This document contains questions and answers related to a solicitation for the renovation of a whole health clinic at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The solicitation seeks bids for furnishing all labor, materials, equipment and supervision to prepare the site and complete renovations as required by the drawings and specifications. Key details include asbestos abatement being required for approximately 1,400 square feet of floor tile and mastic and 200 linear feet of pipe insulation in Building 2. Bids are due by November 9, 2020 at 10:00 AM Central Time. The tentative award date is the second week of December with work expected to begin no earlier than January 5, 2021. Clarification was provided that the superintendent may act as both safety and health officer and quality control manager.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 6
0002 10-20-2020
626-21-1-4209-0001
626A4-18-107
90C
Department of Veterans Affairs
Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400
Murfreesboro TN 37129
90C
Network Contracting Office 9
Department of Veterans Affairs
Network Contracting Office (90C)
1639 Medical Center Parkway Suite 400
Murfreesboro TN 37129
To all Offerors/Bidders
36C24921B0001
10-09-2020
X
X X
626-3610162-4209-854200-3220-23NRNR000
This amendment is issued to answer Request for Information (RFI) and to post the Site Visit Sign in Sheet.
Bid Due Date of 11/9/2020 @ 10 AM CT remains the same.
Teresa A. Rogofsky
Contracting Officer
36C24921B0001
RENOVATE FOR WHOLE HEALTH CLINIC
COMBINED RFI’S
QUESTION
The specifications include sections for Traditional Asbestos Abatement, Asbestos Floor Tile and
Mastic Abatement, and Lead-Based Paint Removal and Disposal. There are no areas or quantities for these materials listed. The demolition drawings of the plans do not provide any information on hazardous materials either. Is the age of the building such, that encountering hazmat during the demolition phase will not be an issue, or will a Phase 1 Environmental Report be provided prior to the bid date?
ANSWER
Please see attached Asbestos survey below – Building 2 is the only space where asbestos is expected. Please use 1400 sf for floor tile/Mastic; allow 200 LF for Pipe insulation and 400 square feet of duct insulation. No lead paint is indicated.
In the SECURITY section of the solicitation (page 9 of 59), a requirement is listed for SAC and
NACI background checks. Can you please verify that the SAC should be expected for all on-site workers? Also, can you confirm that the NACI should only be required of workers directly involved with Communications and Electronic Safety and Security work (Div. 27 and 28)?
ANSWER
Each level of security has different requirements – for the most part workers (subs) will fall into the first category (see below). For contractor employees the second scenario is most likely. The only instance in this project where the 3rd category will come into play will be during tie in of the
HVAC systems into the VA Head in – (both Alerton and Siemens are already vetted.
From Solicitation:
Levels and associated types of Background Investigations:
• If the project requires that workers have only limited physical access to the VA facility for a period of one year or less, a local flash badge with fingerprint check is issued.
• If the project requires that workers require un-supervised, logical and/or physical access for 180 consecutive or aggregate days in a 365-day period, over a 3 year period, a background investigation may be required (Special Agency Check (SAC)) which must be completed prior to being allowed access.
• If the project requires that workers have access to a VA Network (such as the Building
Management System) or un-supervised, full-time, logical, and/or restricted physical access for more than 6 months or more than 180 aggregate days in a one-year period, a background investigation is required (Special Agency Check and National Agency Check with Written Inquiries (NACI)) and access is not allowed until a favorable SAC completion.
Section 01 00 00 -9 of the Specs state that a construction Fence is to be 7 feet tall. Will a 7-feet or an 8-feet construction fence be acceptable?
ANSWER
Yes
Will the different areas of renovation be accessible all at one time or is there a specific phasing plan that the VA would like work accomplished?
ANSWER
Work in Building 1 floor 4 should be completed prior to work beginning in Building 2 to allow for the move of the Sim Lab.
Can the contractor use elevators in the building? If so, which one(s) and during what hours can elevator(s) be used?
ANSWER
Yes – Elevators in Building 1 can be used to access the 4th floor between the hours of 1630 and
0600 for material delivery. Men with hand tools may use the elevators at any time. Covid protocols of social distancing and masks are required. Please be courteous.
The Spec Table of Contents does not show a spec section for 23 21 23, however, this spec section is included in specifications. Is Section 23 21 23 supposed to be part of this project?
For planning and scheduling purposes, can you provide the expected date of award?
ANSWER
Tentative award is the second week in December. Work will not begin until on or after January
5th, 2021.
Can you please provide the drawings in Revit (preferably) or CAD (less preferred) for coordination purposes?
CAD files are available for coordination drawings to the winning bidder.
Keynote 09.90 on A01.04 states that there are ceiling mounted patient lifts required. Are they
OFOI or CFCI?
ANSWER
Ceiling mounted patient lifts are purchased and installed by the VA and a separate vendor –
Winning bidder will work with the VA to coordinate the install.
Will the ceiling mounted lift shown in drawing #A11.04 in room B1-405 be available for bid in this project?
This equipment is VA provided and VA installed.
The plans include details on masonry infill (A 08.02) and casework (A 10.01-02). Will specifications be provided for these scopes of work?
Section 01 35 26, 1.7, C states the SSHO has to be a separate qualified individual from the Prime
Contractor’s Superintendent and/or Quality Control Manager with Duties only as SSHO. Section
01 45 00, 3.4, B. states the QC System Manager is to be assigned no other duties. This means the
Prime Contractor will have three full time personnel on the jobsite at all times. This will triple the
General Conditions costs. Can the Superintendent act as the SSHO and QC Manager like most other projects?
Yes – the VA will allow it for this project.
Section 01 45 00, 3.4, D. requires the CQC System Manager to have completed the Construction
Quality Management for Construction Course offered by the Naval Facilities Engineering
Command and Army Corps of Engineers. Is this required for this project?
No
Section 02 82 11 and 02 82 13.19 are for Asbestos Abatement. The quantities in 1.1.2 Extent of
Work are blank. We could not find any notation for existing asbestos in the plans. Is there asbestos abatement on this project? If there is and the quantity is unknown, can you put a quantity to bid and a unit rate for everything over that quantity in the bid schedule? This way everybody is bidding the same quantities.
ANSWER
Please see attached Asbestos survey below – Building 2 is the only space where asbestos is expected. Please use 1400 sf for floor tile/Mastic and allow 200 LF for Pipe insulation and 400 sf of duct insulation.
See attached document: Site Visit Sign In Sheet.