36C24918B0361-015.pdf
PDF 72 KB Posted
- Solicitation number
- 36C24918B0361
About this file
36C24918B0361 Section 04 01 40 Restoration in Historic Structures.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24918C0185-000.docx | DOCX document | |
| 36C24918B0361-0002000.docx | DOCX document | |
| 36C24918B0361-0001000.docx | DOCX document | |
| 36C24918B0361-022.pdf | ||
| 36C24918B0361-017.pdf | ||
| 36C24918B0361-003.pdf | ||
| 36C24918B0361-008.pdf | ||
| 36C24918B0361-005.pdf | ||
| 36C24918B0361-011.pdf | ||
| 36C24918B0361-010.pdf | ||
| 36C24918B0361-014.pdf | ||
| 36C24918B0361-009.pdf | ||
| 36C24918B0361-021.pdf | ||
| 36C24918B0361-001.docx | DOCX document | |
| 36C24918B0361-018.pdf | ||
| 36C24918B0361-026.pdf | ||
| 36C24918B0361-007.pdf | ||
| 36C24918B0361-023.pdf | ||
| 36C24918B0361-020.pdf | ||
| 36C24918B0361-006.pdf | ||
| 36C24918B0361-012.pdf | ||
| 36C24918B0361-004.pdf | ||
| 36C24918B0361-019.pdf | ||
| 36C24918B0361-025.pdf | ||
| 36C24918B0361-013.pdf | ||
| 36C24918B0361-016.pdf | ||
| 36C24918B0361-024.pdf | ||
| 36C24918B0361-002.pdf | ||
| 36C24918B0361-000.docx | DOCX document |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04 01 40 -1
SECTION 04 01 40
RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
A. ACI INTERNATIONAL (ACI)
B. ACI C-20 (1992) Repair and Rehabilitation II
C. AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
D. ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and
Biological Exposure Indices
E. ASTM INTERNATIONAL (ASTM)
F. ASTM C 1515 (2001) Standard Guide for Cleaning of Exterior Dimension
Stone, Vertical and Horizontal Surfaces, New or Existing
G. BRICK INDUSTRY ASSOCIATION (BIA)BIA Tech Note 20 (1990; R 2000)
Cleaning Brick Masonry
1.2 SUBMITTALS
A. The following shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES:
1. Product Data
2. Sample Area of Cleaning
3. Cleaning and Restoration Methods
B. Descriptive narrative in cleaning and repair methods to be employed in the work. Description shall be organized in sequence from preparation through completion of the work. Schedule showing estimated time, in calendar days, for completion of each phase of the work shall be included.
C. Qualifications
Documentation showing Contractor's experience of 5 consecutive years in masonry restoration, plus a list of similar jobs to the one specified herein.
1.3 GENERAL REQUIREMENTS
Work shall be done in conformance with ACI C-20. Non-historic masonry work, including materials, procedures, and requirements shall conform to
Section 04 20 00 MASONRY, except as otherwise specified herein.
A. Cleaning and Restoration Methods
The cleaning and restoration methods, and materials selected for a specific structure, shall be submitted for approval before work starts, and shall take into account the total construction system of the building to be worked upon, including different masonry and mortar materials, as well as non-masonry elements which may be affected by the work.
1.4 QUALIFICATIONS
The Contractor shall provide qualified workers, trained and experienced in restoration of masonry in historic structures, and shall furnish documentation of 5 consecutive years of work of this type. A list of
04 01 40 -2 similar jobs shall be provided identifying when, where, and for whom the work was done.
1.5 EQUIPMENT AND TECHNIQUES DEMONSTRATION
Equipment and techniques of operation shall be demonstrated in an approved location and shall be subject to approval. Dependable and sufficient equipment, appropriate and adequate to accomplish the work specified, shall be assembled at the work site in sufficient lead time before the start of the work to permit inspection, calibration of weighing and measuring devices, adjustment of parts, and the making of any repairs that may be required. The equipment shall be maintained in good working condition throughout the project.
A. Cleaning Equipment
Cleaning equipment shall not cause staining, erosion, marring, or other damage or changes in the appearance of the surfaces to be cleaned.
1. Water Blasting
Water blasting equipment shall include a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water re-supply equipment. The equipment shall not be operated at a pressure which will cause etching or other damage to the masonry surface or mortar joints. The equipment shall be operated at a discharge capacity of 55 to 500 psi and 2.5 to 3 gpm for general surface cleaning operations. The water tank and auxiliary re-supply equipment shall be of sufficient capacity to permit continuous operations. The Contractor shall provide protective covers and barriers as required to prevent over-spray onto adjacent surfaces.
B. Drilling Equipment
Equipment used to drill holes in masonry, for patch anchors and other applications, shall be standard handheld masonry drills, commonly used for drilling small holes in concrete and masonry. The drill shall be a small, powered, handheld type, using rotary drilling mode only. Impact and rotary impact type drills will not be allowed.
C. Finishing and Texturing Equipment
Equipment and hand tools used for placing, finishing and texturing masonry and mortar shall be commercially available and commonly used in masonry construction and repair. Surface grinders, impact tools, and other equipment shall conform to the specified requirements, except as specifically required by the type of finish and texture.
D. Compressed Air Supplies
Compressed air equipment shall deliver clean, oil and moisture free compressed air at the surface to be cleaned. The compressed air line shall have at least two in-line air filters to remove oil and moisture from the air supply. The compressed air supply shall be tested during each shift for the presence of oil and moisture.
E. Material Handling and Associated Equipment
1. Mixing, Transporting, and Placing Job Materials
Equipment used for mixing, transporting, placing, and confining masonry and mortar placements shall be capable of satisfactorily mixing material and supporting placement operations in an
04 01 40 -3 uninterrupted manner. Defects and deficiencies in operation or capacity shall be resolved prior to use in the work. Equipment used for mixing, conveying, and placing of materials shall be clean, free of old materials and contaminants, and shall conform to the material manufacturer's recommendations.
2. Associated Equipment
Associated equipment such as mixer timing equipment, valves, pressure gauges, pressure hoses, other hardware, and tools shall be provided as required to ensure a continuous supply of material and operation control.
1.6 SAMPLE AREA OF CLEANING
Sample areas of each procedure proposed for use in the work shall be submitted for approval. No masonry or mortar shall be used in the work until the samples and the represented mixture have been approved.
1.7 SAFETY AND HEALTH
Work shall comply with applicable federal, state, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity
Hazard Analysis, specified in the CONTRACT CLAUSES. The Activity Hazard
Analysis shall include analyses of the potential impact of cleaning operations on personnel and on others involved in and adjacent to the work zone.
1.8 WORKER EXPOSURES
Exposure of workers to chemical substances shall not exceed the limits established by ACGIH 0100Doc, or those required by a more stringent applicable regulation.
1.9 TRAINING
Workers having access to an affected work area shall be informed of the contents of the applicable material safety data sheets, of potential health and safety hazard, and of protective controls associated with materials used on the project. An affected work area is one which may receive dust, mists, and odors from the surface preparation operations.
Workers involved in masonry cleaning shall be trained in the safe handling and application, and the exposure limit, of each material to be used in the project. Personnel having a need to use respirators and masks shall be instructed in the use and maintenance of such equipment.
1.10 COORDNATION
Work shall be coordinated to minimize exposure of building occupants, other Contractor personnel, and visitors to mists and odors from surface preparation, cleaning, and repair operations.
1.11 PROTECTION
A. Persons, motor vehicles, adjacent surfaces, surrounding buildings, equipment, and landscape materials shall be protected from chemicals used and runoff from cleaning and paint removal operations. Temporary protection covers, which shall remain in operation during the course of the work, shall be erected over pedestrian walkways and at personnel and vehicular points of entrance and exit.
B. The interior of buildings shall be protected from the weather, cleaning, and repair operations at all times.
04 01 40 -4
1.12 WEATHER LIMITATIONS
Masonry, mortar, and epoxy adhesives shall not be placed when weather conditions detrimentally affect the quality of the finished product. No masonry or mortar shall be placed when the air temperature is below 40 degrees F in the shade. When air temperature is likely to exceed 90 degrees F masonry and mortar shall have a temperature not exceeding 90 degrees F when deposited. Materials to be used in the work shall be neither produced nor placed during periods of rain or other precipitation.
Material placements shall be stopped, and all in-place material shall be protected from exposure, during periods of rain or other precipitation.
1.13 WARRANTIES
A. Cleaning Warranty
Cleaning procedures shall be warranted for a period of two years against harm to substrate (masonry and mortar) or to adjacent materials including, but not limited to, discoloration of substrate from improper procedures or usage, chemical damage from inadequate rinse procedures, and abrasive damage from improper procedures.
PART 2 PRODUCTS
2.1 Cleaning Implements
Brushes shall have natural or nylon fiber bristles only. Wire brushes shall not be used. Scrapers and application paddles shall be made of wood with rounded edges. Metallic tools shall not be used.
2.3 Water
Potable water shall be obtained from a local source and shall be filtered to remove minerals resulting in a neutral pH, prior to application.
Backflow prevention devices shall be provided at the point of connection to the water supply.
PART 3 EXECUTION
3.1 EVALUATION AND ANALYSIS
Evaluation and analysis shall conform to the requirements specified herein. Masonry renovation shall be undertaken only after complete evaluation and analysis of the areas to be repaired are completed; this shall include sampling and testing of the existing mortar to determine its composition and qualities. No repair work shall be undertaken until conditions that have caused masonry deterioration have been identified;
such conditions shall be corrected, if possible, prior to start of the work.
3.2 MASONRY CLEANING
Historic materials shall not be damaged or marred in the process of cleaning. Cleaning shall conform to ASTM C 1515 and BIA Tech Note 20. Open joints shall be temporarily caulked or otherwise protected to prevent water and cleaner intrusion into the interior of the structure from pressure spraying. Non-masonry materials and severely deteriorated masonry shall be protected by approved methods prior to initiation of cleaning operations. Masonry cleaning shall remove all organic and inorganic contaminants from the surface and pores of the substrate, returning the masonry to its natural color. Surfaces shall be evenly cleaned with no evidence of streaking or bleaching. The cleaning process shall not affect the density, porosity, or color of the masonry or mortar. Cleaned masonry
04 01 40 -5 shall have a neutral pH. Methods used for cleaning historic masonry shall be the gentlest possible to achieve the desired results. Test patches shall be made to determine a satisfactory cleaning result. Cleaning shall proceed in an orderly manner, working from top to bottom of each scaffold width and from one end of each elevation to the other. Cleaning shall be performed in a manner which results in uniform coverage of all surfaces, including corners, moldings, interstices and which produces an even effect without streaking or damage to masonry. The cleaning materials, equipment, and methods shall not result in staining, erosion, marring, or other damage to the surfaces of the structure. Following an initial inspection and evaluation of the structure and surfaces, the structure shall be given a surface cleaning. The surface cleaning shall be completed prior to start of repair work, and sampling and testing of mortars. The cleaning shall provide for the complete cleaning of all exterior masonry surfaces of the structures, removing all traces of moss, dirt, and other contaminants. The cleaning shall provide a clean masonry surface to allow determination of the masonry's color and shades, finish and texture, and other properties.
Following completion of the surface cleaning of the structure (or side of structure) the masonry shall be dried prior to the start of any repair work. The following sequence of methods shall be used to determine the least aggressive, effective cleaning method:
1. Water with brushes
2. Water with mild soap
3. Water with stronger soap
4. Water with stronger soap plus ammonia
5. Water with stronger soap plus vinegar (but not on calcareous masonry)
6. Stronger chemical cleaners, only when above methods are determined to be ineffective by the Contracting Officer.
A. Project Conditions
Masonry surfaces shall be cleaned only when air temperatures are above
40 degrees F and will remain so until masonry has dried out, but for not less than 7 days after completion of the work.
B. Test Patches
The materials, equipment, and methods to be used in cleaning shall be demonstrated in a test section approximately 3 by 3 ft square. The location of the test section, and the completed test section shall be subject to approval. The cleaning process shall be adjusted as required and the test section rerun until an acceptable process is obtained.
Test patches shall be located in inconspicuous areas of the building.
The areas tested shall exhibit soiling characteristics representative of those larger areas to be cleaned. Tests shall also be conducted on areas to be stripped of paint. Tested areas shall be allowed to dry before a determination is made on the effectiveness of a particular treatment.
C. Water Cleaning
1. Pressure Spraying
Water shall be spray applied to masonry surfaces to comply with requirements indicated by test patches for location, purpose, water temperature, pressure, volume, and equipment. Unless otherwise indicated, the surface washing shall be done with clean, low pressure water (pressure of less than 55 psi and 2.5 to 3 gpm discharge) and the spray nozzle shall not be held less than 12
04 01 40 -6 inches from surface of masonry. Water shall be applied side to side in overlapping bands to produce uniform coverage.
2. Handscrubbing
Pre-wetted surfaces shall be scrubbed using hand-held natural bristle or nylon brushes. Wire brushes shall not be used. Surfaces to be cleaned shall be scrubbed to remove surface contaminants.
3. Rinsing
Scrubbed surfaces shall be rinsed clean of all contaminants and cleaning solutions with water in a low-to-moderate pressure spray, working upwards from bottom to top of each treated area. The rinsing cycle shall remove all traces of contaminants and cleaning solutions.
D. Health and Safety Precautions
Full-face shields shall be provided for mixing, blending, and placing operations as required. Protective coveralls and neoprene-coated gloves shall be provided for workers engaged in the operations. Protective creams of a suitable nature for the operation shall be supplied.
Adequate fire protection shall be maintained at mixing and placing operations. Smoking or the use of spark- or flame-producing devices shall be prohibited within 50 feet of mixing and placing operations.
The mixing, placing, or storage of epoxy-resin grout or solvent shall be prohibited within 50 feet of any vehicle, equipment, aircraft, or machinery that could be damaged from fire or could ignite vapors from the material.
3.3 FINAL CLEANING
No sooner than 72 hours after completion of the repair work and after joints are sealed, faces and other exposed surfaces of masonry shall be washed down with water, then rinsed with clean water. Discolorations which cannot be removed by these procedures, shall be considered defective work.
Cleaning work shall be done when temperature and humidity conditions allow the surfaces to dry rapidly. Adjacent surfaces shall be protected from damage during cleaning operations.
3.4 PROTECTION OF WORK
Work shall be protected against damage from subsequent operations.
3.5 DEFECTIVE WORK
Defective work shall be repaired or replaced, as directed, using approved procedures.
3.6 FINAL INSPECTION
Following completion of the work, the structure shall be inspected for damage, staining, and other distresses. The patches shall be inspected for cracking, crazing, delamination, unsoundness, staining and other defects.
The finish, texture, color and shade, and surface tolerances of the patches shall be inspected to verify that all requirements have been met.
Surfaces exhibiting defects shall be repaired as directed.
-- End of Section --
File details come from the government source that posted it.