36C24918R0366-0001002.xlsx
XLSX spreadsheet 37 KB Posted
- Solicitation number
- 36C24918R0366
About this file
36C24918R0366 0001 S02-Solicitation Attachment-Price Schedule (Project 603-17-801)-Robley Rex VAMC.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24918C0182-000.docx | DOCX document | |
| 36C24918R0366-0005000.docx | DOCX document | |
| 36C24918R0366-0004000.docx | DOCX document | |
| 36C24918R0366-0004002.pdf | ||
| 36C24918R0366-0004001.pdf | ||
| 36C24918R0366-0003000.docx | DOCX document | |
| 36C24918R0366-0003001.pdf | ||
| 36C24918R0366-0002002.docx | DOCX document | |
| 36C24918R0366-0001001.pdf | ||
| 36C24918R0366-0001000.docx | DOCX document | |
| 36C24918R0366-0001003.pdf | ||
| 36C24918R0366-0001004.pdf | ||
| 36C24918R0366-005.pdf | ||
| 36C24918R0366-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer-Breakdown
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $100.00 | ||||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | $78.00 | |
| 10 26 00 | Wall and Door Protection | $5.00 | $9.00 | 8.00 | $22.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 20 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 30 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 90 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $75.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $75.00 | $0.00 | $0.00 | $75.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $87.00
TOTAL MATERIALS $14.00
TAX FOR MATERIALS 6% $0.84
| TOTAL EQUIPMENT | $74.00 | |
| $175.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $175 |
| TAX FOR MATERIALS | $1 |
SUBTOTAL $176
| Overhead | 0% | $0 |
| Profit | $0 |
SUBTOTAL $176
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $176
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky. |
A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).
For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.
B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.
C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER
Deduct Alternate 1
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $100.00 | ||||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | $78.00 | |
| 10 26 00 | Wall and Door Protection | $5.00 | $9.00 | 8.00 | $22.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 20 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 30 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 90 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $75.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $75.00 | $0.00 | $0.00 | $75.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $87.00
TOTAL MATERIALS $14.00
TAX FOR MATERIALS 6% $0.84
| TOTAL EQUIPMENT | $74.00 | |
| $175.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $175 |
| TAX FOR MATERIALS | $1 |
SUBTOTAL $176
| Overhead | 0% | $0 |
| Profit | $0 |
SUBTOTAL $176
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $176
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky. |
A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).
For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.
B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.
C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER
Deduct Alternate 2
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $100.00 | ||||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | $78.00 | |
| 10 26 00 | Wall and Door Protection | $5.00 | $9.00 | 8.00 | $22.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 20 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 30 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 90 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $75.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $75.00 | $0.00 | $0.00 | $75.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $87.00
TOTAL MATERIALS $14.00
TAX FOR MATERIALS 6% $0.84
| TOTAL EQUIPMENT | $74.00 | |
| $175.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $175 |
| TAX FOR MATERIALS | $1 |
SUBTOTAL $176
| Overhead | 0% | $0 |
| Profit | $0 |
SUBTOTAL $176
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $176
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| SCOPE OF WORK: This project will prepare the six (6) operating rooms, medical gas systems, electrical system and other affected utility systems at the Robley Rex VAMC to receive Steris Harmony EMS Anesthesia Booms. The installation of two (2) Steris Harmony EMS Anesthesia Booms in each of the following Operating Rooms (OR): OR 1 (C-408), OR 2 (C-406), OR 3 (C-404), OR 4 (C-402), OR 5 (B-414), OR 6 (B-406). These operating rooms are located on the 4th floor of Building 1 located at 800 Zorn Avenue, Louisville, Kentucky. |
A. ITEM 1: GENERAL CONSTRUCTION: Work includes all labor, material, equipment, and supervision to perform selective demolition, electrical, mechanical, general construction and alterations, including new roof curbs, partitions, ceiling system, finish systems, structural supports and the coordination with and provision of infrastructure required to support the installation of VAMC furnished medical equipment – for Anesthesia Supply Heads (in each O.R. in this Statement of Work (SOW) and Video Monitoring system with new Light and Equipment Booms for O.R.s #1 and #4 (only).
For Anesthesia Supply Heads the SOW also includes the provision of a temporary roof mounted exhaust fan and temporary duct for provision of negative air pressurization of Phased Work Areas. Also, the provision of a temporary wall mounted exhaust fan (at existing window location) for provision of negative air pressurization of O.R. #6, Phased Work Area #2. (Refer to Deductive Alternate #1). The removal of temporary exhaust fans, the repair of disturbed roofing surfaces, and the reinstallation of exterior window (at wall mounted fan) shall occur upon completion of associated Phased work.
B. DEDUCT ALTERNATE NO.1: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE RENOVATION OF O.R. #6 (ROOM B-406), Phase #2 of project.
C. DEDUCT ALTERNATE NO. 2: DEDUCT FROM BASE-BID AMOUNT ALL WORK ASSOCIATED WITH THE PROVISION AND INSTALLATION OF NEW LED GENERAL LIGHTING FIXTURES SHOWN FOR O.R. #1 (ROOM C-408), O.R. #2 (ROOM C-496), O.R. #3 (ROOM C- 404), O.R. #4 (ROOM C-402) O.R. #5 (ROOM B-417), AND SPECIAL G.U. (ROOM B-425).
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Project 603-17-801 OR Site Preparation for Steris EMS Anesthesia Supply Boom &"-,Bold"ROBLEY REX VA MEDICAL CENTER
File details come from the government source that posted it.