This architectural drawing (AE503) depicts typical roof details for a VA Medical Center construction project in Lake City, Florida. The detailed technical drawings show multiple roof penetration and support configurations for modified bitumen (Mod Bit) and thermoplastic polyolefin (TPO) roofing systems, including specific details for pipe penetrations, pipe supports, mechanical curbs, and sleeper supports. Key technical specifications include minimum 12-inch clearances, continuous metal capping, counterflashing, membrane flashing compatibility, wood nailers anchored to the deck, and instructions for roof membrane cutting and reinstallation. The drawings are part of the bid documents for the "BB Correct Patient Privacy Deficiencies 2N/2S Lake City" project, prepared by Toland + Mizell Molnar as the architect/engineer of record for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 573A418603 Visitor Registry.pdf | ||
| 36C24825R0067 0003.pdf | ||
| RFIs 36C24825R0067 Correct Patient Privacy.pdf | ||
| Pre-bid RFIs 2025 06 02.pdf | ||
| AE302.pdf | ||
| AE709.pdf | ||
| SAM DBA 05_02_25.pdf | ||
| 36C24825R0067 0002.docx | DOCX document | |
| 36C24825R0067 0001.docx | DOCX document | |
| 36C24825R0067_1.pdf | ||
| Specifications (2).zip | ZIP file | |
| S02-Solicitation Attachments.zip | ZIP file | |
| 36C24825R0067_1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FASTENER
PREFIN METAL COUNTER
FLASHING ON METAL CLEAT
PREFAB CURB
2x WOOD NAILERS
MASTIC SEAL
MOD BIT ROOF MEMBRANE
PER SPECIFICATIONS
CANT
TURN MOD BIT STRIP-IN UP
AT CURB
LINE OF MECHANICAL EQUIP
MOD BIT STRIP-IN
1'
4"
4"
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
4"
12" MIN
TURN COUNTERFLASHING
DOWN 1" INTO PIPE
PIPE PENETRATION - FIELD
VERIFY LOCATIONS
PREFIN METAL COUNTERFLASHING
CONT SEALANT
STAINLESS STEEL CLAMPING
RING
MOD BIT STRIP-IN
MOD BIT ROOF MEMBRANE
PER SPECIFICATIONS - TURN
FINISH LAYER UP AT PIPE
MIN 4"
MASTIC SEAL
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
CONT SEALANT
STAINLESS STEEL CLAMPING
RING
MOD BIT STRIP-IN
MOD BIT ROOF MEMBRANE
PER SPECIFICATIONS - TURN
FINISH LAYER UP AT PIPE
MIN 4"
MASTIC SEAL
PREFIN METAL
COUNTERFLASHING
PIPE SUPPORT - FIELD VERIFY
LOCATIONS
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
12" MIN
FASTENER
PREFIN METAL COUNTERFLASHING
ON METAL CLEAT
PREFAB CURB
LINE OF MECHANICAL EQUIP
1'
4"
6"
6"
WELDED SEAM
SINGLE-PLY ROOF MEMBRANE -
TURN UP AT CURB
SINGLE-PLY ROOF FLASHING
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
PIPE PENETRATION - FIELD
VERIFY LOCATIONS
SINGLE-PLY ROOF FLASHING
CONT SEALANT
STAINLESS STEEL CLAMPING
RING
WELDED SEAM
SINGLE-PLY ROOF MEMBRANE
4"
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
METAL FLASHING WHERE REQUIRED
BY MFR
CONT SEALANT
STAINLESS STEEL CLAMPING
RING
PIPE SUPPORT - FIELD VERIFY
LOCATIONS
NOTE:
ROOF DETAILS VARY BASED ON MFR'S STANDARD
DETAILING.
SINGLE-PLY ROOF FLASHING
WELDED SEAM
SINGLE-PLY ROOF MEMBRANE
METAL FLASHING WHERE REQUIRED
BY MFR
2X12 PT BLOCKING AS REQ'D
CONT METAL CAP
WITH COUNTER
FLASHING
CONT EDGE SEALANT
PT 2X WOOD NAILERS
ANCHORED TO DECK
MEMBRANE FLASHING COMPATIBLE WITH
EXISTING ROOFING MEMBRANE- ATTACH
PER MANUFACTURER'S
RECOMMENDATIONS
MEMBRANE ROOFING. X-CUT, PEEL
BACK FROM CUT OPENING AND
PROTECT FOR REINSTALLATION WHERE
APPLICABLE- TYP
ROOF INSULATION
ROOF DECK
DUCTING/PIPING/EQUIPMENT-REFER TO
STRUCTURAL, PLUMBING AND MECHANICAL
DETAIL DRAWINGS FOR ADDITIONAL
INFORMATION
METAL STRAP SECURED TO
CURB WHERE REQUIRED.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
Building #64
CRM JD/DB/EO5/
/2
9:
:0
A
M
TYPICAL ROOF DETAILS CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG 64-UNIT A
LAKE CITY VAMC
Lake City, FL
AE503
573A4-18-603
JAN. 29, 2024
3" = 1'-0"AE503
1 MOD BIT ROOFING - MECHANICAL CURB
3" = 1'-0"AE503
2 MOD BIT ROOFING - PIPE PENETRATION
3" = 1'-0"AE503
3 MOD BIT ROOFING PIPE SUPPORT
3" = 1'-0"AE503
5 TPO ROOFING - MECHANICAL CURB
3" = 1'-0"AE503
6 TPO ROOFING - PIPE PENETRATION
3" = 1'-0"AE503
7 TPO ROOFING - PIPE SUPPORT
3" = 1'-0"AE503
4 SLEEPER SUPPORT DETAIL
PROVIDE PIPING AND DUCTWORK SUPPORTS AS REQUIRED PER MECHANICAL
DESIGN. PROVIDE SLEEPER SUPPORT DETAIL AT EACH REQUIRED LOCATION.
SCALE:
0' 2" 4" 8" 1'
3" = 1' - 0"
| Sheets |
| AE302 - WALL SECTIONS AND DETAILS |
| AE503 - TYPICAL ROOF DETAILS |
| AE709 - SIGNAGE TYPE AND SCHEDULE |
File details come from the government source that posted it. Updated .