This document provides details of a federal contract opportunity to renovate Building 8 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovations to Building 8 phase II, with an estimated value between $500,000 and $1,000,000. The solicitation will be posted on August 23, 2021 and close on September 23, 2021. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. Questions regarding this opportunity must be submitted in writing to the named Contracting Officer by email and include the project number, name, and solicitation number in the subject line.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
James H. Quillen VA Medical Center Mountain Home, TN
VA #
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
VOLUME 1
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 09-11
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-13 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 11-08 01 33 23 Master Submittal List 01 41 00 Air Barrier System 01 42 19 Reference Standards 09-11 01 74 19 Construction Waste Management 09-13 01 81 11 Sustainable Design Requirements 02-13
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 04-13 02 83 33.13 Lead-Based Paint Removal and Disposal 08-11
DIVISION 03 – CONCRETE 10-12
03 30 53 Cast-in-Place Concrete (Short Form)
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 09-11 06 20 00 Finish Carpentry 06-13 06 52 13 Fiberglass-Reinforced Plastic (FRP) 06 65 00 Plastic Simulated Wood
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 03-09 07 31 26 Slate Shingles 07 60 00 Flashing and Sheet Metal 12-13 07 71 00 Roof Specialties 07 84 00 Firestopping 10-11 07 92 00 Joint Sealants 12-11
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-13 08 14 00 Interior Wood Doors 10-12 08 17 10 Integrated Door Assemblies
00 01 10-1
VA #
08 31 13 Access Doors and Frames 10-11 08 52 13 Aluminum-clad Wood Double Hung Windows 08 71 00 Door Hardware 12-13 08 80 00 Glazing 08 90 00 Louvers and Vents 10-11
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 10-11 09 22 16 Non-Structural Metal Framing 07-13 09 29 00 Gypsum Board 02-13 09 30 13 Ceramic/Porcelain Tiling 05-12 09 51 00 Acoustical Ceilings 12-13 09 65 13 Resilient Base and Accessories 10-11 09 65 19 Resilient Tile Flooring 03-11 09 68 00 Carpeting 10-11 09 91 00 Painting 07-13
DIVISION 10 – SPECIALTIES
10 13 00 Directories 11-11 10 14 00 Signage 11-11 10 21 13 Toilet Compartments 05-12 10 26 00 Wall and Door Protection 01-11 10 28 00 Toilet, Bath, and Laundry Accessories 11-11 10 44 13 Fire Extinguisher Cabinets 11-11 10 51 00 Lockers 11-11 10 81 19 Architectural Bird Control
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 12 24 21 Lightproof Shades 11-11 12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
14 21 00 Electric Traction Elevators 09-11
00 01 10-2
VA #
VOLUME 2
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression 11-09 21 13 13 Wet-Pipe Sprinkler Systems 05-08
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 04-11 22 05 12 General Motor Requirements for Plumbing Equipment 12-09 22 05 19 Meters and Gages for Plumbing Piping 02-10 22 05 23 General-Duty Valves for Plumbing Piping 12-09 22 07 11 Plumbing Insulation 05-11 22 11 00 Facility Water Distribution 01-14 22 11 23 Domestic Water Pumps 01-14 22 13 00 Facility Sanitary and Vent Piping 12-09 22 14 29 Sump Pumps 01-11 22 33 00 Electric Domestic Water Heaters 02-10 22 35 00 Domestic Water Heat Exchangers 22 40 00 Plumbing Fixtures 01-14
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 11-10 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 11-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
11-10
23 05 93 Testing, Adjusting, and Balancing for HVAC 05-11 23 07 11 HVAC and Boiler Plant Insulation 05-11 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 09-12 23 21 23 Hydronic Pumps 02-10 23 22 13 Steam and Condensate Heating Piping 03-10 23 22 23 Steam Condensate Pumps 02-10 23 23 00 Refrigerant Piping 02-10 23 25 00 HVAC Water Treatment 02-10 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 11-09 23 36 00 Air Terminal Units 03-10 23 37 00 Air Outlets and Inlets 11-09 23 40 00 HVAC Air Cleaning Devices 02-12 23 64 00 Packaged Water Chillers 04-11 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 81 00 Decentralized Unitary HVAC Equipment 02-11 23 82 00 Convection Heating and Cooling Units 04-11 23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
00 01 10-3
VA #
VOLUME 3
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 12-12 26 05 13 Medium-Voltage Cables 12-12 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 05 41 Underground Electrical Construction 12-12 26 05 73 Overcurrent Protective Device Coordination Study 12-12 26 09 23 Lighting Controls 05-14 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 12-12 26 22 00 Low-Voltage Transformers 12-12 26 24 13 Distribution Switchboards 12-12 26 24 16 Panelboards 05-14 26 27 26 Wiring Devices 12-12 26 29 11 Motor Controllers 12-12 26 29 21 Enclosed Switches and Circuit Breakers 12-12 26 41 00 Facility Lightning Protection 12-12 26 43 13 Surge Protector Device 12-12 26 51 00 Interior Lighting 12-12
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 11-09 27 05 26 Grounding and Bonding for Communications Systems 10-06 27 05 33 Raceways and Boxes for Communications Systems 12-05 27 10 00 Structured Cabling 12-05 27 11 00 Communications Equipment Room Fittings 06-13 27 15 00 Communications Horizontal Cabling 06-13 27 41 31 Master Antenna Television Equipment and Systems 27 51 16 Public Address and Mass Notification Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 06-13 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 13 00 Physical Access Control Systems 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 10-12 31 20 11 Earthwork (Short Form)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 32 12 16 Asphalt Paving 32 17 23 Pavement Markings
00 01 10-4
VA #
32 31 13 Chain Link Fences and Gates 32 90 00 Planting 10-11
DIVISION 33 – UTILITIES
33 40 00 Storm Drainage
00 01 10-5
VA #
SECTION 01 32 16.15
PROJECT SCHEDULES
PART 1- GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project
Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract
(including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and progress reporting with and to the Contracting Officer's Representative (COR).
B. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.
C. The Contractor’s representative shall have the option of developing the project schedule within their organization or to engage the services of an outside consultant. If an outside scheduling consultant is utilized, Section 1.3 of this specification will apply.
1.3 CONTRACTOR'S CONSULTANT:
A. The Contractor shall submit a qualification proposal to the COR, within
10 days of bid acceptance. The qualification proposal shall include:
1. The name and address of the proposed consultant.
2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph.
3. A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling services. These representative samples shall be of similar size and scope.
B. The Contracting Officer has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of the qualification proposal.
In case of disapproval, the Contractor shall resubmit another consultant within 10 calendar days for renewed consideration. The Contractor shall
01 32 16.15 - 1
VA #
have their scheduling consultant approved prior to submitting any schedule for approval.
1.4 COMPUTER PRODUCED SCHEDULES
A. The contractor shall provide monthly, to the Department of Veterans
Affairs (VA), all computer-produced time/cost schedules and reports generated from monthly project updates. This monthly computer service will include: three copies of up to five different reports (inclusive of all pages) available within the user defined reports of the scheduling software approved by the Contracting Officer; a hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data; and the resulting monthly updated schedule in PDM format. These must be submitted with and substantively support the contractor’s monthly payment request and the signed look ahead report. The COR shall identify the five different report formats that the contractor shall provide.
B. The contractor shall be responsible for the correctness and timeliness of the computer-produced reports. The Contractor shall also responsible for the accurate and timely submittal of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.
C. The VA will report errors in computer-produced reports to the
Contractor’s representative within ten calendar days from receipt of reports. The Contractor shall reprocess the computer-produced reports and associated diskette(s), when requested by the Contracting Officer’s representative, to correct errors which affect the payment and schedule for the project.
1.5 THE COMPLETE PROJECT SCHEDULE SUBMITTAL
A. Within 45 calendar days after receipt of Notice to Proceed, the
Contractor shall submit for the Contracting Officer's review; three blue line copies of the interim schedule on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved CPM schedule program. The submittal shall also include three copies of a computer-produced activity/event ID schedule showing project duration;
phase completion dates; and other data, including event cost. Each activity/event on the computer-produced schedule shall contain as a minimum, but not limited to, activity/event ID, activity/event description, duration, budget amount, early start date, early finish date, late start date, late finish date and total float. Work activity/event relationships shall be restricted to finish-to-start or start-to-start without lead or lag constraints. Activity/event date
01 32 16.15 - 2
VA #
constraints, not required by the contract, will not be accepted unless submitted to and approved by the Contracting Officer. The contractor shall make a separate written detailed request to the Contracting
Officer identifying these date constraints and secure the Contracting
Officer’s written approval before incorporating them into the network diagram. The Contracting Officer’s separate approval of the Project
Schedule shall not excuse the contractor of this requirement. Logic events (non-work) will be permitted where necessary to reflect proper logic among work events, but must have zero duration. The complete working schedule shall reflect the Contractor's approach to scheduling the complete project. The final Project Schedule in its original form shall contain no contract changes or delays which may have been incurred during the final network diagram development period and shall reflect the entire contract duration as defined in the bid documents. These changes/delays shall be entered at the first update after the final
Project Schedule has been approved. The Contractor should provide their requests for time and supporting time extension analysis for contract time as a result of contract changes/delays, after this update, and in accordance with Article, ADJUSTMENT OF CONTRACT COMPLETION.
D. Within 30 calendar days after receipt of the complete project interim
Project Schedule and the complete final Project Schedule, the
Contracting Officer or his representative, will do one or both of the following:
1. Notify the Contractor concerning his actions, opinions, and objections.
2. A meeting with the Contractor at or near the job site for joint review, correction or adjustment of the proposed plan will be scheduled if required. Within 14 calendar days after the joint review, the Contractor shall revise and shall submit three blue line copies of the revised Project Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified by the Contracting Officer. The revised submission will be reviewed by the Contracting Officer and, if found to be as previously agreed upon, will be approved.
E. The approved baseline schedule and the computer-produced schedule(s) generated there from shall constitute the approved baseline schedule until subsequently revised in accordance with the requirements of this section.
F. The Complete Project Schedule shall contain approximately 750 work activities/events.
01 32 16.15 - 3
VA #
Mountain Home, TN
1.6 WORK ACTIVITY/EVENT COST DATA
A. The Contractor shall cost load all work activities/events except procurement activities. The cumulative amount of all cost loaded work activities/events (including alternates) shall equal the total contract price. Prorate overhead, profit and general conditions on all work activities/events for the entire project length. The contractor shall generate from this information cash flow curves indicating graphically the total percentage of work activity/event dollar value scheduled to be in place on early finish, late finish. These cash flow curves will be used by the Contracting Officer to assist him in determining approval or disapproval of the cost loading. Negative work activity/event cost data will not be acceptable, except on VA issued contract changes.
B. The Contractor shall cost load work activities/events for guarantee period services, test, balance and adjust various systems in accordance with the provisions in Article, FAR 52.232 – 5 (PAYMENT UNDER
FIXED-PRICE CONSTRUCTION CONTRACTS) and VAAR 852.236 – 83 (PAYMENT UNDER
FIXED-PRICE CONSTRUCTION CONTRACTS).
C. In accordance with FAR 52.236 – 1 (PERFORMANCE OF WORK BY THE
CONTRACTOR) and VAAR 852.236 – 72 (PERFORMANCE OF WORK BY THE
CONTRACTOR), the Contractor shall submit, simultaneously with the cost per work activity/event of the construction schedule required by this
Section, a responsibility code for all activities/events of the project for which the Contractor's forces will perform the work.
D. The Contractor shall cost load work activities/events for all BID ITEMS including ASBESTOS ABATEMENT. The sum of each BID ITEM work shall equal the value of the bid item in the Contractors' bid.
1.7 PROJECT SCHEDULE REQUIREMENTS
A. Show on the project schedule the sequence of work activities/events required for complete performance of all items of work. The Contractor
Shall:
1. Show activities/events as:
a. Contractor's time required for submittal of shop drawings, templates, fabrication, delivery and similar pre-construction work.
b. Contracting Officer's and Architect-Engineer's review and approval of shop drawings, equipment schedules, samples, template, or similar items.
c. Interruption of VA Facilities utilities, delivery of Government furnished equipment, and rough-in drawings, project phasing and any other specification requirements.
01 32 16.15 - 4
VA #
d. Test, balance and adjust various systems and pieces of equipment, maintenance and operation manuals, instructions and preventive maintenance tasks.
e. VA inspection and acceptance activity/event with a minimum duration of five work days at the end of each phase and immediately preceding any VA move activity/event required by the contract phasing for that phase.
2. Show not only the activities/events for actual construction work for each trade category of the project, but also trade relationships to indicate the movement of trades from one area, floor, or building, to another area, floor, or building, for at least five trades who are performing major work under this contract.
3. Break up the work into activities/events of a duration no longer than
20 work days each or one reporting period, except as to non-construction activities/events (i.e., procurement of materials, delivery of equipment, concrete and asphalt curing) and any other activities/events for which the COR may approve the showing of a longer duration. The duration for VA approval of any required submittal, shop drawing, or other submittals will not be less than 20 work days.
4. Describe work activities/events clearly, so the work is readily identifiable for assessment of completion. Activities/events labeled
"start," "continue," or "completion," are not specific and will not be allowed. Lead and lag time activities will not be acceptable.
5. The schedule shall be generally numbered in such a way to reflect either discipline, phase or location of the work.
B. The Contractor shall submit the following supporting data in addition to the project schedule:
1. The appropriate project calendar including working days and holidays.
2. The planned number of shifts per day.
3. The number of hours per shift.
Failure of the Contractor to include this data shall delay the review of the submittal until the Contracting Officer is in receipt of the missing data.
C. To the extent that the Project Schedule or any revised Project Schedule shows anything not jointly agreed upon, it shall not be deemed to have been approved by the COR. Failure to include any element of work required for the performance of this contract shall not excuse the
Contractor from completing all work required within any applicable
01 32 16.15 - 5
VA #
completion date of each phase regardless of the COR’s approval of the
Project Schedule.
D. Compact Disk Requirements and CPM Activity/Event Record Specifications:
Submit to the VA an electronic file(s) containing one file of the data required to produce a schedule, reflecting all the activities/events of the complete project schedule being submitted.
1.8 PAYMENT TO THE CONTRACTOR:
A. Monthly, the contractor shall submit the AIA application and certificate for payment documents G702 & G703 reflecting updated schedule activities and cost data in accordance with the provisions of the following
Article, PAYMENT AND PROGRESS REPORTING, as the basis upon which progress payments will be made pursuant to Article, FAR 52.232 – 5
(PAYMENT UNDER FIXED-PRICE CONSTRUCTION CONTRACTS) and VAAR 852.236 – 83
(PAYMENT UNDER FIXED-PRICE CONSTRUCTION CONTRACTS). The Contractor shall be entitled to a monthly progress payment upon approval of estimates as determined from the currently approved updated project schedule. Monthly payment requests shall include: a listing of all agreed upon project schedule changes and associated data; and an electronic file (s) of the resulting monthly updated schedule.
B. Approval of the Contractor’s monthly Application for Payment shall be contingent, among other factors, on the submittal of a satisfactory monthly update of the project schedule.
1.9 PAYMENT AND PROGRESS REPORTING
A. Monthly schedule update meetings will be held on dates mutually agreed to by the COR and the Contractor. Contractor and their CPM consultant
(if applicable) shall attend all monthly schedule update meetings. The
Contractor shall accurately update the Project Schedule and all other data required and provide this information to the COR three work days in advance of the schedule update meeting. Job progress will be reviewed to verify:
1. Actual start and/or finish dates for updated/completed activities/events.
2. Remaining duration for each activity/event started, or scheduled to start, but not completed.
3. Logic, time and cost data for change orders, and supplemental agreements that are to be incorporated into the Project Schedule.
4. Changes in activity/event sequence and/or duration which have been made, pursuant to the provisions of following Article, ADJUSTMENT OF
CONTRACT COMPLETION.
01 32 16.15 - 6
VA #
5. Completion percentage for all completed and partially completed activities/events.
6. Logic and duration revisions required by this section of the specifications.
7. Activity/event duration and percent complete shall be updated independently.
B. After completion of the joint review, the contractor shall generate an updated computer-produced calendar-dated schedule and supply the
Contracting Officer’s representative with reports in accordance with the
Article, COMPUTER PRODUCED SCHEDULES, specified.
C. After completing the monthly schedule update, the contractor’s representative or scheduling consultant shall rerun all current period contract change(s) against the prior approved monthly project schedule.
The analysis shall only include original workday durations and schedule logic agreed upon by the contractor and resident engineer for the contract change(s). When there is a disagreement on logic and/or durations, the Contractor shall use the schedule logic and/or durations provided and approved by the resident engineer. After each rerun update, the resulting electronic project schedule data file shall be appropriately identified and submitted to the VA in accordance to the requirements listed in articles 1.4 and 1.7. This electronic submission is separate from the regular monthly project schedule update requirements and shall be submitted to the resident engineer within fourteen (14) calendar days of completing the regular schedule update.
Before inserting the contract changes durations, care must be taken to ensure that only the original durations will be used for the analysis, not the reported durations after progress. In addition, once the final network diagram is approved, the contractor must recreate all manual progress payment updates on this approved network diagram and associated reruns for contract changes in each of these update periods as outlined above for regular update periods. This will require detailed record keeping for each of the manual progress payment updates.
D. Following approval of the CPM schedule, the VA, the General Contractor, its approved CPM Consultant, the COR, and all subcontractors needed, as determined by the SRE, shall meet to discuss the monthly updated schedule. The main emphasis shall be to address work activities to avoid slippage of project schedule and to identify any necessary actions required to maintain project schedule during the reporting period. The
Government representatives and the Contractor should conclude the meeting with a clear understanding of those work and administrative
01 32 16.15 - 7
VA #
actions necessary to maintain project schedule status during the reporting period. This schedule coordination meeting will occur after each monthly project schedule update meeting utilizing the resulting schedule reports from that schedule update. If the project is behind schedule, discussions should include ways to prevent further slippage as well as ways to improve the project schedule status, when appropriate.
1.10 RESPONSIBILITY FOR COMPLETION
A. If it becomes apparent from the current revised monthly progress schedule that phasing or contract completion dates will not be met, the
Contractor shall execute some or all of the following remedial actions:
1. Increase construction manpower in such quantities and crafts as necessary to eliminate the backlog of work.
2. Increase the number of working hours per shift, shifts per working day, working days per week, the amount of construction equipment, or any combination of the foregoing to eliminate the backlog of work.
3. Reschedule the work in conformance with the specification requirements.
B. Prior to proceeding with any of the above actions, the Contractor shall notify and obtain approval from the COR for the proposed schedule changes. If such actions are approved, the representative schedule revisions shall be incorporated by the Contractor into the Project
Schedule before the next update, at no additional cost to the
Government.
1.11 CHANGES TO THE SCHEDULE
A. Within 30 calendar days after VA acceptance and approval of any updated project schedule, the Contractor shall submit a revised electronic file
(s) and a list of any activity/event changes including predecessors and successors for any of the following reasons:
1. Delay in completion of any activity/event or group of activities/events, which may be involved with contract changes, strikes, unusual weather, and other delays will not relieve the
Contractor from the requirements specified unless the conditions are shown on the CPM as the direct cause for delaying the project beyond the acceptable limits.
2. Delays in submittals, or deliveries, or work stoppage are encountered which make rescheduling of the work necessary.
3. The schedule does not represent the actual prosecution and progress of the project.
4. When there is, or has been, a substantial revision to the activity/event costs regardless of the cause for these revisions.
01 32 16.15 - 8
VA #
B. CPM revisions made under this paragraph which affect the previously approved computer-produced schedules for Government furnished equipment, vacating of areas by the VA Facility, contract phase(s) and sub phase(s), utilities furnished by the Government to the Contractor, or any other previously contracted item, shall be furnished in writing to the Contracting Officer for approval.
C. Contracting Officer's approval for the revised project schedule and all relevant data is contingent upon compliance with all other paragraphs of this section and any other previous agreements by the Contracting
Officer or the VA representative.
D. The cost of revisions to the project schedule resulting from contract changes will be included in the proposal for changes in work as specified in FAR 52.243 – 4 (Changes) and VAAR 852.236 – 88 (Changes –
Supplemental), and will be based on the complexity of the revision or contract change, man hours expended in analyzing the change, and the total cost of the change.
E. The cost of revisions to the Project Schedule not resulting from contract changes is the responsibility of the Contractor.
1.12 ADJUSTMENT OF CONTRACT COMPLETION
A. The contract completion time will be adjusted only for causes specified in this contract. Request for an extension of the contract completion date by the Contractor shall be supported with a justification, CPM data and supporting evidence as the COR may deem necessary for determination as to whether or not the Contractor is entitled to an extension of time under the provisions of the contract. Submission of proof based on revised activity/event logic, durations (in work days) and costs is obligatory to any approvals. The schedule must clearly display that the
Contractor has used, in full, all the float time available for the work involved in this request. The Contracting Officer's determination as to the total number of days of contract extension will be based upon the current computer-produced calendar-dated schedule for the time period in question and all other relevant information.
B. Actual delays in activities/events which, according to the computer-produced calendar-dated schedule, do not affect the extended and predicted contract completion dates shown by the critical path in the network, will not be the basis for a change to the contract completion date. The Contracting Officer will within a reasonable time after receipt of such justification and supporting evidence, review the facts and advise the Contractor in writing of the Contracting Officer's decision.
01 32 16.15 - 9
VA #
C. The Contractor shall submit each request for a change in the contract completion date to the Contracting Officer in accordance with the provisions specified under FAR 52.243 – 4 (Changes) and VAAR 852.236 –
88 (Changes – Supplemental). The Contractor shall include, as a part of each change order proposal, a sketch showing all CPM logic revisions, duration (in work days) changes, and cost changes, for work in question and its relationship to other activities on the approved network diagram.
D. All delays due to non-work activities/events such as RFI’s, WEATHER, STRIKES, and similar non-work activities/events shall be analyzed on a month by month basis.
- - - E N D - - -
01 32 16.15 - 10
VA #
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
1-1. Refer to Articles titled SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(FAR 52.236-21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL
CONDITIONS.
1-2. For the purposes of this contract, samples, test reports, certificates, and manufacturers' literature and data shall also be subject to the previously referenced requirements. The following text refers to all items collectively as SUBMITTALS.
1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Materials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:
A. Satisfactory written evidence is presented to, and approved by
Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;
B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or;
C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government.
1-4. Forward submittals in sufficient time to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items. Delays attributable to untimely and rejected submittals will not serve as a basis for extending contract time for completion.
1-5. Submittals will be reviewed for compliance with contract requirements by
Architect-Engineer, and action thereon will be taken by COR on behalf of the Contracting Officer.
1-6. Upon receipt of submittals, Architect-Engineer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to this file and identification number to expedite replies relative to previously approved or disapproved submittals.
1-7. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefor by Contracting Officer, adjustment in contract price
01 33 23 - 1
VA #
and time will be made in accordance with Articles titled CHANGES (FAR
52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the GENERAL
CONDITIONS.
1-8. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The Contracting
Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed positioning of items.
1-9. Submittals must be submitted by Contractor only and shipped prepaid.
Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals.
A. Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate. Submit other samples in single units unless otherwise specified. Submit shop drawings, schedules, manufacturers' literature and data, and certificates in quadruplicate, except where a greater number is specified.
B. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Letter shall be sent via first class mail and shall contain the list of items, name of Medical Center, name of
Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact identification of location for each item), manufacturer and brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for approval.
1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered "unclaimed goods" and held for a limited time only.
2. Each sample, certificate, manufacturers' literature and data shall be labeled to indicate the name and location of the Medical Center, name of Contractor, manufacturer, brand, contract number and ASTM or
Federal Specification Number as applicable and location(s) on project.
3. The VA adheres to the “Buy American Act”. The “Act” requires that products installed at VA facilities shall be manufactured in the
United States. Submittals should include documentation that the
01 33 23 - 2
VA #
proposed products comply with the “Act” or how it falls under one or more of the three exemptions.
4. Required certificates shall be signed by an authorized representative of manufacturer or supplier of material, and by Contractor.
C. If submittal samples have been disapproved, resubmit new samples as soon as possible after notification of disapproval. Such new samples shall be marked "Resubmitted Sample" in addition to containing other previously specified information required on label and in transmittal letter.
D. Approved samples will be kept on file by the COR at the site until completion of contract, at which time such samples will be delivered to
Contractor as Contractor's property. Where noted in technical sections of specifications, approved samples in good condition may be used in their proper locations in contract work. At completion of contract, samples that are not approved will be returned to Contractor only upon request and at Contractor's expense. Such request should be made prior to completion of the contract. Disapproved samples that are not requested for return by Contractor will be discarded after completion of contract.
E. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. These drawings and schedules shall be stamped and signed by Contractor certifying to such check.
1. For each drawing required, submit one legible photographic paper or vellum reproducible.
2. Reproducible shall be full size.
3. Each drawing shall have marked thereon, proper descriptive title, including Medical Center location, project number, manufacturer's number, reference to contract drawing number, detail Section Number, and Specification Section Number.
4. A space 120 mm by 125 mm (4-3/4 by 5 inches) shall be reserved on each drawing to accommodate approval or disapproval stamp.
5. Submit drawings, ROLLED WITHIN A MAILING TUBE, fully protected for shipment.
6. One reproducible print of approved or disapproved shop drawings will be forwarded to Contractor.
7. When work is directly related and involves more than one trade, shop drawings shall be submitted to Architect-Engineer under one cover.
01 33 23 - 3
VA #
1-10. Samples, shop drawings, test reports, certificates and manufacturers' literature and data, shall be submitted for approval to
HARRELL DESIGN GROUP, PC
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
1-11. At the time of transmittal to the Architect-Engineer, the Contractor shall also send a copy of the complete submittal directly to the COR.
F. Master Submittal List (follows after this page).
01 33 23 - 4
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
01 33 23 THIS SECTION APPLIES TO ALL SUBMITTALS IN THE
PROJECT SPECIFICATIONS
01 32 16.15 01 41 00 1 1.5.A Certified Written Report 01 57 19 1 1.4.A Environmental Protection Plan
1 1.5.B Demolition Debris Management Plan 1 1.5.C Designated Waste Management Plan Manager 1 1.5.D Monthly Summary 1 1.5.A Sustainable Design 1 1.5.B Project Materials Cost 1 1.5.C Construction Waste Management 1 1.5.D Construction Indoor Air Quality Management 1 1.5.F Progress Reports
02 82 13.41 1 1.6.B Manufacturers Catalog Data 02 83 33.13 1 1.6.C Instructions
1 1.6.D Certifications and Statements
1 1.3.B Manufacturers Literature and Data 1 1.3.C Shop Drawings 1 1.3.D Manufacturers Certificates 1 1.3.E Design Calculations 1 1.3.F Setting Drawings and Installation Instructions
06 10 00 1 1.3.B Shop Drawings 1 1.3.B Shop Drawings 2 1.3.C Samples 3 1.3.D Manfacturers Literature and Data 1 1.04.B Shop Drawings 2 1.04.C Samples 3 1.04.D Quality Assurance 4 1.04.E Close-out
01 81 11
05 50 00
06 20 00
06 65 00
DIVISION 01
DIVISION 03
DIVISION 05
DIVISION 06
DIVISION 02
01 74 19
01 00 00
DIVISION 04 - NOT USED
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
1.3.B Manufacturers Literature and Data 1.3.C Certificates
1 1.4.B Samples 2 1.4.C Certification
07 60 00 1 1.4.B Shop Drawings 1 1.4.B Samples 2 1.4.C Shop Drawings
1.4.D Manufacturers Literature and Data 1.4.E Certificates 1.3.B Manufacturers Literature and Data 1.3.C Classification Numbers 1.3.D Certified Lab Test Reports
1 1.3.B Source Limitations 2 1.4.B Samples 3 1.4.C Manufacturers Literature and Data
08 11 13 1 1.4.B Manufacturers Literature and Data 1 1.3.B Samples 1 1.3.C Shop Drawings 1 1.3.D Manufacturers Literature and Data 1 1.3.E Laboratory Test Reports 1 1.3.B Shop Drawings 1 1.3.C Manufacturers Literature and Data 1 1.5.B Product Data 1 1.5.C Shop Drawings 1 1.5.D Samples 1 1.5.E Warranty 1 1.6.B Hardware Schedule 1 1.6.C Samples and Manufacturers Literature 1 1.5.C Warranty 1 1.5.D Manufacturers Literature and Data 2 1.5.E Samples 1 1.3.B Shop Drawings 3 1.3.C Manufacturers Literature and Data
DIVISION 08
07 21 13
07 31 26
07 71 00
07 84 00
07 92 00
08 14 00
08 31 13
08 52 13
DIVISION 07
08 71 00
08 80 00
08 90 00
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
1 1.4.B Manufacturers Literature and Data 2 1.4.C Shop Drawings 1 1.4.D Test Results 1 1.4.B Manufacturers Literature and Data 2 1.4.C Shop Drawings 2 1.4.D Samples 1 1.4.E Test Results 2 1.3.B Samples 2 1.3.C Product Data 2 1.3.D Certification 2 1.3.B Samples 1 1.3.C Manufacturers Literature and Data 1 1.3.D Manufacturers Certificates 1 1.3.B Manufacturers Literature and Data 1 1.3.C Samples 1 1.3.B Manufacturers Literature and Data 1 1.3.C Samples 1 1.3.D Shop Drawings 1 1.4.B Product Data 1 1.4.C Samples 1 1.4.D Shop Drawings 1 1.4.E Maintenance Data 1 1.3.B Manufacturers Literature and Data 1 1.3.C Sample Panels 1 1.3.D Indentitiy Markers 1 1.3.E Manufacturers Certificates
DIVISION 09
09 22 16
09 29 00
09 30 13
09 51 00
09 65 13
09 65 19
09 68 00
09 91 00
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
1 1.4.B Shop Drawings 2 1.4.C Manufacturers Literature and Data 3 1.4.D Samples 1 1.4.B Shop Drawings 2 1.4.C Manufacturers Literature and Data 3 1.4.D Samples 1 1.4.C Manufacturers Literature 2 1.4.D Samples
1.4.E Shop Drawings 1.4.F Layout Patterns
1 1.4.C Manufacturers Literature 2 1.4.D Samples
1.4.E Shop Drawings 1.4.F Layout Patterns 1.3.A Product Data 1.3.B Warranty
2 1.3.C Samples 1 1.3.C Manufacturers Literature and Data 2 1.3.D Shop Drawings 1 1.3.B Shop Drawings 2 1.3.C Manufacturers Literature and Data 1 1.3.B Shop Drawings 2 1.3.C Manufacturers Literature and Data
10 44 13 1 1.3.B Manufacturers Literature and Data 1 1.4.B Shop Drawings
1.4.C LEED Requirements 1.4.D Maintenance Data
3 1.4.E Selection Samples
1 1.4.B Samples 2 1.4.C Manufacturers Literature and Data
12 24 21 1 1.3.B Manufacturers Literature and Data
1 1.02.A Fixture Approval Drawings 2 1.02.B Maintenance Data
10 21 13
10 26 00
10 28 00
10 51 00
10 11 13
10 11 23
12 24 00
DIVISION 10
DIVISION 12
10 13 00
10 14 00
10 18 91
DIVISION 14
14 21 00
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
1 1.3 C. Shop drawings and Calculations, sprinkler pipe and heads and associated equipment for sprinkler system except Group 2 Items:
2 1.3 C. 5. Final Documents
1 1.4 Meters and Gages 2 1.5 As-built Documentation 1 1.4 A. B. C. Valves 2 1.4 D. E. O&Ms and System Readiness Checklists
220711 1 1.4 Insulation Materials 221100 1 1.4 Water pipe and fittings
1 1.4 A. B. Circulating Pump 2 1.4 C. O&Ms 1 1.4 Sanitary Sewer Pipe and Fittings 2 1.6 As-Built Documentation 1 1.3 A. B. Sump Pump and Controls 2 1.3 C. D. Test data and O&Ms 1 1.4 A. thru F. Cut sheets, Drawings, Certifications.
2 1.4 G. O&M and Spare Parts Data 1 1.4 A. thru F. Cut sheets, Drawings, Certifications.
2 1.4 G. O&M and Spare Parts Data
224000 1 1.3 Plumbing Fixtures
223300
223500
220519
220523
221123
221300
221429
DIVISION 21
DIVISION 22
21 13 13
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
1.3.F Welding Certificates 1.3.G Equipment Installation Instructions 1.4.D Confirmation of Equipment Coordination 1.4.E Equipment and System Shop Drawing 1.4.H Complete Systems Layout / Coordination Drawings
2 1.4.J Maintenance Data and Operation Instructions 1.4.K Approved Equipment Submittals to T&B Contractor
2.8 Materials and Equipment Identification
2.11 HVAC Pipe and Equipment Supports, Hangers, Rails, Etc.
2.12 Pipe Sleeves
1.4.B Vibration Isolators and Bases 1.4.C Isolation Load Calculations 1.4.D Seismic Restraint Provisions and Calculations 1.4.B T&B Agency Qualifications 1.4.C Complete Set of Applicable AABC or NEBB Publications
2 1.4.D Design Review Report 1.4.D Systems Inspection Report 1.4.D Duct Air Leakage Test Report
4 1.4.D Systems Readiness Report 1.4.D Intermediate T&B Report 1.4.E Final T&B Report 1.4.B Shop Drawings 1.4.C Insulation Samples
2.1 Mineral Fiber Insulation
2.2 Mineral Wool or Refractory Fiber Insulation
2.3 Rigid Cellular Phenolic Foam Insulation
2.4 Cellular Glass Closed-Cell Insulation
2.6 Flexible Elastomeric Ceullular Thermal Insulation
2.8 Calcium Cilicate Insulation
2.9 Insulation Facings and Jackets
2.10 Removable Insulation Jackets
2.11 Pipe Covering Protection Saddles
2.12 Adhesive, Mastic, Cement
2.13 Mechanical Fasteners
23 07 11
DIVISION 23
23 05 93
23 05 41
23 05 11
MASTER SUBMITTAL LIST
VA #
Section Group Article Description 1.7.B Wiring Diagrams and Points Lists 1.7.B Control Dampers and Valves Schedule and Cutsheets
1.7.B Catalog Cutsheets of All DDC Equipment 1.7.B Color Prints of Proposed Graphics 1.7.B BACnet Protocol Implementation Conformance
Statement for each Device 1.7.B Instrumentation Lists for Each System 1.7.B Riser Diagrams
2 1.7.D Software Licenses 3 1.7.E As-built Control Drawings 4 1.7.F O&M Manuals 5 1.7.G Performance Report Prior to Final Inspection
1.4.B Pipe, Fittings, Valves, Strainers, Etc.
1.4.C ASME Forms 1.4.D Welding Certificates 1.4.E Shop Drawings
2 1.4.F As-built Piping Diagrams 1 1.4.B Pumping Equipment 2 1.4.C O&M Manuals 3 1.4.D Pump Curves
1.4.B Pipe and Equipment Supports 1.4.B Pipe and Tubing, Fittings, Flanges, Gaskets 1.4.B Valves and Strainers 1.4.B Flexible Connectors and Expansion Joints 1.4.B Gages 1.4.B Thermometers and Test Wells 1.4.B Seismic Bracing Details for Piping
2 1.4.C Manufacturer's Certified Data Report, ASME Form U-1
3 1.4.D Coordination Drawings 4 1.4.E As-built Piping Diagrams 1 1.4.B Pumping Equipment 2 1.4.C O&M Manuals 3 1.4.D Pump Curves
123 22 13
23 21 23
23 21 13
23 09 23
23 22 23
MASTER SUBMITTAL LIST
VA #
Section Group Article Description 1.4.B Shop Drawings 1.4.C Welding Certificates 1.4.D Equipment Design Manuals
2.1 Pipe and Fittings
2.2 Gages
2.3 Thermometers and Test Wells
2.7 Pipe/Conduit Roof Penetration Cover
1.4.B Cleaning Compounds and Recommended Procedures for use 1.4.B Chemical Treatment for Closed Systems 1.4.C Water Analysis Verification 1.4.D MSDS for all Proposed Equipment
2 1.4.E O&M Manuals 1.4.B Rectangular Ducts 1.4.B Round Ducts 1.4.B Volume Dampers 1.4.B Upper Hanger Attachments 1.4.B Fire and Smoke Dampers 1.4.B Flexible Duct 1.4.B Flexible Connections 1.4.B Instrument Test Fittings 1.4.C Coordination Drawings 1.4.B Centrifugal Fans 1.4.B Prefabricated Roof Curbs 1.4.B Power Roof and Wall Ventilators 1.4.C Certifed Sound Power Levels 1.4.D Motor Ratings Types and Electrical Characteristics 1.4.E Roof Curbs 1.4.F Belt Guards
2 1.4.G O&M Manuals 3 1.4.H Certified Fan Performance Curves
1.4.B Air Terminal Units 1.4.C Compliance Certificates
2 1.4.D O&M Manuals 1.4.B Intake/Exhaust Hoods 1.4.B Diffusers, Registers and Grilles 1.4.C Coordination Drawings
23 37 00
23 36 00
23 34 00
23 31 00
23 25 00
23 23 00
MASTER SUBMITTAL LIST
VA #
Section Group Article Description 1.4.B Extended Surface Air Filters 1.4.C Filter Performance Report 1.4.D Supplier Warranty 1.6.B Chiller Performance Data 1.6.B Fan Performance 1.6.B Refrigerant 1.6.B Wiring Diagrams and Points Lists 1.6.B Certified and Guaranteed Sound/Noise Data Report
2 1.6.C O&M Manuals 3 1.6.D Run test report for Chillers 4 1.6.E AHRI Product Certificate 5 1.6.F Seismic Restraint Provisions and Calculations
1.4.B Shop Drawings 1.4.B AHU Performance Data (Fans, Coils, Filters, etc) 1.4.B Sound Power Levels 1.4.B Fan Curves 1.4.B Static Pressure Profiles
2 1.4.C O&M Manuals 3 1.4.D Written Test Procedures 4 1.4.E Shipping Information
1.4.B Ductless Split Systems 1.4.B Dimensions and Required Clearances, Weights, Start-up
Instructions 1.4.B Electrical Requirements and Wiring Diagrams 1.4.B Roof Curbs/Mounting 1.4.C ARI Certification 1.4.D Equipment Performance Ratings (EER, COP)
2 1.4.F Systems Readiness Report 3 1.4.E O&M Manuals
1.4.B Unit Heaters 1.4.B Fan Coil Units 1.4.B Radiant Panels 1.4.C Performance Certificates
2 1.4.D O&M Manuals 3 1.4.E Systems Readiness Report
123 82 00
23 81 00
23 73 00
23 64 00
23 40 00
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
2.1 Conductors and Cables
2.2 Splices
2.3 Connectors and Terminations
2.1 Grounding and Bonding Conductors
2.4 Ground Connections
2.5 Equipment Rack and Cabinet Ground Bars
2.6 Ground Terminal Blocks
2.7 Grounding Bus
2.1 Conduit
2.1 Conduit Fittings
2.1 Conduit Supports
2.1 Outlet, Junction, and Pull Boxes
3.1 Firestopping Materials
1.7 Short-Circuit Analysis
1.7 Protective Device Coordination Study
1.7 Arc Flash Study
1.8 OCPD Settings
2.3 Outdoor Photoelectric Switches
2.7 Indoor Occupancy Sensors
2.11 Lighting Control System – Relay Panel Type (Stand
Alone)
2.1 General Requirments
2.2 Compartments
2.3 BIL Rating
2.4 Transformer Fuse Assembly
2.5 Primary Connections
2.6 Medium Voltage Switch
2.7 Medium Voltage Terminations
2.8 Low Voltage Equipment
2.9 Transformers
242200 1 2.1 Transformers
2.1 Panelboards
2.3 Molded Case Circuit Breakers for Panelboards
2.4 Surge Protective Devices
2.1 Receptacles
2.2 Toggle Switches
2.3 Manual Dimming Controls
2.4 Wall Plates
2.5 Surface Multiple-Outlet Assemblies
262726
262416
260923
261219
260573
DIVISION 26
260533
260526
260519
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
2.1 Motor Controllers
2.2 Manual Motor Controllers
2.3 Magnetic Motor Controllers
2.4 Reduced Voltage Motor Controllers
2.6 Low-Voltage Variable Speed Motor Controllers (VSMC)
2.1 Fused Switches Rated 600 Amperes and Less
2.2 Unfused Switches Rated 600 Amperes and Less
2.4 Motor Rated Toggle Switches
2.5 Cartridge Fuses
2.6 Separately Enclosed Circuit Breaker
264100 1 2.1 General Requirements 264313 1 2.1 Switchboard TVSS
2.1 Lighting Fixtures
2.2 Ballasts
2.5 Lamps
2.9 LED Exit Light Fixtures
2.10 LED Light Fixtures
1 2.1 Control Wiring 2 2.2 Communication and Signal Wiring
2.1 Equipment and Materials
2.2 Equipment Items
2.3 Environmental Requirements
2.4 Installation Kit
2.1 Equipment and Materials
2.2 Distribution Equipment and Systems
2.5 Installation Kit
271500
271100
271000
265100
262921
262911 1
DIVISION 27
MASTER SUBMITTAL LIST
VA #
Section Group Article Description
2.1 Equipment and Materials
2.3 Fiber Optic Equipment
2.4 Transient Voltage Surge Suppression devices (TVSS) and
surge suppresion
2.5 Installation Kit
2.1 General
2.2 Backboards
2.3 UTP
2.4 UTP Cable Hardware
2.7 Coaxial Cable
2.8 Coxial Cable Hardware
2.9 RS-232 Cable
2.10 RS-485 Cable
2.11 Low-Voltage Control Cable
2.12 Control-Curcuit Conductors
2.13 Fire Alarm Wire and Cable
2.14 Identification Products
2.15 Source Quality Control
2.17 Fireproofing Tape
2.1 General
2.2 Cameras
2.6 Video Cameras
2.8 Power Supplies
2.12 Wires and Cables
2.1 Equipment and Materials, General
2.2 Conduit, Boxes, and Wire
2.3 Fire Alarm Control Unit
2.6 Alarm Notification Appliances
2.7 Alarm Initiating Devices
2.8 Supervisory Devices
2.9 Address Reporting Interface Device
2.10 Smoke Barrier Door Control
2.12 Utility Locks and Keys
2.13 Spare and Replacement Parts
2.14 Instruction Chart
282300
283100
280513
280500
DIVISION 28
VA #
SECTION 01 41 00
AIR BARRIER SYSTEM
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. This section includes administrative and procedural requirements for accomplishing an airtight building enclosure that controls infiltration or exfiltration of air.
1. The airtight components of the building enclosure and the joints, junctures and transitions between materials, products, and assemblies forming the air-tightness of the building enclosure are called “the air barrier system”.
Services include coordination between the trades, the proper scheduling and sequencing of the work, preconstruction meetings, inspections, tests, and related actions, including reports performed by Contractor, by independent agencies, and by governing authorities. They do not include contract enforcement activities performed by Architect.
2…