RLP 36C248-26-R-0002 Updated Sections.pdf
PDF 52 KB Posted
- Attached to
- X1DB--Homestead CBOC Cancellation
- Solicitation number
- 36C24826R0002
About this file
This document is a Request for Lease Proposal (RLP) # 36C248-26-R-0002 with updated sections focusing on building and sustainability requirements for a federal space lease. The document specifies that the proposed space must be located in a modern, high-quality building with a facade of stone, marble, brick, stainless steel, or aluminum, and can be either a new or existing building that has undergone modernization. For projects 10,000 RSF and above, offerors must provide documentation for either Leadership in Energy and Environmental Design (LEED) or Green Globes certifications, including scorecards, checklists, and brief statements explaining how proposed credits will be achieved. Additionally, offerors must identify accredited professionals (LEED or Green Globes) as team members and outline their roles throughout the project, with certification levels ranging from Silver/Two Green Globes for new construction to Certified/One Green Globes for interior design and construction.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP # 36C248-26-R-0002 Updated Sections
RLP Section 1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE
(OCT 2022):
B. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. New and Existing Buildings are accepted. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
RLP Section 3.06 ADDITIONAL SUBMITTALS (OCT 2024):
S. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Leadership in Energy and Environmental Design® for New Construction (LEED-NC) credits for Silver level certification. For LEED, this documentation is the LEED-NC scorecard.
Along with the proposed scorecard or checklist, the Offeror shall submit a brief statement outlining how each of the proposed credits will be achieved. If pursuing LEED-NC, the Offeror must identify the U.S. Green Building Council LEED Accredited Professionals as team members, including their roles throughout the project.
OR
For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Green Globes for New Construction (GG-NC) credits for Two Green Globes level certification. If pursuing Green Globes-NC, the Offeror may add GBI Green Globes Professionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project.
T. The Offeror must provide a Leadership in Energy and Environmental Design® for Interior Design and Construction (LEED-ID+C) scorecard documenting the proposed credits to meet LEED certification (at the minimum Certified level). Along with the proposed LEED- ID+C scorecard, the Offeror shall submit a brief statement outlining how each of the Credits proposed on the scorecard or checklist will be achieved. In addition, the Offeror must identify the U.S. Green Building Council LEED accredited professionals as team members, including their roles throughout the project.
OR
The Offeror must provide a Green Globes for Sustainable Interiors (Green Globes SI) project checklist documenting the proposed criteria and points to meet Green Globes certification
(at the minimum One Green Globes level). Along with the proposed Green Globes SI checklist, the Offeror shall submit a brief statement outlining how each of the Credits proposed on the scorecard or checklist will be achieved. The Offeror may add GBI Green Globes Professionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project.
File details come from the government source that posted it. Updated .