36C24918R0366-0001002.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Project 603-17-801, Site Preparation for Steris Harmony EMS Anesthesia Booms
Solicitation number
36C24918R0366
Issued by

About this file

36C24918R0366 0001 S02-Solicitation Attachment-Price Schedule (Project 603-17-801)-Robley Rex VAMC.xlsx

View the file

Other files

File Type Posted
36C24918C0182-000.docx DOCX document
36C24918R0366-0005000.docx DOCX document
36C24918R0366-0004000.docx DOCX document
36C24918R0366-0004002.pdf PDF
36C24918R0366-0004001.pdf PDF
36C24918R0366-0003000.docx DOCX document
36C24918R0366-0003001.pdf PDF
36C24918R0366-0002002.docx DOCX document
36C24918R0366-0001001.pdf PDF
36C24918R0366-0001000.docx DOCX document
36C24918R0366-0001003.pdf PDF
36C24918R0366-0001004.pdf PDF
36C24918R0366-005.pdf PDF
36C24918R0366-000.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00$0.00$0.00$0.00$0.00
14 21 20$0.00$0.00$0.00$0.00
14 21 30$0.00$0.00$0.00$0.00
14 21 90$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

Overhead0%$0
Profit$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky.

A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).

For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.

B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.

C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER

Deduct Alternate 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00$0.00$0.00$0.00$0.00
14 21 20$0.00$0.00$0.00$0.00
14 21 30$0.00$0.00$0.00$0.00
14 21 90$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

Overhead0%$0
Profit$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky.

A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).

For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.

B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.

C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER

Deduct Alternate 2

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00$0.00$0.00$0.00$0.00
14 21 20$0.00$0.00$0.00$0.00
14 21 30$0.00$0.00$0.00$0.00
14 21 90$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

Overhead0%$0
Profit$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky.

A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).

For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.

B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.

C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER

File details come from the government source that posted it.