Solicitation Summary: Replace Miami VAMC Building 1 Roof

This is a Request for Proposal (RFP) issued by the Department of Veterans Affairs, Network Contracting Office 8, for the replacement of the roof on Building 1 at the Bruce W. Carter VA Medical Center in Miami, Florida. The solicitation number is 36C24826R0132, and the project number is 546-24-129. The contract is a firm-fixed-price, bid-build construction project with a magnitude between $10,000,000 and $20,000,000. The roof replacement covers approximately 214,564 square feet across multiple building areas and includes demolition of existing roofing systems, installation of new roofing materials, lightning protection system replacement, flashing and gutter installation, and removal and reinstallation of photovoltaic panels in designated areas. The applicable NAICS code is 238160 (Roofing Contractors). Proposals are due electronically by 11:00 AM EST on December 28, 2026, with a site visit scheduled for December 4, 2026, and an RFI cutoff of December 9, 2026. The contract performance period is 1,095 calendar days from the Notice to Proceed.

This is a tiered set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with evaluation proceeding through successively broader tiers: SDVOSB, VOSB, other small businesses, and large businesses only if necessary. At award, contractors must maintain active registrations in SAM and the Veteran Small Business Administration (VSBA) certification database. Evaluation will be based on six factors: Specialized Experience and Capability (10 pages maximum), Technical Approach, Schedule (10 pages maximum with Gantt chart), Past Performance (Relevant and Recent), Roofing Warranty, and Price. All non-price factors are equally weighted and significantly more important than price. Performance and payment bonds at 100% of contract price are required within ten calendar days of award. Contractors must have a minimum of five years' experience as a Florida-licensed roofing contractor with three completed or in-progress roof projects of at least 175,000 square feet within the last ten years, with hospital roofing projects preferred. The proposal must include a minimum twenty-year roofing system warranty with full labor and material coverage, manufacturer certification of installer qualifications, and a detailed itemized Schedule of Values organized by roofing areas. Liquidated damages of $5,100 per calendar day apply for contract delays. Personnel vetting is required at the Tier 2/Moderate Risk level, and all employees must complete VA cyber security and privacy training. Davis-Bacon wage rates per General Decision FL20260215 apply, and supplemental insurance requirements include workers' compensation with $100,000 employer's liability, $500,000 general liability per occurrence, and $200,000 automobile liability per person.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 72

36C24826R0132

X

11-25-2026

546-24-129

36C248

Department of Veterans Affairs

Network Contracting Office 8 (NCO 8)

Miami VA Healthcare System

1201 NW 16th Street

Miami FL 33125

Aldwyn Singleton 407-538-1130

Project Title: Replace Miami VAMC Building 1 Roof

Project No.: 546-24-129

Project Location: Bruce W. Carter VA Medical Center, 1201 NW 16th Street, Miami, FL 33125

NAICS code: 238160 Size Standard $19.0M

Magnitude of Construction: Pursuant to VAAR 836.204(h)(1), the magnitude range is between $10,000,000.00 and $20,000,000.00

In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this procurement is set aside for SDVOSBs utilizing a tiered set-aside evaluation approach, including other than small businesses, to minimize delays in the re-solicitation process.

The Contractor shall completely prepare the project site for operations, including demolition and removal of existing elements, furnish labor and materials, and perform work according to the statement of work and as required by the drawing and specifications.

At the time of proposal submission, and at the time of award, interested contractors MUST be actively registered in the following databases: System for Award Management (SAM) - https://www.sam.gov

Veteran Small Business Administration (VSBA) - https://veterans.certify.sba.gov

Funds are not currently available for this procurement. No contract award will be made until appropriated funds are made available. The Government cannot guarantee additional funds will be made available for award (reference 38 U.S.C. 8104).

Site Visit: Friday, December 04, 2026, at 09:00 am EST.

Requests for information (RFI) are due Wednesday, December 09, 2026, at 11:00 am EST.

Requests for Proposals (RFP) are due Monday, December 28, 2026, at 11:00 am EST.

10 1095

X SOW Section 5.2.1

X

1 Electronic 11:00AM EST

12-28-2026

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C248

Department of Veterans Affairs

Network Contracting Office 8 (NCO 8)

Miami VA Healthcare System

1201 NW 16th Street

Miami FL 33125

Department of Veterans Affairs

Financial Services Center

P.O. Box 149971

Austin TX 78714-9971

Aldwyn Singleton

VHA-RPOE-2024-0079

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

A.4 DELIVERY SCHEDULE

STATEMENT OF WORK

REPRESENTATIONS AND INSTRUCTIONS

2.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025)

2.2 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2025)

2.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)

(DEVIATION NOV 2025)

2.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025)

(DEVIATION)

2.6 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (MAY 2014)

2.7 52.228-1 BID GUARANTEE (SEP 1996)

2.8 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)

2.9 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025)

(DEVIATION)

2.10 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

2.11 VAAR 852.236-93 SITE VISIT (CONSTRUCTION) (OCT 2026) (DEVIATION)

2.12 VAAR 852.236-94 PREPARATION OF PROPOSALS (CONSTRUCTION) (OCT 2026) (DEVIATION)

2.13 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

GENERAL CONDITIONS

3.1 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

3.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION NOV 2025)

3.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) (DEVIATION NOV

2025)

3.4 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026)

3.5 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023)

(DEVIATION NOV 2025)

3.6 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)

3.7 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

3.8 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (OCT 2026) (DEVIATION)

3.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR

SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

3.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

3.11 SUPPLEMENTAL INSURANCE REQUIREMENTS

3.12 MANDATORY WRITTEN DISCLOSURES

3.13 IT CONTRACT SECURITY

3.14 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

SOLICITATION NOTICE OF TIERED SET-ASIDE EVALUATIONS

SDVOSB/VOSB REQUIREMENTS

EVALUATION PROCEDURES AND PROPOSAL SUBMISSION REQUIREMENTS

EVALUATIONS PROCEDURES: ............................................................................... Error! Bookmark not defined.

BASIS FOR AWARD: .............................................................................................. Error! Bookmark not defined.

ATTACHMENTS

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB __________________ __________________

BID-BUILD (BB) CONSTRUCTION PROJECT 546-24-129 “Replace Miami VAMC Building 1 Roof” at the Bruce W. Carter VA Medical Center, 1201 NW 16th Street, Miami, FL 33125.

The Contractor shall furnish all labor, materials, equipment, supervision, and services to replace the Building 1 roof (approximately 214,564 SF) in accordance with the Statement of Work (SOW), drawings, and specifications.

PRINCIPAL NAICS CODE: 238160 – Roofing Contractors.

PRODUCT/SERVICE CODE: Z2DA – Repair or Alteration of Hospitals and Infirmaries.

Period of Performance: 1,095 calendar days from the Notice to Proceed (NTP).

GRAND TOTAL __________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER QUANTITY DELIVERY DATE

0001 SHIP TO:

Bruce W. Carter VA Medical Center 1201 NW 16th Street Miami, FL 33125

USA

1.00 1,095 calendar days after NTP

STATEMENT OF WORK

Bid-Build SOW “Replace Miami VAHS BLDG1 Roof”

Project 546-24-129

1.0 Introduction.

The Miami VA Healthcare System (MVAHCS) is seeking professional construction services for the "Replace Miami VAHS

BLDG1 Roof” Project 546-24-129, located at the Miami VA Healthcare System (MVAHCS), 1201 NW 16th Street, Miami, FL 33125.

2.0 Description / Scope / Objective.

2.1. The Contractor shall furnish sufficient technical, supervisory, and administrative personnel to ensure the expeditious accomplishment of the work specified in this Statement of Work (SOW) to Replace Building 1 Roof at MVAHCS.

Additionally, the contractor shall furnish all services, materials, supplies, equipment, side investigations, studies, and travel required in connection with this SOW.

2.2. Contractor shall adapt, as necessary, any Government drawings, specifications, or standards provided to meet project requirements.

2.3. All equipment and materials shall comply with the Buy American Act (BAA).

2.4. Contractor shall:

• Provide Roofing System as per design. Contractor to provide certification.

• Warranty Installers have been certified by manufacture of roofing system as a qualified installer.

• Provide a Manufacture Field Rep on site for inspections of material and certain critical stages of installation (30%, 60%, 90% and Final).

• Have the Roof Installation certified by the Roof Manufacturer.

3.0 Applicable Documents.

3.1. The following laws, regulations, policies, and procedures in effect on the date of contract issuance and all subsequent changes or updates apply:

FAR Federal Acquisition Regulation

VAAR Veterans Administration Acquisition Regulation

VA Directives, Design Manuals, Master Specs https://www.cfm.va.gov/til/

ASME American Society of Mechanical Engineers

OSHA Occupational Safety and Health Administration

SCA DOL Website WWW.SAM.GOV

3.2. Glossary: Acronyms used in this SOW are listed below for easy reference:

ANSI American National Standards Institute AWS American Welding Society

CO Contracting Officer COR Contracting Officer’s Representative https://www.cfm.va.gov/til/ http://www.sam.gov/

FAR Federal Acquisition Regulation NFPA National Fire Protection Association OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Administration TIL Technical Information Library SOW Statement of Work MVAHCS Miami Veteran Affair Healthcare System LPS Light Protection System

4.0 Performance Requirements.

4.1. Building 1 Roof, 214,564 square feet (SF), includes the following areas: Areas A, AA (Inpatient Medical Care), B (Education program, Chaplain service, Pharmacy Program), BB (ACS/Specialty Care), C (Pathology program), D, E (Inpatient Surgical Intensive Care Unit), F (Police/Security Service), G (MAS), H (Mental Health Clinic), I (Radiation Therapy Program), J (Radiation Therapy Program), L (Corridor), M (Information Resource Management), O (Rehab.

Medicine Program), P (Human Resource Service, Rehab. Medicine Program), Q (Electrical transformer room), R (Nursing Service Administration, Education Program), S (Director’s Suite), T (Medical Research), U (Mechanical Room), V (Inpatient Coronary intensive Care), W (Surgery Program), X (Surgery Program), Y (Inpatient Medical Care), Z (Elevator Machine Room), Main entrance porch, Mech Area #42 and Mech Area #43 at the Miami VA Healthcare System, Miami, Florida. Contractor to field verify.

4.1.1 Roof Area Clarification: The correct roof area for Area “T”, as referenced in Drawings AD101, AE101, PD101, P-101, MD101, M-101 and E-101, is 4,331 square feet (SF). This corrected quantity shall supersede any conflicting square footage indicated for Area “T” on the previously mentioned drawings. All other project requirements shall remain unchanged.

4.2 The contractor shall perform the following tasks:

4.2.1 Provide a detailed phasing plan, including start and end dates, per roofing areas (mentioned above).

4.2.2 An asbestos assessment/testing was previously performed during the design phase of Building 1 by a subcontractor/consultant retained by the A/E, and the reported test results were negative for asbestos-containing materials (Attachment 3 - VA Miami Roof Asbestos Survey). Notwithstanding the previous negative test results, the Contractor shall be responsible for verifying existing conditions prior to commencing any demolition, removal, cutting, drilling, or other work that may disturb existing building materials.

4.2.3 The Contractor shall exercise due diligence and shall immediately notify the government of any material or condition encountered that is suspected to contain asbestos or that differs from the conditions represented in the previous testing. No suspected material shall be disturbed until the condition has been properly evaluated and authorization to proceed has been provided.

4.2.4 Provide a detailed crane plan, including start and end dates. Please refer to drawing GI003 (Crane Location Map).

This drawing is for reference only, it’s the solely responsibility of the prime contractor to provide a feasible crane plan.

4.2.5 Provide a means and methods plan on how the roofing debris will be removed from the roof. Roofing trash is the prime contractor’s responsibility.

4.2.6 Roofing area C contains photovoltaics (PV) panels. The contractor shall remove, preserve and reinstall the PV panels upon roofing replacement in this area. A qualified contractor to provide a certification letter after PV re-installation.

4.2.7 Follow 100% construction drawings and demolish existing roofing system, including insulation built-up roofing, weather barriers, vapor barriers, flashing, roofing drainage and any other components necessary for the proper replacement of the roof systems.

4.2.8 Follow 100% construction drawings and install new roofing system, including insulation built-up roofing, weather barriers, vapor barriers, flashing, roofing drainage and any other components necessary for the proper installation of the roofing systems.

Note: Lightning Protection System (LPS): The Contractor shall remove and replace the existing Lightning Protection

System (LPS) with an entirely new system, including but not limited to air terminals, conductors, sacrificial pads, connectors, bonding components, and all associated accessories. Reuse or reinstallation of existing LPS components shall not be permitted. This SOW requirement shall supersede any conflicting notes or instructions on Drawings E-101, E-

102, and EG001 regarding preservation or reinstallation of the existing LPS. The new system shall be installed, tested, and certified by a qualified Lightning Protection Contractor. The Contractor shall provide a certification letter and warranty documentation and coordinate all activities with the Project COR and Miami VA Electrical Shop.

4.2.9 Provide flashing and new gutters to each roof area listed above, and re-seal all roof penetrations and cracks including Drains, Pipes, Structural Support, etc.

4.2.10 Remove and replace the existing roof drains on all Roof Areas; roof drains shall have the properly pitched for drainage.

4.2.11 Existing unused mechanical supports/stands shall be removed. Existing in use Mechanical Supports shall be properly secured/attached to the existing structural roof prior to roof repairs.

4.2.12 The metal roofing systems for Mechanical Roof Areas #42 and #43 shall be considered delegated design. The awarded Contractor shall be responsible for providing manufacturer-prepared shop drawings, including applicable structural calculations, attachment details, and product specifications, as required. All delegated design documents shall be submitted to the Architect/Engineer (A/E) for review and approval prior to fabrication or installation. The notation

“Aluminum Standing Seam Metal Roof By Others” on Drawing AE110 refers to this delegated design requirement.

4.2.13 Pre-Demolition Roof Leak Assessment: Prior to commencing demolition, the Contractor shall perform a visual assessment of Mechanical Roof Area #42 and #43, Area “Q” and between Areas “P” and “R”, where a previous roof leak has been reported, as indicated on Drawings AD104, AD105, AD107, AD108 and AD109. The Contractor shall submit a pre-assessment report, including photographs, documenting existing conditions, visible signs of water intrusion, and any deficiencies or potential issues that may affect the roof replacement. The Contractor shall notify the Architect/Engineer

(A/E) and Contracting Officer’s Representative (COR) of any findings requiring further evaluation or corrective action prior to proceeding with the affected work.

4.2.14 As indicated on Drawing MD401, the Contractor shall coordinate the Air Handling Unit (AHU) shutdown and associated duct removal with the VA at least thirty (30) calendar days in advance. The VA shall provide temporary cooling and ventilation to the affected areas for a maximum period of seven (7) calendar days while the roofing system beneath the existing ductwork is being replaced. Any temporary cooling and ventilation required beyond the seven (7) calendar-day period due to Contractor-caused delays, excluding documented weather-related delays or unforeseen conditions beyond the Contractor’s control, shall be the sole responsibility of the Contractor, including all associated costs, equipment, installation, operation, maintenance, and removal. Any extension or exception shall require prior written authorization from the Contracting Officer (CO).

4.3. All work shall be fully functional and neat in appearance with no visible defects. The contractor shall not leave any equipment abandoned in place.

4.4. The contractor shall comply with all general requirements for this project, including but not limited to, adhering to project schedules (Section 013216.15 - Project Schedules (Small Projects)), submitting necessary shop drawings, product data, and samples (Section 013323), following safety requirements (Section 013526), and ensuring quality control (Section 014500).

4.5. The contractor is responsible for providing work of a standard and quality as specified in this SOW and must comply with the Quality Control specifications (Section 014500).

4.5.1 The contractor shall comply with the specifications in section 070150.19 for preparation for re-roofing, including protection of the existing roof during construction, a schedule for roof removal and new installation, details on how to transition between old and new roofing, inspection, and testing criteria to ensure the new roof is properly installed.

4.6. The contractor shall adhere to all safety requirements (Section 013526) to ensure the safety of all workers and personnel in the facility.

4.7. The contractor shall comply with all requirements for Construction Waste Management (Section 017419), ensuring that all waste materials are properly disposed and provide a Disposal Certificate. The work site shall always be clean and safe.

4.8. The contractor shall procure all necessary roofing materials, including miscellaneous items, from a roofing manufacturer whose products meet or exceed the specified standards to avoid product warranty issues. Alternative manufacturers may be considered if their products are shown to meet the required specifications (Mixing Manufacturer

Products are Not allowed).

4.8.1 Contractor shall provide a final approved inspection report by the Roofing Product Manufacturer certifying that all products were installed as per the Roofing Manufacturer Specifications.

4.9. The Contractor shall NOT use any Miami VA dumpsters and receptacles shall not be used by the contractor for this purpose.

4.10. Prime Contractor or Qualifier Subcontractor shall meet the following criteria:

Have a minimum of 5 years of experience as a Florida Roofing Licensed Contractor with a valid, active License and provide a minimum of 3 completed or in progress roof projects similar in size and type as per the Project SOW within the last 10 years (Minimum Roof Size 175,000 SF)

Note: For Prime Contractors looking to qualify using an out of State of Florida Licensed Roofing Contractor, Contractor shall provide evidence of license reciprocity with the State of Florida and meet the above criteria.

Note: All Contractors Shall provide a digital copy of their Active Roofing Contractor License CCC for verification purposes.

No exception.

Note: License will be used to demonstrate the Years of Qualified Experience Required

An experienced roofing licensed contractor with at least 10 years in the field brings a lot of benefits. For instance, comprehensive understanding of various roofing materials and systems. High-quality work that ensures structural integrity and longevity of the roof. A roofing contractor with at least 10 years of experience is likely to have encountered and successfully resolved a lot of issues in the past. A contractor with 10 years of experience is likely to complete the project efficiently and manage timelines and resources effectively. As a summary, the Miami VA seeks a highly experienced roofing contractors to execute a flawless roof replacement. Our goal is to ensure a top-quality installation that minimizes the likelihood of future warranty claims. By prioritizing excellence in the initial installation, we aim to prevent potential issues such as leaks, which could lead to secondary problems including mold growth, damage to valuable equipment, and most critically, compromising the safety of our veterans.

4.11. Contractor shall comply with the requirements for conducting a Pre-Construction Risk Assessment (PCRA) (PCRA will be given to awardee), prior to starting construction. The PCRA helps minimize safety risks to patients, staff, and contractors.

4.12. For each roofing system contractor shall provide the following documentation from the manufacturer:

- Applicable installation/user manuals.

- Maintenance instructions.

- Warranty information.

- Technical specifications.

- Safety data sheets.

5.0. Scheduling, Phasing, Billing and Working Hours.

5.1. Primary place of performance is the Bruce W. Carter, Miami VA Medical Center, 1201 NW 16th Street, Miami, Florida, 33125.

5.1.2. Hours of Work: The contractor shall perform work from 6:00 AM – 6:00 PM Monday through Friday. Any work performed during WHEN hours (Weekends, Holidays, Evenings, and Nights) must be requested 14 calendar days in advance. The request must be in writing and coordinated with the project’s COR. Additionally, construction shall be performed (scheduled and phased) to ensure egress/ingress are completely operational by normal business hours the following workday. No work shall be performed during U.S. Federal Holidays. See https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ for more information.

5.1.3 Restricted Work Hours – Radiation Therapy Areas: Roofing work above Areas J (Radiation Therapy), as identified on

Drawings AD106 and AE106, shall be performed during evening hours or weekends to avoid interference with radiation therapy operations during normal business hours. The Contractor shall coordinate all affected activities, including work schedules, access, and associated trades, with the Project COR and applicable VA departments prior to commencing work. All work shall be scheduled and phased to minimize disruptions to ongoing medical operations.

5.2. Work that will require utility shutdowns, or that will cause unreasonable disruptions to areas outside of the worksite may have to be performed after hours and on weekends. If this is the case, this work must be scheduled at least 14 calendar days in advance with the COR.

5.2.1. The period of performance (POP) is 1,095 calendar days, after issuance of Notice to Proceed.

5.3. The contractor shall check in with the COR each time they are on-site to complete scheduled work.

5.4. Cranes: Before the crane arrives on the site, the contractor shall submit: Crane maintenance logs, crane operator’s license, and a drawing showing the crane’s operational and exclusion zone. All documents shall be revised and approved by the MVAHCS Safety Office prior to scheduling the work. Crane coordination shall be completed with COR of the project at least 14 days prior to the crane’s arrival onsite.

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

5.5 The contractor shall provide an itemized Schedule of Values (SOV) organized by roofing areas and within each roofing areas includes all applicable divisions as applicable (Roof removal, roof installation, electrical, mechanical, plumbing, etc). No Lump Sum SOV will be accepted.

6.0. Deliverables.

6.1. Contractor shall coordinate all work with project COR.

6.2. The contractor shall submit documents with a transmittal letter for review and approval to the COR detailing the roofing materials (including and not limited to roofing materials, and any other materials from different trades, as applicable) with specification sheets and part numbers highlighted and visible for all areas before any materials are purchased.

6.3. Contractor shall provide a site superintendent and an OSHA 30 Certified Safety Officer appointment letter.

Note: All Contractor, Subcontractors or Sub of the Subcontractors Employees shall be minimum Certified as an OSHA 10.

Contractor shall provide a cost loaded schedule (cost/value), progress schedule, Insurance Certification, list of Subcontractors to CO and COR after issuance of NTP and before commencement of work.

6.4. The Contractor shall prepare and submit a Daily Report for each day work is performed on site. The Daily Report shall include, at a minimum, the date; onsite working hours (start time and end time); weather conditions; full name of all personnel present on site, including Prime Contractor employees, subcontractors, sub-subcontractors, and any other personnel performing work on site; company and/or trade affiliation of each individual; description and location of work performed; significant deliveries, inspections, testing, delays, disruptions, safety incidents, or unforeseen conditions;

and progress photographs documenting the work performed. The Daily Report shall be submitted to the COR no later than the following business day and shall become part of the official project record.

6.5. The contractor shall provide any applicable manuals, user guides, maintenance instructions, or warranty information in new materials.

6.6. Contractor shall provide daily logs, payrolls, and invoice.

6.7. Contractor shall provide a base and updated monthly schedule.

6.8. Contractor shall provide a weekly production schedule.

6.9 Roofing Warranty:

6.9.1. Warranty information must be provided with the proposal.

6.9.2 The Contractor shall provide all warranties required by the Contract, including a one-year construction warranty and a minimum twenty (20) year roofing system warranty covering all labor, materials, components, accessories, flashing, penetrations, and workmanship.

6.9.3 The Contractor shall ensure all roofing materials, installation methods, inspections, and documentation meet manufacturer and VA requirements necessary to maintain full warranty eligibility.

6.9.4 Warranty must cover the cost of labor to correct any leaks, material defects, and workmanship.

6.9.5 All warranty certificates, activation forms, maintenance instructions, service logs, and contact information shall be compiled and submitted in the final closeout package. A pre-warranty conference shall be held prior to final acceptance to establish mutual understanding of warranty requirements and communication procedures.

6.10. The Contractor shall procure and have on hand all Roofing Materials and Submittals approved before starting any demo. No exception.

6.11. Prior to final acceptance and project closeout, the Contractor shall provide the COR with two (2) complete hard-copy sets of all project closeout documentation, including, but not limited to, all approved submittals and shop drawings, product data, Operation and Maintenance (O&M) manuals, maintenance manuals and instructions, manufacturer literature, warranties and guarantees, warranty certificates and activation documentation, testing and inspection reports, certifications, Safety Data Sheets (SDS), record/as-built drawings, permits, final inspection and approval documentation, training documentation, service information, and all other closeout documentation required by the Contract Documents. All hard-copy closeout documentation shall be complete, current, organized, clearly labeled, and provided in durable binders with an index/table of contents and labeled dividers. Electronic copies shall not be accepted as a substitute for the required hard-copy sets unless specifically authorized in writing by the COR.

7.0 Recycled Content Products:

Contractor to follow list of items with brand name or equal specification on GREEN items as follows. Recycled content products are products that are made from or contain recovered materials. That means replacing virgin materials with recycled materials, including post-consumer materials. Designated products in eight categories include paper and paper products, vehicular, construction, landscaping, park and recreation, transportation, non-paper office, and miscellaneous products. Examples of designated products include structural fiberboard, printing, and writing papers. The current list of designated products, EPA’s guidance, and related technical information can be found on EPA’s website at http://www.epa.gov using advanced search engine.

8.0 Environmentally Preferable Products (EPP):

Environmentally Preferable Products (EPP) are products or services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the products or services. Examples of environmentally preferable products include cleaning products that are non-toxic, non-volatile, and biodegradable, and paint with no or low volatile organic compounds. This program is managed by EPA which maintains a database of products and specifications defined by federal, state, and local agencies, and other nations. The database can be found at www.epa.gov/epp along with EPA’s Guidance on the Acquisition of Environmentally Preferable Products and Services located at http://www.epa.gov/epp/pubs/index.htm.

9.0 Contractor Personnel:

9.1. The Contractor shall be responsible for employing qualified personnel to perform the work specified in this SOW.

The Contractor shall make sure that the subcontractor and employees have proper documentation to authorize personnel to work in the United States of America. The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements.

9.2. Contractor and all subcontractor’s employees shall be financially responsible for screen and mandatory background checks required by the MVAHCS Police Department. Contractors, and subcontractor employees are required to wear a VA government-furnished badge while performing services under this contract at all times. The badge will contain a personal picture, name of employee, and the Contractor's name. Badges shall be worn on the outer garment attached to the outer shirt or jacket pocket by a button or clip or worn around the neck secured by an appropriate identification card lanyard.

9.3. Government-issued identification badge remains the property of the Government and shall be returned to the issuing office or other designated Government personnel upon transfer of Contractor employees from the contract.

9.4. The contractor shall ensure that the employee or subcontractor has a valid driver’s license when driving a vehicle on the property.

http://www.epa.gov/epp/pubs/index.htm

10.0 Safety/Security Requirements.

10.1. The Contractor shall comply with OSHA regulations pertaining to Confined space and Fall protection specific to the work environment related to this contract.

10.2. The Contractor shall comply with all applicable federal, state, and local laws and ensure performance is secure while protecting material, equipment, and supplies from damage and loss. Government security personnel shall have the express right to inspect for security violations at any time during the term of the contract.

10.3. The Contractor and all subcontractors’ employees shall have the 10-hour OSHA safety course; the project supervisor shall have the 30-hour OSHA safety course. The General Contractor shall provide copies of certification to the Contracting Officer (CO) for every employee who works on the job site.

10.4. The contractor shall furnish fire extinguishers which must be provided and maintained in construction areas and temporary storage areas.

10.5. Maintain all construction permits visible and updated as required by the MVAHCS Safety Office and Infection Control Department.

10.6. Existing fire protection shall not be impaired. Fire watch shall be provided for all impairments more than four (4) hours in 24 hours.

10.7. Perform Hot Work in accordance with NFPA 241 and NFPA 51B.

10.8. Miami VA Medical Center is considered a smoke-free campus. Smoking (including e-cigs, and vaping) is not authorized by personnel anywhere on the VA medical grounds.

10.9. Means of egress shall not be blocked. Egress routes for construction workers must be maintained free and unobstructed.

10.10. All electrical installations must comply with OSHA 1926, NFPA 241, and NFPA 70.

10.11. All temporary construction partitions must meet fire safety requirements.

10.12. The contractor shall prevent accidental smoke detector operation.

10.13. Dispose of waste and debris from buildings DAILY.

10.14. Follow all additional requirements as specified in the MVAHCS Construction Policy.

10.15. All information generated in the performance of this contract becomes the property of the Government and must be surrendered upon request and/or completion of the contract. The Contractor must protect against the destruction and/or misplacement of all information produced under this contract unless directed under local policy to destroy. This includes both hard and soft copies of data.

10.16. The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the COR.

11.0 Damages/Insurance

The contractor and subcontractor employees shall be liable for any damage caused to Government property, equipment, utilities, etc., located at the site (i.e., sprinkler heads, ceiling tiles, manholes, fire hydrants, vehicles, windows, etc.). The contractor shall immediately report any damages to the COR and shall provide a written report, within 24 hours. The report shall include what occurred, who was involved, when it occurred (Time/Date), where it occurred, why it occurred, how it occurred, pictures, any supporting documentation, and the proposed means to repair or replace. The contractor shall maintain free and unobstructed access to facility emergency services and for fire, police, and other emergency response forces in accordance with NFPA 241. If the contractor fails to complete the work within the time specified in the contract, the Government shall be entitled to liquidated damages in the amount of $5,100.00 for each calendar day as a general conditions rate for Parking Rental and Construction Management Contract Extensions of delay until the work is completed or accepted by the Government. If the Government terminates the Contractor’s

Right to Proceed, Liquidated Damages will continue to accrue until the work is completed.

REPRESENTATIONS AND INSTRUCTIONS

2.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

(DEVIATION NOV 2025)

(a) Definitions. As used in this provision—

"Administrative proceeding" means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

"Federal contracts and grants with total value greater than $10,000,000" means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

"Principal" means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment;

and similar positions).

(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than

$10,000,000.

(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in—

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

(End of Provision)

2.2 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2025)

(a) This provision implements section 523 of Division B of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts.

(b) If the Offeror is proposing a total contract price that will exceed $7 million (including options), the Offeror shall certify that, to the best of its knowledge and belief, it.

(1) Has [ ] filed all Federal tax returns required during the three years preceding the certification.

(2) Has not [ ] been convicted of a criminal offense under the Internal Revenue Code of 1986; and

(3) Has not [ ], more than 90 days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the Internal Revenue Service and is not in default, or the assessment is the subject of a non-frivolous administrative or judicial proceeding.

(End of Provision)

2.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021) (DEVIATION NOV 2025)

(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal Acquisition Regulation 2.101.

(b) Certification. [Offeror shall check either (1) or (2).]

_____ (1) The Offeror certifies that—

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the

President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section

403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a https://www.sam.gov/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or

(2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of noncompliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless—

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the

President of the United States has—

(i) Waived application under U.S.C. 2593e(d) or (e); or https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the

Contracting Officer may terminate any contract resulting from the false certification.

(End of Provision)

2.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (NOV 2025) (DEVIATION)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request…

This is the start of the file's text. The full file is on GovTribe.