This is a Performance Work Statement for boiler maintenance and testing services at the San Juan VA Caribbean Healthcare System (VACHS) in Puerto Rico.
The contractor must perform comprehensive maintenance, inspection, and testing on three fire-tube steam boilers (manufactured by Hurst Boiler & Welding Co. and York-Shipley) and ancillary equipment, restoring them to service per manufacturer manuals and in compliance with ASME, National Board of Pressure Vessels, VHA Directive 1810, OSHA, and VHA Boiler Plant Safety Devices Testing Manual standards. The base contract period is twelve months from award, with four optional twelve-month renewal periods exercisable at the government's discretion. The contractor must supply all labor, materials, and equipment, and provide detailed written reports with findings, recommendations, calculations for maximum allowable working pressure and remaining life expectancy, photographs, and expert judgment on repair needs and cost-effectiveness.
Contractor qualifications must include minimum five years of experience in steam boiler maintenance and repair, at least one certified oil burner technician on staff, and technicians with one-year trade school training plus five years institutional and industrial boiler plant experience. Non-destructive testing personnel must hold ASNT Level II certification. Personnel must demonstrate familiarity with ASME Boiler and Pressure Vessel Code, ASME B31.1, ANSI/NB-23, NACE International Standard RP0590, and NFPA 85. Work must be scheduled with two weeks' advance notice to the Program Manager/Contracting Officer's Representative, only one boiler may be out of service at a time, and work cannot occur during heavy steam load periods. Specific requirements include combustion control checks, pressure limit shutdowns, fire-side cleaning, tube inspection using fiber optics, water-side cleaning with internal mechanism inspection, and comprehensive safety device testing covering low-water cutoffs, pressure controls, flame scanners, fuel safety shutoffs, and timing interlocks. Non-destructive testing must include ultrasonic thickness measurements, magnetic particle testing where defects are found, and metallurgical analysis if overheating is suspected. Government points of contact are Erick Alvelo, Carlos R. Ruiz Rosado, and Francisco Rivera Mujica.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24827Q0061_2.docx | DOCX document | |
| REVISED PRICE COST SCHEDULE- Boilers.pdf | ||
| 36C24827Q0061_1.docx | DOCX document | |
| 36C24827Q0061 Boilers .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Boilers Maintenance and Testing
I. OBJECTIVE:
A. Perform the maintenance and testing for all three (3) steam boilers located at San Juan VA Caribbean Healthcare System (VACHS).
II. PERIOD OF PERFORMANCE:
The period of performance for this service contract is a base period, plus four (4) option periods. The base period shall be twelve (12) months from the date of award, followed by four (4) option periods of twelve (12) months each to be exercised at the government's discretion.
III. REQUIRED SERVICES:
A. The contractor shall supply all labor, material and equipment to inspect and test the boilers and ancillary equipment. The work shall be documented in a full report of findings and recommendations. The following is a general list of equipment that must be addressed.
• Boiler Unit number 1 (Local identifier): Fire tube steam boiler manufactured by Hurst Boiler & Welding co., Inc., Serial number ES997-200-2.
• Boiler Unit number 2 (Local identifier): Fire tube steam boiler manufactured by York- Shipley; Serial number 96-19937-H-11618
• Boiler Unit number 3 (Local identifier): Fire tube steam boiler manufactured by Hurst Boiler & Welding co., Inc., Serial number ES997-200-1.
The service required must restore steam boiler units back in service as described in the manufacturer’s manual and in compliance with local and federal requirements or as per The American Society of Mechanical Engineers, The National Board of Pressure Vessels, VHA Directive 1810 Boiler and Boiler Plant Operations, The Occupational Safety and Health Administration, and the VHA Boiler plant Safety Devices Testing Manual Eight Edition.
At the time of this requirement, the facility has three operational Boilers, as listed above.
If the government needs to add, replace, or eliminate boilers during the life of the contract, such need will be processed via a supplemental agreement.
IV. GENERAL REQUIREMENTS:
A. All maintenance, repair and modification work shall be in accordance with the manufacturer specifications.
B. Non-destructive testing personnel shall be certified to American Society for Non-destructive Testing (ASNT) Level II, who are experienced in evaluating boilers and associated equipment.
C. The “Qualified Professional Inspector” shall demonstrate familiarity with and ready access to the current versions of the following codes and manuals:
a. ASME Boiler and Pressure Vessel Code
b. ASME B31.1, Power Piping Code
c. ANSI/NB-23, National Board Inspection Code
d. NACE International Standard RP0590, Recommended Practice for Prevention, Detection and Correction of Deaerator Cracking
e. VHA Boiler Plant Safety Device Testing Manual, current edition.
The NDT technicians shall demonstrate familiarity with and ready access to the current version of:
a. NACE International Standard RP0590, Recommended Practice for Prevention, Detection and Correction of Deaerator Cracking
D. Contractor must have at least 5 years of experience in the maintenance and repair service of steam boilers.
E. Contractor must provide evidence of having at least one certified oil burner technician for combustion adjustments as part of the workforce designated to perform under this contract.
F. Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VACHS plant. The VACHS facility manager/engineer may define and accept equivalent qualifications.
G. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references:
• NFPA 85, Boiler and Combustion Systems Hazards Code.
• VHA Boiler Plant Safety Device Testing Manual, current edition.
H. Technicians shall be equipped with calibrated portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations. Contractor shall provide the calibration certificate for each device. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.
I. All maintenance, repair and modification work shall be in accordance with the manufacturer specifications.
J. Provide at least two weeks notice to the Program Manager (PM)/ Contracting Officer’s
Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the PM/COR or his/her designate is available on site to monitor the work.
V. SPECIFIC REQUIREMENTS:
A. Provide detailed service reports of all work performed in the unit including credentials and recommendations. For safety devices use the VHA Boiler Plant Safety Devices Testing Manual latest edition.
B. The inspections, testing and calibrations shall comply with:
a. The recommendations and requirements of VHA Boiler Plant Safety Devices
Testing Manual, latest edition.
b. The written recommendations of the equipment manufacturers.
c. The requirements and recommendations of NFPA 85 Boiler and Combustion
Systems Hazards Code, including applicable appendices.
d. Burner performance requirements in this document.
C. Check combustion control operation.
D. Check the pressure limit shutdown.
E. Wipe the entire unit, particularly the operating parts.
F. Clean the oil nozzles.
G. Check and replace air compressor belt.
H. Clean compressor air filter.
I. Replace, calibrate and test the steam safety valves on boiler. Calibration and or testing must be performed in-site.
J. Open the unit’s fire side. Using flue brush and vacuum cleaner, brush through the tubes to the front end of the boiler. Replace fire side door, access holes gaskets.
K. Check the rear head refractory and patch any cracks or sprawls with refractory cement.
Contractor must notify if refractory material needs replacement.
L. Replace gage glass.
M. Inspect furnace and other internal surfaces, closures and accessories.
N. Adjust burner combustion settings and calibrate oxygen trim.
O. Calibrate all measuring devices, pressure gauges, thermometers, thermocouple, pressure transmitters, and flue gas oxygen sampling.
P. Clean water side of boiler:
a. Drain the boiler through the blowdown valve.
b. Remove all handhole covers and the manhole cover and replace with new gaskets.
c. Wash down the inside (water side) of the boiler with a hose, making sure to get all sludge out of the bottom of boiler.
d. Remove and clean the primary and auxiliary water cut off internal mechanism.
e. Inspect shell and tube surface for signs of corrosion or scale formation. If scale is forming (to any degree) on internal surface notify COR.
f. Using new gaskets, install the handhole covers and manhole covers.
g. Check stop and check valves for proper operation and replace if necessary. Fill the boiler by means of the feed water pump.
Q. Perform the following safety devices testing.
a. Low-water cutoff (slow drain)
b. Auxiliary low water cut-off.
c. High water alarm.
d. Low-water alarm.
e. High steam pressure cut-out (recycle)
f. High steam pressure cut-out (non-recycle)
g. Steam safety valves lift test.
h. Steam safety valves (accumulation test).
i. Flame scanner.
j. Check gas vent valves for leaks.
k. High-gas fuel pressure cut-off.
l. Low-gas fuel pressure cut-off.
m. 13. Oil fuel safety shut off valves.
n. 14. Low atomizing pressure fuel switch.
o. 15. High fuel oil pressure cut-off.
p. 16. Fuel oil safety shut off valves proof of closure.
q. 17. Leak test fuel oil safety shut off valves.
r. 18. Check operation of Liquid Petroleum Gas Pilot.
s. 19. Low-Pilot gas pressure cut-out.
t. 20. Forced draft fan motor interlock.
u. 21. Forced draft fan damper wide open for purge.
v. 22. Purge air flow interlock.
w. 23. Timing for pre-purge.
x. 24. Timing for post purge.
y. 25. Igniter timing.
z. 26. Low fire position interlock.
aa. 27. Combustion air interlock
bb. 28. Main flame out; i.e., time to close valves
cc. 29. Minimum igniter flame test.
dd. 30. Scanner not sensing ignition spark.
ee. 31. Low-Oxygen alarm and or cut out.
R. Immediately inform Facility POC of any recommended repairs or modifications.
S. Contractor shall develop a detailed list of information required at least two weeks prior to the inspection to allow the VA to compile the information.
T. Contractor shall develop a detailed schedule of the inspection in consultation with the VA PM/COR to ensure availability of equipment as needed during the execution of the project.
U. Visually inspect the following items and document the locations with a sketch or pictures.
Any adverse findings must be documented with pictures and notes in detail. All data shall be included in the final report as supporting documentation.
1) Review the boiler/s history including operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications.
2) All welded and threaded pipe connections to the boiler shell or drum for signs of leakage or defects in the welded areas. Defects must be documented as to location with a sketch or picture and be non-destructively tested.
3) Boiler support structure for proper alignment, evidence of sagging, shifting or misalignment.
4) Boiler casings for signs of warping, misalignment and overheating.
5) All furnace tubes and all accessible convection tubes for alignment, evidence of corrosion, erosion, bulges, sagging, defective or deteriorated welds.
6) Exposed surfaces of steam and mud drum in furnace, particularly ligament areas between tubes, for evidence of corrosion, cracking, scale buildup, other defects.
7) Refractory for cracking, shifting, sagging, bulging or general deterioration.
8) Internal areas of steam drum and mud drum (inside boiler shell in fire tube boilers).
a. Welded outlet connections.
b. Surface of drums for pitting or surface discontinuities.
c. Ligament areas between tube holes for cracking.
d. Each tube end and internal surface of representative number of tubes for pitting, erosion, corrosion and excessive scale buildup. Utilize fiber optic inspection equipment to inspect interior of tubes.
e. Clean and inspect shell or tube sheet between tube holes for cracking.
V. Testing:
The following Nondestructive testing shall be completed and document as to the location or findings with a sketch or pictures. Any adverse findings must be documented with pictures and notes in detail. All data shall be included in the final report as supporting documentation.
1. Ultrasonic thickness testing of representative samples of all components.
2. Obtain sufficient material thickness measurements to accurately reflect the condition of the entire DA.
a) Ultrasonic thickness testing of all areas visually noted to have corroded or eroded.
b) Magnetic particle testing of all areas where indications of defects have been found visually.
c) Metallurgical analysis of representative samples of boiler metal if there are indications or a record of overheating.
W. Calculations:
The contractor shall calculate and report the maximum allowable working pressure rating and remaining life expectancy based on the thickness measurements, data obtained, observations and testing for the boiler, deaerator and condensate tanks into which DA discharges.
1) ASME Code formulas must be used and references provided in the final report.
2) Calculate and report the depletion rate of material thickness.
3) Remaining life calculation shall be based on original material thickness, current material thickness, evaluation of other factors in the condition of the boiler.
X. The inspections, testing and calibrations shall comply with:
1. The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, latest edition.
2. The written recommendations of the equipment manufacturers.
3. The requirements and recommendations of NFPA 85 Boiler and Combustion
Systems Hazards Code, including applicable appendices.
4. Burner performance requirements in this document.
Y. Provide detailed service reports of all work performed in the unit including credentials and recommendations. For safety devices use the VHA Boiler Plant Safety Devices Testing Manual latest edition.
Report Requirements:
a) Provide complete written report fully describing all inspections and tests performed, findings, and recommendations. The condition of all items inspected shall be stated whether acceptable or deficient. All deficiencies shall be fully described along with recommendations for methods of correction
b) Provide oral report on condition of the boiler to PM/COR at the conclusion of the inspection and prior to leaving the site.
c) Provide complete narrative of the history of the equipment in the plant and current conditions of the same as well as an analysis of the visual inspections and test results, photographic views of deteriorated areas and photographs to show areas identified as not acceptable for continued service or requiring repair.
d) Provide calculations for remaining life based on calculated present maximum allowable working pressure vs. original maximum allowable working pressure when the boiler was new. Show locations and extent of all non-destructive testing by sketches. (Spec Writer Note: this applies to boiler, deaerator and only condensate tanks that are feed from deaerator).
e) Describe all deteriorated areas; provide expert judgment on need for repairs and repair methods.
f) Provide expert judgment on cost effectiveness of retaining the boiler in service.
g) Provide expert analysis of the condition of boilers/ancillary equipment and recommended extension to useful life in years.
h) Provide photographs and/or drawings and show where each the measurements or negative observation was taken.
i) All safety-related deficiencies shall be immediately reported to the COR during the inspection visit.
j) Provide recommendations on need for re-inspections after correction of deficiencies. Cost of re-inspections shall be extra cost negotiated with VA Contracting Officer.
Z. Immediately inform PM/COR of any recommended repairs or modifications that would be considered necessary and/or beneficial to the Boilers
VI. ITEMS AND DATA TO BE FURNISHED BY THE GOVERNMENT: The PM/COR or his designee will coordinate site access and site layout to include any equipment storage requirements. All required utilities clearances shall be obtained by VACHS personnel or designee.
VII. POINT OF CONTACT: For additional information the contractor shall contact Mr. Erick
Alvelo, Mechanical Shop Supervisor at: 787-641-7582 x-30170 or at erick.alvelo-miranda@va.gov or Eng. Carlos R. Ruiz Rosado, O&M Engineer at: 787-641-7582 x- 110425 or at carlos.ruizrosado@va.gov or Eng. Francisco Rivera Mujica at 787-641-
7582 x-110203 or at francisco.rivera-mujica@va.gov mailto:carlos.ruizrosado@va.gov mailto:francisco.rivera-mujica@va.gov
Performance Work Statement