This document is a set of clarifications for a Veterans Affairs (VA) Request for Lease Proposal (RLP) for a facility in Homestead, FL. The clarifications address multiple inconsistencies and questions about the lease requirements, including building specifications, sustainability standards, Design Intent Drawings (DIDs), parking, occupancy dates, and space planning. Key clarifications include: (1) both existing buildings and new building land options are acceptable, (2) Green Globes certification can be used in addition to LEED requirements, (3) Design Intent Drawings are required with the offer, (4) 150 total parking spaces are required, (5) the occupancy readiness date is amended to 8/15/2027, (6) the public bus stop distance requirement is 2,640 feet, and (7) no seismic requirements are needed for this location. The final clarification addresses space planning, specifying that the total space should be a minimum of 17,350 to a maximum of 17,400 square feet of ANSI/BOMA Occupant Area.

View the file

Other files

File Type Posted
36C248-26-R-0002 0004_1.docx DOCX document
36C248-26-R-0002_6.docx DOCX document
36C248-26-R-0002 0003.pdf PDF
3 - Exhibit B - Agency Special Requirements ASR Revised January 8 2026.pdf PDF
36C248-26-R-0002_5.docx DOCX document
RLP 36C248-26-R-0002 Updated Sections.pdf PDF
36C248-26-R-0002 0002.pdf PDF
36C248-26-R-0002_4.docx DOCX document
36C248-26-R-0002 0001.pdf PDF
15 - Exhibit N - Deliverables IAW RLP 36C248-26-R-0002.xlsx XLSX spreadsheet
13 - Exhibit L - Security Unit Price List FSL II Oct 2024.xlsx XLSX spreadsheet
1 - 36C248-26-R-0002 - Global Request for Lease Proposal RLP - Homestead CBOC Relocation.pdf PDF
4 - Exhibit C - Security Requirements FSL Level II Oct 2024.pdf PDF
2 - Exhibit A - 36C248-26-L-0003 - Global Lease Template L100 June 2025.pdf PDF
10 - Exhibit I - GSA Form 12000 Prelease FPLS Evaluation Part A - Part B May 2015.pdf PDF
6 - Exhibit E - GSA Form 1217 Lessor Annual Cost.pdf PDF
9 - Exhibit H - 2025 04 VA GSAR Representation 552 270 33 Nov 2024.pdf PDF
36C248-26-R-0002_3.docx DOCX document
11 - Exhibit J - Sample Request for Past Performance and Questionaire.pdf PDF
5 - Exhibit D - Form 1364 Proposal to Lease Space Jan. 2023.pdf PDF
12 - Exhibit K - Tenant Improvements Cost Summary TICS Table Oct 2024.xlsx XLSX spreadsheet
8 - Exhibit G - 3517B General Clauses Feb. 2025.pdf PDF
7 - Exhibit F - 3516 Solicitation Provisions Feb. 2025.pdf PDF
3 - Exhibit B - Agency Special Requirements.pdf PDF
14 - Exhibit M - Labor Standards Provisions and DOL Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLARIFICATIONS

1. CLARIFICATION ONE:

RLP Section 1.02 – B states, “The space shall be located in a modern quality Building of sound and substantial construction with a façade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space..”

The first paragraph of the ASR states, “The US Department of Veterans Affairs (VA) desires to lease sufficient Rentable Square Feet (RSF) of existing real property….”

Can the Agency clarify if they will accept both existing buildings and land options for a new building?

Yes, both are acceptable

2. CLARIFICATION TWO:

RLP Section 3.06 S and T states LEED requirements. Lease Section 3.49 states LEED requirements.

Would the VA consider replacing these sections with Green Globes requirements?

Yes, this amendment will allow Green Globes as well

3. CLARIFICATION THREE:

Per RLP Section 3.08 Turnkey Pricing With Design Intent Drawings Prior To Award (Oct 2017) and Lease Section

4.01 Schedule For Completion Of Space (OCT 2024) it appears that the agency does not intend to do a Design Intent Drawing meeting.

Is it the Agency’s intent to not holding a Design Intent Drawing meeting post award?

No. DIDs are required with the offer

4. CLARIFICATION FOUR:

Lease Section 4.01 Schedule For Completion of Space A,B, and C are intentionally deleted.

This section typically sets out the parameters for DIDs.

Can the Agency clarify the timing and schedule of Design Intent Drawing meeting?

It is the offeror's responsibility to interpret the requirements in the RLP and provide an offer including DIDs based upon the requirements set forth in the VA Technical Information Library.

5. CLARIFICATION FIVE:

RLP Section 1.02 – C, and RLP Section 4.06 & 4.07 Factor 1, Sub Factor 6 state 150 parking spaces required. RLP Section 4.05 Factor 1, Sub Factor 6 states, “A minimum of 80 parking spaces..”.

Exhibit B – ASR, first paragraph states, “On-site parking for approximately 60 vehicles…”.

Can the agency clarify the total required parking spaces and the amount required exclusively for handicap?

150 is the correct number

6. CLARIFICATION SIX:

RLP Section 4.05 – Factor 6 Occupancy Date Readiness states a readiness date of 11/01/2026.

RLP Section 4.06 & 4.07 – Factor 6 Occupancy Date Readiness states a readiness date of 8/15/2026.

Can the agency clarify the intended Occupancy Readiness Date?

This amendment changes it to 8/15/2027

7. CLARIFICATION SEVEN:

RLP Section 1.05 – D & Section 4.07 Factor 1, Sub Factor 4, state a public bus stop must be within 1,320 feet. RLP Section 4.06 Factor 1, Sub Factor 4 states, a public bus stop must be within 2,640 feet.

Can the agency clarify the required distance of the site to be within a public bus stop?

The correct distance is 2,640 ft.

8. CLARIFICATION EIGHT:

RLP Section 2.03 states requirements for Seismic Safety – Moderate Seismicity. RLP Section

2.04 states requirements for Seismic Safety – Heigh Seismicity.

RLP Section 3.06 states, “Evidence of seismic safety compliance as required in Section 2 of this RLP.”

Homestead, FL is not located within a seismic zone, can the agency clarify if this project contains seismic requirements?

No Seismic requirements. This amendment will delete these sections

9. CLARIFICATION NINE:

Many line items in ASR – item #4. Space Plan shows a quantity and NUSF, that when multiplied, equals out to the listed Totals SF. Such as Lobby/Reception Area (1 x 390 = Total SF 390) or Examination Room (3 x 125 = 375SF). See the attached Excel Space Plan for a full list highlighted in green.

Other line items such as Exam/ Consultation Room, Specialty Audiology Area, and Staff Toilet locker/break (see attachment for full list of rooms) show a quantity of rooms and an NUSF, that when multiplied, do not equal the listed Total SF in Exhibit B. See the attached Excel Space Plan for a full list highlighted in yellow.

When adding up the totals that are listed in Exhibit B under the “Total SF” column, the totals add up to 23,342 SF. This is 5,942 more SF than maximum listed ABOA of 17,400 in Section

1.02 of the RLP.

Can the agency please amend the Space Plan provided to show the correct amount of room quantities and intended square footage?

The correct amount is a minimum of 17,350 to a maximum of 17,400 of American National Standards Institute/Building Owners and Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF). See attached updated ASR

1. CLARIFICATION ONE:
2. CLARIFICATION TWO:
3. CLARIFICATION THREE:
4. CLARIFICATION FOUR:
5. CLARIFICATION FIVE:
7. CLARIFICATION SEVEN:
8. CLARIFICATION EIGHT: