2022-04-21_TVHS - Murfreesboro_MRI_RF shielding report.pdf

PDF 208 KB Posted

Attached to
Y1DA--626A4-CSI-105 DB Prepare Site for York MRI
Solicitation number
36C24922R0066
Issued by

About this file

This document contains an RF shielding test confirmation report for the Murfreesboro VA Medical Center and a related federal contract opportunity notice. The RF shielding test report details measurements of RF shielding effectiveness of barriers surrounding an existing 1.5T MRI system at the medical center. Measurements were taken at 63.9 and 127.8 MHz at various points around the MRI scan room and on the roof. All observed results exceeded 100dB attenuation except at the door, where 52dB and 42dB were observed at the two frequencies tested. The conclusions determined that maintenance may be required for the door or door seal to meet the desired shielding effectiveness standards.

The related federal contract opportunity is a solicitation notice for project 626A4-CSI-105 to design and build site preparations for a new York MRI at the Alvin C. York VA Medical Center campus. The opportunity is issued by the VA Veterans Health Administration VISN 9. No further details are provided on requirements, response dates, or award information.

View the file

Other files

File Type Posted
SPD-final 1of2.pdf PDF
SPD-final 2of2.pdf PDF
Binder1.pdf PDF
36C24922R0066 0001.docx DOCX document
SCA Wage Determination.pdf PDF
Drawings 626A4-CSI-105 Combined MRI_35percent.pdf PDF
UEI _ TAX ID.docx DOCX document
P07_Wage Determination_Dated 06-27-2022.pdf PDF
RFI Form.docx DOCX document
Past Performance Questionnaire.pdf PDF
36C24922R0066_2.docx DOCX document
COVID Language_Updated 12-14-2021.docx DOCX document
Specs_626A4-CSI-105 Prepare Site for MRI Specs.pdf PDF
Contractor EMR Certification Form.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 21, 2022

RF Shielding Test Confirmation – Murfreesboro VA Medical Center

Purpose:

Measure RF shielding effectiveness of existing RF shield

Method:

RF Shielding attenuation was measured using the MPB Group SEMS system with dipole antennae in the horizontal and vertical fields (Model: TX-Unit, Serial Number: 0140IST21OC20, calibrated on-site April 21, 2022). Measurements were made at 63.9 and 127.8 MHz. The summary results of the observed attenuation values are shown in Table 1. Measurements were taken at approximately 2-m intervals, at a distance of 1 m from the wall, along each wall and on the roof. The measurement locations around the MRI scanner room (Room G09G) are shown in Figure 1. Additional measurements were taken on the roof and around the roof vent and room door using the “sniff” loop antenna.

Results:

All observed results exceeded 100 dB attenuation (shielding effectiveness), except for at the door. At the door, 52 dB at 63.9 MHz and 42 dB at 127.8 MHz was observed.

Conclusions:

Generally, the attenuation levels are consistent with what would be expected for 1.5 T MRI systems.

However, some maintenance to the door and/or door seal may be required to bring all barriers up to the desired shielding effectiveness.

Peter Jenkins, PhD, CHP, DABR

Measurement location (dB) freq. (MHz) 1 2 3 4 5 6

63.9 52 119 120 119 120 119

127.8 42 114 113 106 103 102 freq. (MHz) 7 8 9 10 11 12

63.9 117 117 127 119 116 117

127.8 106 101 114 106 104 104 freq. (MHz) 13 14 15 (roof)

(roof) 17 (vent) 18 (vent)

63.9 128 118 101 108 105 105

127.8 107 102 98 102 101 101

Table 1. Observed attenuation values at each measurement point. All values in units of dB. Note low attenuation measurements observed at scanner room door (position #1).

Figure 1. Floor plan showing MRI scan room (G09G) and surrounding areas. Numbers indicate approximate points of RF shielding effectiveness measurements, corresponding to the values listed in Table 1. Not shown on this image are the measurements points on the roof of the scan room and around the roof vent.