This document is Amendment 0001 to Request for Quotation (RFQ) 36C24827Q0018, issued by the Department of Veterans Affairs Network Contracting Office 8 (Tampa, Florida). The amendment addresses vendor questions and makes specific revisions to the solicitation. The contractor question submission deadline has been extended to November 13, 2026, at 4:00 PM Eastern Time, while the quotation due date remains December 6, 2026, at 4:00 PM Eastern Time. The amendment revises Section D, Attachment 5 (Limitations on Subcontracting Certificate of Compliance) to reference VAAR 852.219-75 (Deviation), October 2026, in place of the January 2023 version. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside requirement. Offerors must submit the revised certificate with their quotation package.

The RFQ solicits a 3T Mobile MRI Trailer and Technologist Services for the William "Bill" Kling VA Clinic (Broward outpatient facility). The core requirement is to provide a 3T MRI system with a minimum 12' x 46' footprint (transportable or mobile configuration), two (2) ARRT-certified MRI technologists onsite during all operating hours (approximately 250 business days annually; 7:30 a.m. to 4:30 p.m., with an expectation of ten patients per workday), a third technologist for backup/on-call coverage, and replacement coverage within two hours if a scheduled technologist becomes unavailable. The MRI unit must be five years old or newer (refurbished equipment acceptable if FDA-cleared), preferably a Siemens Skyra or Vira system with a 70-centimeter bore, include an uninterruptible power supply (UPS) with 15-minute minimum battery backup integrated into the unit, ADA-compliant patient access with lift assembly and dressing room, patient entertainment system (audio and/or video), and comply with VHA Directive 1105.05 Magnetic Resonance Safety standards. The contractor is responsible for ensuring the unit meets structural, RF/magnetic shielding, utility, and site-specific requirements; the Government will provide approximately $341 per Community Care referral appointment for patients referred during downtime and will assess a $300-per-hour prorated downtime fee (both remedies may apply to the same event). The Government has clarified that the existing concrete pad (approximately 55' x 20') and adjacent paved area currently support a 63' x 12' mobile trailer and that transportable units (flatbed or crane-delivered) are acceptable alternatives; the contractor must verify delivery access, turning clearances, utility connections, and pad structural capacity before mobilization and conduct site visits as needed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11-19-2026 None 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Ste 160A Tampa

FL

33637 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa

FL

33637 To all Offerors/Bidders

36C24827Q0018

X X X The purpose of this amendment is to address vendor questions.

Rosetta Quinn contracting Officer

CONTINUATION PAGE

SOLICITATION NUMBER 36C24827Q0018

AMENDMENT 0001

The purpose of this amendment is to make the following changes to the RFQ:

1. The solicitation is hereby amended to revise the deadline for submission of contractor questions. Any reference to the contractor question due date identified in Block 8 of the SF 1449 is deleted and replaced with the following: Contractor questions are due no later than November 13, 2026, at 4:00 PM Eastern Time. Questions shall be submitted in writing in accordance with the solicitation instructions. The quotation due date identified in Block 20 of the SF 1449 remains unchanged unless otherwise amended.

2. Revise Section D, Attachment 5, Limitations on Subcontracting Certificate of Compliance for Services and Construction, page 65. All references to VAAR 852.219-75 (Deviation), January 2023, are hereby deleted and replaced with VAAR 852.219-75 (Deviation), October 2026. Offerors shall complete and submit the revised certificate included with this amendment as part of their quotation package.

Vendor Questions and Answers:

Q1. Quotation deadline: The SAM.gov notice lists December 4, 2026, at 4:00 p.m. Eastern, while the SF 1449 cover in 36C24827Q0018_2.docx appears to list December 6, 2026, at 4:00 p.m. Eastern. Which date controls?

A1. The quotation due date is December 6, 2026, at 4:00 p.m. Eastern Time. as identified in Block 8 of the SF 1449.

Q2. Limitations on subcontracting: The main solicitation’s table of contents identifies C.10, VAAR 852.219-75, as the October 2026 deviation. Attachment 5 identifies the January 2023 deviation and says the signed certificate must accompany the quotation. Which clause version and certificate form should offerors follow, and when must the completed certificate be submitted? Please let us know whether a corrected attachment or amendment will address the difference.

A2. Refer to the response to #2 above.

Q3. We are the leading provider for mobile MRI’s for the Federal Prisons and finding a mobile 3T is going to be difficult, due to required space in the trailer. We could propose a modular building with a fixed 3T magnet that could be installed and un-installed quickly. Would you be interested in this?

A3. The solution does not have to be mobile but cannot be a permanent structure. Additionally, there is a space limitation and requirement for MRI suite to be elevated to prevent flooding. Below are additional requirements for consideration.

1. Structural & Site Pad Requirements

· Load-Bearing Support Pad. A 3T magnet alone weighs between 15,000 and 18,000+ lbs (7,000+ kg), and a fully loaded mobile MRI trailer weighs roughly 60,000 lbs (30 tons).

· Strict Levelness. The pad must be flat, typically deviating no more than 0.125 inches per 10 feet. Unevenness interferes with patient table travel, lift operation, and magnet shimming.

· Non-Ferrous Reinforcement. Rebar or mesh in the concrete pad directly beneath the magnet should use non-ferrous materials (such as fiberglass rebar) or follow OEM steel-mass limits so it does not distort magnetic field homogeneity.

· Footprint & Delivery Access. A standard mobile trailer is 48 to 53 feet long and 8.5 to 12 feet wide, requiring roughly 60 feet of pad length plus up to 100 feet of clear tractor turning radius. Modular buildings require crane access for placement and at least 650 to 1,000 sq ft of total footprint to house the scan, control, and equipment rooms.

· Vibration & Moving Metal Exclusion. Keep the structure at least eight (8) to ten (10) + feet away from vehicular traffic, elevators, loading docks, and heavy HVAC chillers. Moving ferromagnetic objects and ground vibrations cause severe imaging artifacts on 3T scans.

2. RF & Magnetic Shielding (Five (5) Gauss Line)

· RF Faraday Cage. The scan room requires a continuous six (6) -sided radiofrequency (RF) shield (copper or galvanized steel) with RF-sealed doors, observation windows, and waveguides for all pipes and cables. Mobile trailers and modular pods have this built in, though they require an RF site survey to verify no external interference.

· 5-Gauss Fringe Field Containment. Unshielded, a 3T magnetic fringe field (the five (5) gauss line) extends roughly twice as far as a 1.5T system in three dimensions. As detailed by Medical Outfitters, the five (5) gauss perimeter must be completely contained within a physically restricted area—often requiring passive silicon-steel shielding in the walls, roof, or floor and exterior security fencing around a temporary unit.

· Continuous Chiller Power. The helium cold-head compressor must maintain uninterrupted power 24/7. Even brief power loss can cause helium boil-off or a magnet quench, requiring backup generator or shore power redundancy.

· Quench Venting. A dedicated quench pipe (typically eight (8) –12 inches in diameter) must vent cryogenic helium safely to the exterior atmosphere away from pedestrian walkways, windows, and building air intakes.

· HVAC, Water & IT. Temporary structures need medical-grade climate control to maintain strict temperature and humidity tolerances, a clean water hookup (with freeze protection) for humidifiers, and hardwired RJ45/fiber drops for PACS, telephone, and nurse-call systems.

3. Patient Access & Regulatory Compliance

· ACR Safety Zones (Zones I–IV). Even in a temporary setup, the layout must enforce American College of Radiology (ACR) safety zones, including a locked Zone III control area, ferromagnetic screening before Zone IV entry, and non-magnetic furnishings.

· ADA & Gurney Access. Mobile trailers require ten (10) to 15 feet of side clearance for a hydraulic patient lift (which can protrude up to eight (8) feet) or a covered weather-tight canopy/vestibule connecting the temporary structure to the main hospital.

· Permits & OEM Sign-Off. Local building/zoning permits, state health department approvals, and a final site-planning sign-off from the scanner manufacturer (e.g., Siemens, GE, Philips) are mandatory before delivery and physicist acceptance testing.

Q4. The PWS requires a “mobile 3T MRI trailer” and specifies a minimum 12’ x 46’ transportable unit. Please clarify whether the Government requires a conventional over-the-road mobile MRI trailer configuration, or whether a transportable/modular 3T MRI suite that is delivered to the site and remains in place during performance is acceptable, provided it meets all clinical, technical, accessibility, safety, shielding, environmental, IT, and performance requirements of the PWS.

A4. Section 4.4., PWS, page 19. Transportable units are appropriate these can typically be oversize load delivered on flatbed or crane delivered. A conventional mobile MRI trailer or transportable/modular MRI unit may be considered, provided the proposed configuration meets all applicable clinical, technical, structural, utility, accessibility, magnetic safety, and life safety requirements.

The existing installation accommodates a conventional MRI trailer measuring approximately 63 feet long by 12 feet wide. The trailer is positioned along the western side of the building, with its front oriented north and its patient entrance located on the passenger side, facing the building.

The facility has an established internal roadway network; however, delivery and maneuvering clearances are constrained by existing buildings, landscaping, curbs, and roadway geometry. The existing trailer's orientation suggests it may have been backed into its current location.

Alternative delivery methods, including oversized flatbed transportation or crane placement, may be feasible but would require additional evaluation. Allowing alternative configurations provided the contractor demonstrates compatibility with existing site conditions and identifies any specialized delivery, installation, or infrastructure requirements.

Q5. Please clarify whether the stated minimum 12’ x 46’ dimensions refer to the unit in its transport configuration or its deployed/operational configuration.

A5. Section 4.4., PWS, Page 19. It recommends that the minimum 12' × 46' dimensions apply to the MRI unit itself, with vendors separately identifying the complete transport and operational configurations. This interpretation should be confirmed against the intended PWS requirements.

1. Preliminary measurements indicate the following:

· Existing MRI trailer: approximately 63' L × 12' W.

· Existing concrete installation pad: approximately 55' L × 20' W.

· Additional adjacent paved area potentially available for positioning, with approximately 88 feet identified during preliminary measurement.

· Existing canopy column spacing: approximately 14 feet.

· Distance from the northern edge of the concrete pad to the canopy center: approximately 11.5 feet.

Therefore, the pad dimensions alone should not be considered the maximum allowable the current trailer extends beyond the designated concrete pad into the adjacent paved area.

The existing trailer is also positioned asymmetrically relative to the pad, potentially to accommodate patient access, including the stairway and wheelchair lift. Vendors should provide the proposed unit's dimensions in both transport and fully deployed configurations, including stabilizers, stairs, wheelchair lift, access platforms, mechanical equipment, and required maintenance clearances.

Final dimensional limitations remain subject to field verification.

Q6. Please clarify the mobility expected during contract performance. Is the unit expected only to be delivered at the beginning of performance, remain onsite, and be removed at contract completion, except when the Government requests relocation, or is routine over-the-road movement anticipated during performance?

A6. Yes. It will stationery Q7. Please confirm whether any FDA-cleared 3T MRI manufacturer/model is acceptable if the proposed system satisfies all PWS performance requirements.

A7. Yes. Service prefers Siemens Skyra or Better Vira. Refurbished equipment is acceptable (but not preferable), if it meets FDA medical device requirements.

Q8. The PWS requires the mobile 3T MRI unit to be five (5) years old or newer. Please clarify whether this age limitation applies to the MRI scanner/magnet, the trailer or transportable structure, or both. Please also clarify whether an OEM-certified remanufactured or refurbished system is acceptable if it satisfies all PWS requirements.

A8. Section 4.3, PWS, page 18. Both. Refurbished equipment is acceptable (but not preferable), if it meets FDA medical device requirements.

Q9. Please clarify whether the uninterruptible power supply (UPS) must provide power to the MRI scanner for patient scanning or only to the computer and environmental systems. Given UPS size and trailer space constraints, may the UPS be installed inside the clinic building rather than within the MRI unit?

A9. Section 4.3, PWS, page 19. Uninterruptible Power Supply (UPS) must provide power to the MRI scanner for patient scanning, as well as the computer, environmental systems and must be part of MRI unit.

Q10. Please confirm that the staffing requirement is for two (2) ARRT-certified MRI Technologists to be physically onsite simultaneously during all scanner operating hours, with a third qualified and credentialed technologist maintained as backup coverage.

A10. Section 4, PWS, page 18. Yes, we require two (2) ARRT-certified MRI Technologists to be physically onsite for MRI operation.

Q11. Please clarify whether the third technologist must be dedicated full-time to this contract or may serve as qualified, credentialed backup/on-call coverage.

A11. Section 2.9.1, PWS, page 16. No. But expectations are that there is full-time coverage.

Q12. The PWS requires replacement coverage within two (2) hours when a scheduled technologist is unable to complete an assigned shift. Please confirm whether this means the Contractor must restore the required two-technologist onsite staffing level within two hours.

A12. Section 2.9.2, PWS, page 16. Yes. Coverage must be provided within two (2) hours.

Q13. Please clarify whether MRI services are required on Federal holidays or Government closure days and identify the anticipated annual operating days/hours that offerors should use for staffing and pricing.

A13. Section 3, PWS, Page 17. Approximately 250 business days. No Federal Holidays coverage required, except Executive orders ad-hoc Holidays. VA budgeted in advance and not affected by Government Furlough/Shutdown.

Q14. Please provide available historical and anticipated MRI examination volumes for the William “Bill” Kling VA Clinic, including average examinations per day, month, and year, and, if available, the anticipated examination mix.

A14. Refer to the response to #s A13 and A16.

Q15. Please identify any current MRI backlog or other workload assumptions that the Contractor should consider when developing its staffing and operational plan.

A15. The Government is not aware of any additional workload assumptions that offerors should consider beyond the requirements identified in the solicitation. Although MRI wait times and backlogs currently exist, offerors should base their quote on the workload and performance requirements stated in the PWS. No additional workload should be assumed.

Q16. Does the Government have a minimum expected daily or monthly examination throughput, or other productivity requirement, beyond the performance standards stated in the PWS? If so, please provide the applicable requirement.

A16. Expectation is ten (10) patients /workday.

Q17. Please provide a current site plan or drawing identifying the proposed MRI unit location, pad dimensions, delivery/access route, maneuvering clearances, patient access route, and utility connection points.

A17. The proposed location is the existing MRI trailer installation area along the western side of the Broward outpatient clinic.

The site currently includes:

· A concrete installation pad measuring approximately 55' × 20'.

· An existing MRI trailer approximately 63' × 12'.

· An established internal roadway network accessible from Commercial Boulevard.

· Multiple roadways turn requiring consideration of trailer length, turning radius, and vehicle off tracking.

· An approximately 25-foot patient access connection between the building and trailer.

· An existing overhead canopy, stairway, and wheelchair lift.

· Existing utility connection infrastructure.

· Restricted areas and physical barriers associated with MRI magnetic-field safety.

The current trailer is oriented with its front facing north and rear facing south. The patient entrance is located on the passenger side, facing the building. Electrical utility connections are reportedly located toward the southern portion of the installation, while mechanical equipment, potentially including HVAC components, appears to be positioned toward the northern/front end of the trailer.

These arrangements should be considered when evaluating replacement configurations, particularly where proposed equipment has different entrance locations, utility connection points, or mechanical service requirements.

The contractor should verify the proposed delivery route, turning clearances, vertical restrictions, equipment positioning, utility connections, and patient access requirements before mobilization.

Facilities Management and Services (FMS) will coordinate with site management regarding the availability of existing drawings and utility documentation.

Q18. Please confirm that the Government-provided cement pad is suitable for the loaded weight and point loads of a compliant 3T MRI unit and provide available pad load specifications or engineering information.

A18. The existing concrete installation pad currently supports a mobile MRI trailer. Photographs indicate that the trailer utilizes stabilizing supports, resulting in concentrated loads at designated support locations. However, we cannot certify the structural capacity of the existing pad or adjacent pavement without reviewing available engineering documentation. The contractor should provide the proposed equipment's total operating weight, axle loads, stabilizer locations, individual point loads, and required bearing capacity. Any proposed use of the adjacent roadway for equipment support must be evaluated separately, including pavement suitability and required emergency access. Final determination of structural compatibility will require appropriate engineering verification.

Q19. Please identify the electrical service available at the proposed location, including voltage, phase, amperage, connection type, and any Government-furnished disconnects or transformers, as well as available data/network and other required utility connections.

A19. The facility provides power as any General Commercial site. There is a connectivity box for images transfer from MRI internal memory to PACS.

Q20. Please clarify which site modifications, utility work, permits, inspections, and connection costs will be Government-furnished, and which are the Contractor’s responsibility.

A20. The existing MRI installation reportedly utilizes a shore power-style electrical connection arrangement, like systems used in marine and RV applications. The specific voltage, amperage, connector configuration, and ownership of the associated equipment remain subject to verification Existing electrical connections are reportedly located toward the southern portion of the installation.

It’s recommended that the contractor evaluate compatibility with the existing infrastructure and identify any required modifications to electrical service, utility connections, patient access, equipment positioning, or site preparation. The contractor should also identify any specialized transportation, crane placement, temporary obstruction removal, or other installation-related requirements.

Existing Government infrastructure may be available for continued use where technically compatible. However, any additional Government-furnished work, modifications, or associated costs must be specifically identified and authorized through the appropriate lease contracting processes.

We cannot commit to additional infrastructure modifications or expenditures without further evaluation and approval.

Q21. Please clarify whether existing water and sanitary sewer connections are available at the proposed MRI unit location. If not, will the Government provide new connections?

A21. There are no existing water and sanitary sewer connections. The contractor should identify all water supply, drainage, and sanitary requirements associated with the proposed MRI configuration. Any required new connections or infrastructure modifications must be evaluated before determining Government or contractor responsibilities.

Q22. Will the Government provide an opportunity for prospective offerors to conduct a site visit before quotation submission to evaluate delivery access, pad configuration, utilities, patient access, and equipment siting requirements?

A22. Yes.

Q23. The PWS states that repairs or delays extending beyond two (2) working days will require a replacement trailer. Please clarify whether the replacement must itself be a fully compliant 3T MRI unit meeting all PWS requirements, including the five-year age limitation.

A23. Section 4.11., PWS, page 25. Yes. Our expectations either repair completed within two (2) days, or replacement equipment provided. Technical details flexibility of provided replacement equipment can be negotiated within contract but plans to provide fast solution with minimal impact on patient's care should be created.

Q24. Please clarify whether the replacement unit must be delivered, installed, tested, and operational within the two (2) working-day period, or whether the Contractor must initiate replacement arrangements within that period.

A24. Section 4.11., PWS, page 25. Yes. Unless there are unforeseen circumstances impact that timeframe. Additional weekend/holidays time can be negotiated.

Q25. Would the Government accept a functionally equivalent temporary 3T MRI solution during repair of the primary system, provided required clinical capabilities and continuity of patient care are maintained?

A25. Yes.

Q26. The PWS provides for a $300-per-hour proration during MRI downtime and reimbursement of Community Care referral costs resulting from downtime. Please clarify whether both remedies may be assessed for the same period/event or whether they are alternative remedies.

A26. Section 3.3., PWS page 19. They may be assessed for the same event as Community Care costs are potential additional costs on top of downtime.

Q27. Please confirm that downtime deductions and Community Care referral costs apply only to interruptions attributable to Contractor equipment or Contractor performance, and not to interruptions caused by Government utilities, Government IT/PACS connectivity, facility conditions, Government-directed closures, or other circumstances outside the Contractor’s control.

A27. Yes.

Q28. Given that this is a services acquisition under NAICS 621512, please clarify whether the costs of leasing the required 3T MRI scanner, mobile trailer, and associated equipment from a third-party provider may be excluded from the 50% limitation on subcontracting calculation.

A28. Section C10, page 62. The limitation on subcontracting requirement will be applied in accordance with VAAR 852.219-75 and 13 CFR 125.6. The Government will not exclude specific cost elements, such as MRI scanner, mobile trailer, or equipment lease costs, from the limitation on subcontracting calculation for purposes of this solicitation. Offerors are responsible for preparing their quotations and ensuring compliance with all applicable limitation on subcontracting requirements.

Q29. Could you please confirm whether a specific OEM and scanner model are required, or whether a compliant 3T MRI system from any OEM would be considered? Are there any specific OEM compatibility or service requirements we should be aware of?

A29. Section 9, PWS, page 40. The service prefers Siemens Skyra or Better Vira. Refurbished equipment is acceptable (but not preferable), if it meets FDA medical device requirements.

Q30. Could you also confirm the deadline for submitting questions and the current proposal deadline?

A30. Refer to the response to #A1 above.

Q31. We would appreciate clarification regarding the treatment of mobile MRI equipment rental costs under the limitations on subcontracting requirements.

A31. Section C10, page 62. Offerors are responsible for ensuring compliance with the Limitations on Subcontracting requirements in accordance with “VAAR 852.219-75 (Deviation), October 2026”, and applicable SBA regulations. The Government will not make advance determinations regarding the treatment of specific cost elements, including mobile MRI equipment rental costs, for individual offerors. Offerors shall independently assess their proposed performance approach and certify compliance with all applicable subcontracting limitations.

Q32. Given that this solicitation includes both equipment rental and clinical technologist services, would the VA consider the MRI trailer and equipment rental costs separately from the service-related costs when determining compliance wiF th the 50% limitations on subcontracting requirement, or would the calculation apply to the total contract value?

A32. Section C10, page 62. The limitation on subcontracting requirement will be applied in accordance with VAAR 852.219-75, Limitations on Subcontracting - Certificate of Compliance for Services and Construction, and applicable SBA regulations at 13 CFR 125.6. For a services contract, compliance is generally based on the amount paid by the Government for personnel costs. Offerors are responsible for ensuring compliance with the limitation on subcontracting requirements as set forth in the solicitation. The Government will evaluate quotations in accordance with the solicitation and applicable regulations but will not provide individualized compliance determinations regarding a specific offeror's proposed cost structure.

Q33. The November 4 presolicitation notice identifies the requirement as a 100% SDVOSB set-aside, and the RFQ includes the SDVOSB set-aside clause at Section C.2. However, the set-aside field in the November 6 SAM.gov solicitation notice appears blank.

A33. This requirement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside reference Box 10.

Q34. Could you please confirm whether this procurement is a 100% set-aside for SBA-certified SDVOSBs or is unrestricted? Specifically, are firms that are not certified SDVOSBs eligible to submit a quotation and receive award as the prime contractor?

A34. Refer to the response to #A33 above.

Q35.Of the MRI machine must always be in compliance with VHA Directive 1105.05 Magnetic Resonance Safety. When MRI machine is in use, the Contractor must have a minimum of two (2) MRI technologists in Zones III through IV. Is it a requirement for 2 MRI technologists to work in the trailer as all times?

A35. Yes.

Q36. Contractor must be responsible for providing coverage to the VA during periods of absences/vacancies of the Contractor’s MRI technologists due to sick leave, personal leave, vacations and additional coverage as required. In the event a scheduled technologist is unable to complete an assigned shift, the contractor shall provide replacement coverage within two (2) hours and notify the Contracting Office Representative (COR) immediately of the schedule change. Will the 3rd MRI tech be on-call personnel? This would be the only way to assure a replacement for sick leave in another MRI tech calls out sick at 5am in the morning.

A36. Yes.

Q37. Prorated Fee/Cancellations: The Contractor shall prorate the monthly rental fee in the event the Contractor is unable to provide MRI services in accordance with the requirements of this PWS. The monthly fee shall be prorated based on the number of hours the MRI trailer is out of service during the scheduled operating hours of 7:30 a.m. to 4:30 p.m., at an hourly rate of $300.00. Is the pro-rated $300 hourly rate related to how many patients get sent out to the community for care for down time? Also, if you are sending patients out to the community, will they be scanned with a 3T MRI?

A37. Section 3.3, PWS, page 18. The $300 per hour prorated amount applies to MRI service downtime during scheduled operating hours and is separate from any costs associated with Community Care referrals. In addition to the prorated downtime amount, the Contractor may be responsible for the Government's costs associated with Community Care referrals resulting from the downtime. Community Care reimbursement rates are updated periodically and are currently approximately $341 per appointment. Patients referred to Community Care are referred based on clinical need and study availability, not based on a requirement for a specific MRI equipment type (e.g., 3T MRI).

Q38. A properly sized online double-conversion UPS system that meets the MRI manufacturer’s specifications and supports the MRI trailer’s electrical load. The UPS must provide continuous conditioned power, surge protection, voltage regulation, and a minimum of 15 minutes of battery backup during power interruptions. Does the UPS need to support the chilled water system as well as the whole mobiles HVAC system, lights, Patient lift, Fire Suppression etc.?

A38. Yes.

Q39. The scanner must offer a patient entertainment system that enables the patient to experience digital media during the MRI scan procedures. Is digital media to be interpreted as sound only or are you asking for video and a sound system?

A39. The Government will accept either an audio-only patient entertainment system or a system that provides both audio and video capabilities, provided it enables patients to experience digital media during MRI scan procedures and otherwise meets the requirements of the solicitation.

Q40. MRI trailer must be a minimum of 12’x46’ transportable unit. Could we use a Modular transportable building to house the 3 T system?

A40. Please see responses #s A4, A5, A6, A7, and A8.

Q41. Americans with Disabilities Act (ADA) compliant aluminum lift assembly for entering and exiting of the MRI trailer. Do you require a (ADA) complaint dressing room as well?

A41. Yes.

Q42. Do you require a fire suppression system since there will be a very large lithium battery UPS back up system housed in the trailer?

A42. The need for dedicated fire suppression should be determined based on the proposed UPS battery chemistry, capacity, equipment configuration, manufacturer specifications, and applicable fire and life safety requirements. The contractor should provide the proposed battery system specifications, equipment listings, fire protection provisions, and any associated ventilation or thermal management requirements. These should be reviewed by the appropriate facility for fire protection and safety personnel before final requirements are established.

Q43. Does the 3T need to be a 70 cm bore size?

A43. Yes Q44. MRI mobile and tech was curious on if you had a preference on MRI Brand/type and field strength, once I have this information, I can better assist you on the options and machines we can provide.

A44. Field Strength is in requirement. Preferred Siemens Vira.