This is a Request for Information (RFI) Log for a federal construction project involving exterior signage and wayfinding upgrades at a VA facility (FY26: NRM Project 548-23-112, RFQ #36C24826Q0480).
The log documents thirteen questions and answers exchanged between potential contractors and the VA between April 24, 2026 and May 5, 2026. Key clarifications provided by the VA include: (1) contractors must use vetted signage vendors with established track records; (2) Daktronics is an approved alternate to Watchfire for EMC boards with equal or better resolution; (3) contractors bear full responsibility for electrical work including trenching, conduit, wiring, and panel connections; (4) contractors must complete final footing design with signed/sealed calculations by a Florida registered structural engineer submitted for A/E-VA review and approval prior to installation; (5) dumpsters on-site are limited to 40 cubic feet; (6) full-size samples are review/mockup items unless contract documents explicitly permit final installation use; (7) existing pole usage is specified in the Exterior Sign Program Documents; (8) site restoration must comply with construction specifications; (9) work outside normal hours or restricted access requires advance VA review and approval with contractor coordination on phasing; and (10) the proposal deadline was extended to June 3, 2026 at 10:00 AM EST. All VA responses reference the Construction Specifications (Division 01 General Requirements, Division 10 Specialties, and Division 27 Communications) and the Exterior Sign Program Documents 100% Submittal Part 2 of 4 dated February 21, 2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Log FY26: NRM (PROJ: 548-23-112) BB Upgrade Exterior Signage and Wayfinding
RFQ # 36C24826Q0480
RFI
Number
Question VA Response
Reference Sheet, Section of
Detail
Dated Received
1Q: Do you have a list of recommended signage vendors that can meet the plans and specification requirements?
04/24/2026
1R: VA Response:
The specified products and processes are common within the industry. Offerors are expected to include vetted providers with established positive track records providing and installing the specified products.
05/04/2026
2Q: Are there any off-hours required for this project? 04/28/2026
2R: VA Response:
Refer to 12R VA Response
05/04/2026
3Q: Has the VA finalized the location of the emergency room sign?
04/28/2026
3R: VA Response:
The location of the Emergency Entrance Identification Signs (XC3, XC4) and Emergency Department Identification Sign (XW20) is provided in the Exterior Sign Program Documents 100% Submittal Part 2 of 4 (21 February 2025)
Sign XC3
• Page 14 of 140: Sheet
AP06
• Pages 36, 37 of 140: Sign Type Page 1 of 2, Sign Type Page 2 of 2
Sign XC4
• Page 15 of 140: Sheet
AP07
• Page 38 of 140: Sign Type
Sign XW20
• Page 23 of 140: Sheet
AP15
• Pages 108, 109 of 140:
Sheet 1 of 2
4Q: Regarding sign type Xi1, is there an approved alternate EMC board that can be used instead of Watchfire?
04/28/2026
4R: VA Response:
Daktronics with equal or better resolution is an approved alternate.
5Q: Will existing poles be reused? 04/28/2026
5R: VA Response:
Existing pole usage is provided in the Exterior Sign Program Documents 1005 Submittal Part 2 of 4 (21 February 2025)
Section 04: Sign Message Schedule(s)
05/04/2026
6Q: Will a dumpster be allowed on-site? If so, what is the maximum size allowed?
04/28/2026
6R: VA Response:
Dumpster no larger than 40 CF will be allowed on site and will be positioned and maintained in accordance with VA Project Manager guidance.
7Q: Will the full-size samples be used for the final installation or remain the property of the VA?
04/28/2026
7R: VA Response:
Full-size samples, if provided, should be treated as review/mockup items unless the contract documents or approved submittals specifically permit use for final work.
If the contractor proposes to use the full-size samples as part of the final installation, the sample must conform to all approved requirements listed in drawings, specifications, and VA Signage Design Manual requirements.
Final acceptance is still subject to A/E review, VA inspection and approval. In addition, use of sample in final installation does not waive any contract requirements or warranty obligations
Additional information:
Construction Specifications (21 February 2025)
• Division 01 – General Requirement s
• Division 10 - Specialties
8Q: For bidding clarity, please confirm the full extent of contractor responsibility for electrical work associated with illuminated signage, including trenching, conduit, wiring, and connections to existing electrical panels.
Electrical Scope Responsibility
04/28/2026
8R: VA Response:
The contractor is responsible for the full extent of the electrical work associated with signage installation and operation to include trenching, conduit, wiring, and connections to existing electrical panels.
9Q: Please confirm that final sign footing design, including engineering calculations and any required geotechnical considerations, is the responsibility of the contractor.
Structural / Footing Design Responsibility
04/28/2026
9R: VA Response:
The final footing design, including engineering calculations and any required geotechnical considerations, is the responsibility of the contractor in accordance with the VA requirements, manufacturer requirements, contract documents, applicable codes, and field-verified conditions. Signed/sealed calculations by a Florida registered structural engineer shall be provided.
These shall be submitted for A/E-VA review and approval prior to installation.
Additional information:
Construction
• Division 01 – General Requirement s
• Division 10 – Specialties
• Division 27 - Communicati ons
05/04/2026
10Q: Are the sign quantities and locations shown in the drawings to be considered final for bidding purposes, or should contractors include allowances for field verification and potential adjustments?
Sign Quantities & Field Verification
04/28/2026
10R: VA Response:
Field verification is considered part of the Contractor’s coordination responsibility and does not, in itself, establish entitlement to additional cost or time. Any potential adjustments that differ from the contract documents shall be submitted to the VA and the AE for review and potential approval prior to fabrication or installation.
11Q: Please clarify the required extent of site restoration following removal of existing signage, including expectations for concrete, asphalt, landscaping, and surface finishes.
Existing Sign Removal & Site Restoration
04/28/2026
11R: VA Response:
Site restoration requirements shall comply with requirements included in the construction specifications for this project.
Additional Information:
Construction
12Q: Please provide any known phasing requirements, restricted access areas, or limitations on working hours due to ongoing hospital operations that should be considered in the contractor’s schedule and pricing.
Phasing, Access & Work Hour Constraints
04/28/2026
12R: VA Response:
Contractor’s schedule and pricing should be based upon the contract documents. Any work outside normal hours or restricted access should be submitted in advance for VA review and approval. Contractor shall work with the VA project management staff to review and approve proposed phasing.
13Q: We respectfully request an extension of the current bid date from May 13, 2026, to May 27, 2026.
04/24/2026
13R: VA Response:
Proposals due: 06/03/2026 at 10:00 AM EST
05/05/2026