This is a Base Offer Price Breakdown template for a federal construction contract to replace the roofing system on Building 1 at the Bruce W. Carter VA Medical Center in Miami, Florida under solicitation 36C24826R0132 (Project No. 546-24-129). The template is structured to capture detailed pricing across 24 MasterFormat divisions, requiring offerors to separate labor costs and material costs for each division, with columns for calculating division subtotals. The form includes fields for overhead percentage, profit percentage, and bond percentage, which are applied sequentially to calculate the total base offer cost that must match CLIN 0001 on the SF 1442. A secondary breakdown section requires offerors to provide pricing by specific roof areas (designated A through Z, plus Main Entrance Porch and two mechanical areas) to prevent lump-sum pricing, with area subtotals that must reconcile to the division subtotals.

The underlying solicitation is a Request for Proposal issued by the Department of Veterans Affairs, Network Contracting Office 8, for roofing replacement on approximately 214,637 square feet with a period of performance of 1,095 calendar days. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses under 38 U.S.C. 8127 with a tiered evaluation process, with a small business size standard of $19.0 million and an estimated magnitude between $10,000,000 and $20,000,000. Award will be based on best value to the Government with non-price factors significantly more important than price. The proposal deadline was Monday, December 28, 2026, at 11:00 AM EST, with a site visit scheduled for December 4, 2026, and RFI deadline of December 9, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown
Solicitation No. 36C24826R0132
Project Number:546-24-129

Edward L Roy: VA assigned project #

Date:
Project TitleReplace Miami VAMC Building 1 Roof

Edward L Roy: VA assigned Project Title

Project LocationBruce W. Carter VA Medical Center, 1201 NW 16th Street, Miami, FL 33125
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoid lump sum This price offer breakdown is the overall base offer price for Government price analysis

Total Base Offer Cost must equal CLIN 0001 on the SF 1442.
Attachment 4 – Base Offer Price Breakdown (Rev. November 2026)

Breakdown by Roof Area

Breakdown by Roof Area (SOW 5.5 – No Lump Sum)
Solicitation 36C24826R0132 | Project 546-24-129 | Replace Miami VAMC Building 1 Roof
Roof AreaLabor CostMaterial CostTotal Cost
A$0.00
AA$0.00
B$0.00
BB$0.00
C$0.00
D$0.00
E$0.00
F$0.00
G$0.00
H$0.00
I$0.00
J$0.00
L$0.00
M$0.00
O$0.00
P$0.00
Q$0.00
R$0.00
S$0.00
T$0.00
U$0.00
V$0.00
W$0.00
X$0.00
Y$0.00
Z$0.00
Main Entrance Porch$0.00
Mech Area #42$0.00
Mech Area #43$0.00
Roof Area Subtotal$0.00$0.00$0.00
Must equal Division Subtotals:$0.00OK
Attachment 4 – Base Offer Price Breakdown (Rev. November 2026)