mostly flat roof with pitched service room roof
Bldg. 117, 2 story 53,690 sqft. with 2- 3rd floor service rooms, external system, flat roofs
Bldg. 120. 2 story 12,264 sqft, I believe it is all external system, flat roof
Cooling towers 4000 sqft (+/-) certified external system 2 years ago.
Most buildings have 6/12 pitch, a few with 5/12 and a couple with 7/12.
See attached document: ACY Arc Flash Drawings 09.22.22.
See attached document: ACY Updated One-Line(working 12-29-2020) Model (1).