621-18-111_Bldg 8 3rd Flr Gen Cond Photos 10-25-21.pdf

PDF 8 MB Posted

Attached to
Z1DA--36C249-21-AP-3705- 621-18-111 - Renovate Bldg. 8 Enviro & Cond. Def. Phase II
Solicitation number
36C24921B0012
Issued by

About this file

This document contains photos and details regarding a federal contract opportunity for renovation work at Building 8 of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The opportunity involves renovating the third floor of Building 8, Phase 2, including unfinished walls, windowsills, IT closets, doors, HVAC ducts, bathrooms, and stored materials. The estimated value is between $500,000 and $1,000,000. The solicitation will be issued on August 23, 2021 pursuant to FAR Part 14 and closed on September 23, 2021. This is a 100% set aside for verified Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 for Commercial and Institutional Building Construction up to $39.5 million. Questions must be submitted in writing to the Contracting Officer by the specified date to be considered.

View the file

Other files

Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing Typical Unfinished Metal Stud Wall Framing.

(Bldg. 8 3rd Floor)

LEFT:

UNFINISHED

EAST WALL

CORRIDOR 349.

RIGHT:

UNFINISHED

WEST WALL

WAITING 343

ENTERING

CORRIDOR 301.

Project 621-18-111 Renovation Bldg. 8 Phase 2 (Solicitation 36C24921B0012)

LEFT:

UNFINISHED

WALL &

OPENNNING

CORRIDOR 301

ENTERING

WAITING 343.

RIGHT:

UNFINISHED

WALL &

OPENNING

WAITING 320

ENTERING

CORRIDOR 301.

LEFT: UNFISHED

WALL &

OPENNING

CORRIDOR 301

ENTERING

WAITING 320.

Existing room finishes and typical window.

(Bldg. 8 3rd

Floor)

RIGHT &

LEFT: TYPICAL

UNFINSHED

WINDOWSILL

AND TRIM.

Existing Typical Unfinished WINDOWSILLS, TRIM AND WALL FINISHES. (Bldg. 8 3rd Floor)

Existing unfinished IT Closet & GFCI IT Items (Bldg. 8 3rd Floor)

Bldg. 8 Existing Door Type E, wood door/window trim and base for reference.

Field Verify dimensions and match face profiles.

Typical Existing HVAC Supply and Return Duct conditions at each register/diffuser. (Bldg. 8 3rd Floor)

Unfished Break Room & Janitor’s Closet (Bldg. 8 3rd Floor) (All stored items will be removed form site prior to Award.)

LEFT: BREAK ROOM

UNFINISHED NORTH WALL.

RIGHT: JANITOR’S CLOSET

UNFINISHED EAST AND

PARTIAL SOUTH WALL.

Existing Typical Unfinished Womens Bathroom. (Bldg. 8 3rd Floor)

LEFT: SINK LOCATION WITH ROUGHINS COMPLETE.

ABOVE: TOILETS INSTALLED.

RIGHT: CONDITION PHOTO FACING EAST.

Existing Typical Unfinished MEN’S BATHROOM

LEFT: TOILETS INSTALLED.

RIGHT: SINK LOCATION AND ROUGHIN

COMPLETE.

MISC. STORED MATERIALS FOR BLDG. 8

MISC. STORED MATERIALS FOR BLDG. 8

Bldg. 8 Room 322 west wall existing condition.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Existing unfinished IT Closet & GFCI IT Items (Bldg. 8 3rd Floor)
Bldg. 8 Existing Door Type E, wood door/window trim and base for reference. Field Verify dimensions and match face profiles.
Typical Existing HVAC Supply and Return Duct conditions at each register/diffuser. (Bldg. 8 3rd Floor)
Unfished Break Room & Janitor’s Closet (Bldg. 8 3rd Floor) �(All stored items will be removed form site prior to Award.)
Slide Number 9
Slide Number 10
MISC. STORED MATERIALS FOR BLDG. 8
MISC. STORED MATERIALS FOR BLDG. 8
Bldg. 8 Room 322 west wall existing condition.