S06 Attachment_RFI Log 2 - Questions and Answers - 36C24826Q0480_4 Pages.pdf

PDF 376 KB Posted

Attached to
Z1DA--FY26: NRM (PROJ: 548-23-112) BB Upgrade Exterior Signage and Wayfinding
Solicitation number
36C24826Q0480
Issued by

About this file

This is a Request for Information (RFI) Log documenting questions and answers related to a federal exterior signage and wayfinding upgrade project. The solicitation is for FY26 NRM (Project 548-23-112) under Solicitation Number 36C24826Q0480, issued by the VA.

The RFI addresses twelve questions received between May 5 and May 13, 2026, with VA responses dated May 18, 2026. Key contractual clarifications include: the contractor bears full responsibility for all electrical work associated with signage installation, including trenching, conduit, wiring, and connections to existing electrical panels; the contractor must manage permitting requirements as specified in the Exterior Sign Program Documents; the VA will not retain signage removed during the project; and contractors are responsible for preservation, protection, and repair or replacement of any grass or existing work disturbed during equipment movement. Technical specifications clarified include the intermediate electrical floor location (above the 9th floor), confirmation that power supplies for "VA" channel letters may be placed on the intermediate electrical floor with required enclosure, and LED band positioning directly below the molding underneath the VA signage. The molding is confirmed as precast concrete per VA as-built drawings, and wall sections are available from as-built drawings. The log references the Exterior Sign Program Documents (100% Submittal, Parts 3 and 4), Project Specifications (100% Final Documents), and the SOW for Upgrade Exterior Signage and Wayfinding for additional contractual requirements.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log #2 – Additional Site Visit FY26 NRM (PROJ 548-23-112) BB Upgrade Exterior Signage and Wayfinding

Solicitation Number 36C24826Q0480

RFI

Number

Question VA Response

Reference Sheet, Section of

Detail

Dated Received

1Q: Request a total sign count for all signs? Or the excel version of the attachment for Sign Message schedule?

05/05/2026

1R: VA Response:

Total sign count and schedule is provided in the Exterior Sign Program Documents. There is not an excel version available of the Sign Message Schedule.

Exterior Sign Program Documents 100% Submittal

• Part 3 of 4

• Part 4 of 4

05/18/2026

2Q: W1 and W2 about 18 of each, we will need 1 line for data and 1 line power for the Samsung digital screens. Do we need to run new power and data or will VA handle that?

05/05/2026

2R: VA Response:

The contractor is responsible for the full extent of the electrical work associated with signage installation and operation to include trenching, conduit, wiring, and connections to existing electrical panels.

05/18/2026

3Q: Sign type Xi1: Is there a list of alternative VA-approved EMC units other than Watchfire?

05/13/2026

3R: VA Response:

Refer to RFI Log #1: 4R

05/18/2026

4Q: Will the VA retain the signage that is removed? 05/13/2026

4R: VA Response:

VA will not retain existing signage after it is removed.

05/18/2026

5Q: Will permitting be required? 05/13/2026

5R: VA Response:

Permitting (if required) is provided in the Exterior Sign Program Documents and Specifications

• Exterior Sign Program Documents 100% Submittal

• Project Specificatio ns 100% Final Documents

6Q: Can the signage be modified to accommodate engineering or installation requirements if necessary?

05/13/2026

6R: VA Response:

Refer to RFI Log #1: 10R

05/18/2026

7Q: Where is the intermediate electrical floor located in reference to the “VA” channel letters on the building?

05/13/2026

7R: VA Response:

Intermediate electrical floor is located above the 9th floor.

8Q: Can the power supplies for the “VA” letters be placed on the intermediate electrical floor?

05/13/2026

8R: VA Response:

Yes, and required enclosure.

9Q: What is the specific placement of the LED band on the building in reference to the molding?

05/13/2026

9R: VA Response:

The LED band is to be positioned directly below the molding underneath the VA signage. See attached illustration.

10Q: What material is the molding made of? 05/13/2026

10R: VA Response:

The molding is made of precast concrete as shown on the VA as-built drawings.

11Q: XI1: Are we permitted to move equipment onto the grass?

05/13/2026

11R: VA Response:

If equipment is moved onto the grass for execution of required work, contractor shall be responsible for preservation, protection, and repair/replacement.

SOW Upgrade Exterior Signage and Wayfinding

• 3.2 Protection of Existing Work

05/18/2026

12Q: Are wall sections available from the “As Built” architectural plans?

05/13/2026

12R: VA Response: 05/18/2026

LED Band

Wall sections are available from our As-Built drawings.

File details come from the government source that posted it. Updated .