Final SOW Roof Repairs on Main Campus.docx
DOCX document 2 MB Posted
- Attached to
- Z2DA--Roof Repairs Main Campus
- Solicitation number
- 36C24825Q0922
About this file
This is a Statement of Work (SOW) for roof repairs at the James A. Haley Veterans Hospital in Tampa, Florida. The solicitation (36C24825Q0922) is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) with a NAICS code of 238160 (Roofing Contractors) and a small business size standard of $19.0 Million. The project involves comprehensive roof repairs across 19 different buildings and trailers, addressing specific issues such as loose flashing, membrane punctures, deteriorated sealants, gutter damages, and debris removal.
The solicitation requires contractors to provide all labor, materials, and equipment for flat and low-slope roof repairs, including cleaning, restoration, and certification. The period of performance is from the date of award through twelve months, with work to be performed during first and second shifts. Contractors must have at least five years of technical experience in roofing maintenance for healthcare, industrial, educational, or commercial facilities. The quote submission deadline is 7/8/2025 at 15:00 pm EST, with quotes to be emailed to Walida.MooreSaintil@va.gov. The evaluation will consider technical acceptability, past performance, and pricing, with the award going to the most advantageous response to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24825Q0922_3.docx | DOCX document | |
| 36C24825Q0922 Roof Repairs Amendment 1.docx | DOCX document | |
| LIMITATIONS ON SUBCONTRACTING.docx | DOCX document | |
| Vendor File Request Form VA10091.pdf | ||
| 36C24825Q0922.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) James A. Haley VA Healthcare System Flat Roof Cleaning, Restoration and Certification
I. INTRODUCTION:
The James A Haley Veterans Hospital (JAHVH) has identified leaks coming from the roof in multiple locations on multiple roofs. We will need to have these leaks addressed for repair. The Contractor shall furnish all labor, materials, travel, and equipment to provide Flat Roof and Low Slope Roof repairs on the following types of roofs tops (i.e. Protected Membrane Roofing - Cold Applied Membrane Waterproofing Systems/asphalt shingle, Terra Cotta) Other areas may need repairing of gutter systems, clearing of debris or general cleaning. Certification for the below identified locations to be covered in this Statement of Work. (SOW):
The following areas/sections have been identified as roof leaks and/or areas that need gutter repairs, cleared of debris or cleaned
· James A Haley Veterans Hospital (JAHVH) 13000 Bruce B Downs, Tampa, FL 33612
1. Building 1
a. Existing flashing at flow through scupper turned loose allowing water intrusion into building and roof system.
b. Low-cracked or separated sealant in pitch pan
c. Existing sealant along the caulk tray of the counterflashing is deteriorated.
2. Building 32
a. Existing pipe is rusted causing flashing to turn loose and allow water intrusion into roof system.
3. Building 38
a. Open lap in parapet wall flashings.
b. Low-cracked or separated sealant in pitch pan Allowing water intrusion into roof system.
c. Low-cracked or separated sealant in pitch pan Allowing water intrusion into roof system.
d. The existing pipe penetration flashing is deteriorated/improperly flashed and requires a new flashing.
e. Low-cracked or separated sealant in pitch pan Allowing water intrusion into roof system.
4. Building 30
a. Puncture(s) in roof membrane
b. utters are physically damaged.
c. Unsealed holes in stucco wall where equipment was removed allowing water intrusion.
d. Bolts at fixed wall ladder have turned loose causing sealant to open and allow water behind wall flashings.
5. Building 39
a. Existing pitch pans have sealant that has failed and allowing water intrusion and causing multiple leaks throughout facility.
b. Caulk Failure
6. Building 68
a. Flashing not adhered to substrate - loose flashing.
b. Puncture(s) in roof membrane (TPO-PVC)
c. Opening at sheet intersection at old failing repair.
7. Building 36
a. Gutters leaking at seams.
8. Building 42
a. Debris in gutter system
9. Building 24
a. Deteriorated panel due to exposure to the elements.
10. Building 77
a. Debris on roof
11. Trailer 73
a. Opening at sheet intersection - "T" joint (EPDM)
12. Trailer 75
a. Open void in coating at vent flashing .
13. Trailer 76
a. Deteriorated sealant at the base of the fan curb
14. Trailer 49
a. Existing sealant at exhaust vent base flashing starting to crack and tum loose.
15. Trailer 82
a. Debris on roof
16. Trailer 80
a. Metal siding damage caused by awning.
17. Trailer 81
a. Existing fasteners at coping cap are backing out and causing coping cap to unsecure.
b. Punctures in roof membrane caused by awning.
18. Trailer 83
a. Existing fasteners at coping cap are backing out and causing coping cap to unsecure.
The requirements above are hereafter referenced as “Roof Repairs on Main Campus.” The Contractor shall perform to the standards in this contract. This SOW requires the work to be performed by qualified Contract Professionals, and they will hereafter be referred to as “Contractors.” The Contractor shall provide written assurance of the competency of their personnel and a list of credentials of approved service personnel for each model the Contractor services at the James A Haley Veterans Hospital to the Contracting Officer and/or the COR within 10 days after contract award. Contractor shall make revisions to this documentation whenever service personnel are assigned or re-assigned to the James A Haley Veterans Hospital. The Contracting Officer or COR reserve the right to request authentication of factory training certificates or credentials from the Contractor at any time for any personnel who are servicing James A Haley Veterans Hospital equipment. The contractor will not require access to VA sensitive information, therefore the “Certification and Accreditation” (C&A) requirement in accordance with (IAW) VA Handbook 6500.6 Contract Security does not apply. All roof measurements/numbers are approximate and will be verified during the walk through by the contractor.
Definitions/Acronyms/Abbreviations:
a) Contracting Officer (CO) – VA official with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
b) Contracting Officer's Representative (COR) – VA official responsible for providing contract oversight and technical guidance to the Contracting Officer. Responsibilities include certification of invoices, placing orders for service, providing technical guidance, overseeing technical aspects of the contract. All administrative functions remain with the Contracting Officer.
c) Contractor –refers to both the prime Contractor and his/her employees, and any sub-contractor and their employees.
d) E.O. – Executive Order
e) FSE – Field service engineer
f) Fixed-price contract- is a type of contract that provides for a price that is not subject to any adjustment on the basis of the contractor's cost experience in performing the contract.
g) FAR, Federal Acquisition Regulation
h) NICET – National Institute for Certification in Engineering Technology
i) National Fire Protection Association (NFPA) - is a United States trade association, albeit with some international members, that creates and maintains private, copyrighted standards and codes for usage and adoption by local governments.
j) Out-Patient Clinic (OPC) - the part of our VA hospital system designed for the treatment of veteran’s outpatients with health problems who visit the VA for diagnosis or treatment out in their local community.
k) Preventative Maintenance (PM)
l) Performance Work Statement (PWS) - is a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes
m) Quality Assurance Surveillance Plan (QASP) – an organized written document used for quality assurance surveillance. The document contains specific methods for performing surveillance of the Contractors continuous performance.
n) Quality Control and Quality Control Plan (QCP) – Those actions taken by the Contractor to control the production of goods or services, so they will meet the requirements of the contract.
o) Solar Reflectance Index (SRI) -- The measure of constructed surface's ability to reflect solar heat, as shown by a small temperature rise
p) VAAR, Veteran Affairs Acquisition Regulation
q) Weekends, Holidays, Evenings and Nights Hours – WHEN
References:
a) E.O., 12902, 13514, 13693, 13834
b) FAR 23 & 36, Sustainable Acquisitions
c) VAAR 823, Sustainable Acquisition Policy
d) NFPA 10, Portable Fire Extinguisher
e) NFPA 30, Flammable Combustible liquids
f) NFPA 70E, Standard for Electrical Safety in the Workplace
g) NFPA 99, Health Care Facilities Code, Latest Edition
h) NFPA 101, Life Safety Code, Latest Edition
i) NFPA 203, Guide on Roof Coverings and Roof Deck Constructions
j) ASHRE, American Society of Heating, Refrigerating and Air-Conditioning Engineers Manual
k) ICC, International Building Code, Latest Edition
l) The Joint Commission Accreditation Manual for Hospitals, Latest Edition.
m) OSHA Standard 29 CFR Part 1910, Subparts: D, H, I, J, K, L, P & Z.
n) OSHA - Safety and Health Regulations for Construction Part 1926 Subpart E
II. SCOPE
The contractor shall provide all supervision, labor, material, and equipment necessary to perform the specified work requirements. The roofing contractor installing performing the repairs will also provide a one (1) year labor warranty for installation. The contractor will provide a detailed proposal outlining all steps needed to complete each part of the service, specific to this SOW and location. Roofing contractors will provide the COR with applicator certificates for the roofing product selected.
A. CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a Kickoff meeting or advised the contractor that a kickoff meeting is waived.
B. PERIOD OF PERFORMANCE
This shall be a firm-fixed price contract. Period of performance will be from the date of award through twelve (12) months.
C. CHANGES TO THE STATEMENT OF WORK (SOW)
Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a service folder with all other products of the services. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.
D. PERFORMANCE REQUIREMENTS:
1. Contractor shall provide the necessary personnel and equipment to meet or exceed required service. Contractor shall have the following responsibilities:
a) Have technical training and evident track records of working experience in Maintenance and Testing of Roofing and related components in healthcare, industrial, educational, or commercial facilities for a minimum of five (5) years.
b) Survey each Roof System Requirement, List building requirements with specific roof system restoration to be applied. (Alpha/numerically)
c) Determine/Provide Federal/State/EPA requirements for construction processes and secure all required permits to complete all requirements described in this SOW. Permits shall be the sole responsibility of the Contractor and copies will be maintained on site.
d) During the site walk if the contractor or COR annotate an area of concern, the membrane can be removed to inspect the roof deck. The new roof system will not be installed until the deck is properly inspected and/or repaired.
e) Survey each roof deck and determine all systems that will be isolated, removed and re-installed. Examples: HVAC, power lines, conduit, condensate lines, fencing, security cameras, poles/brackets, roof stacks, vents and exhaust fans. The contractor shall work with the COR to annotate each building requirement during the site-walk.
f) Seal all roof penetrations using applicable roof system applications. Examples: Rubber boots around stacks, sealants, membrane systems, flashing, etc., to ensure weather tight roofing envelope. Polyester fabric sheets shall be double or tripled up around penetrations, curbs, transitions, drains and equipment as required by roofing manufacture recommendations
g) Ensure all flashing is secured to the building and sealed into the new roof seamless system. Rubber membranes will be applied 2-3 inches past the flashing termination to provide a self-flashing seam along the wall or parapet designs, where building design allows the application.
h) Be responsible for delivery, off-loading and uncrating of all materials. All recyclable materials and debris shall be disposed of off-site. The contractor shall be responsible for inspecting shipments and replacing any damaged items during shipping. The COR shall also be made aware of issues and document discrepancies. If onsite recycling bins are available any materials will be coordinated with the COR prior to adding to any recycling bins or dumpsters.
i) Determine power requirements for site work, while maintaining power at facilities to support 24/7 operations. Normal electrical power will be provided onsite as will water for pressure washing. Government Furnished Material (GFM). Any additional electrical loads will require the contractor to secure generators for supporting any excess power usage. This will be coordinated with the COR during the site walk. Any temporary shut-down of equipment will be coordinated with the COR prior to shutting down any systems.
j) Provide safety plan for site specific roofing applications, Site Safety Officer, Weekly safety briefings, Ground Safety reviews daily--following OSHA-30 style self-inspections. The contractor shall follow Lock-Out Tag-Out procedures for all utility systems that require temporary shut-off. Site safety plans should be provided to the COR for review prior to Notice to Proceed (NTP). Safety plans should remain on site during all working hours for reference by the COR, site safety and employees.
k) Provide as needed for each building specific site layout: temporary fencing, orange cones, safety delineators, tarps to collect debris, Construction Warning Signs, Work Area Keep Out, Flaggers, etc.… The contractor should provide First-Aid kits and eye-wash bottles for employees. If the contractor uses generators or equipment requiring fuel, fire extinguishers will be readily available where the equipment is being utilized. Any forklifts used on site will have a contracted employee spot the movements around the construction site and wear applicable safety vests and provide overwatch for pedestrians and vehicles as the forklift is driven on Federal property.
l) Provide, possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and timely. Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910 and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable
m) Be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the performance of this contract that is caused by the Contractor’s fault or negligence.
n) The Contractor Safety Officer and contractor employees shall conduct daily site clean-up and ground safety walks should be conducted by the GC Superintendent on site. The sites have constant vehicle traffic 24-hrs a day. Debris left onsite will pose a safety hazard and shall be addressed immediately to ensure the safety of site personnel. The COR will work with Contractor to ensure safety is paramount.
o) Any materials brought onto Federal property must be approved and have SDS sheets on site for those products. The contractor will maintain a binder with SDS sheets on site at all times to verify what items are used and for safety reference. All contractor employees should have direct access to the binder to reference safety concerns. This binder is an inspection item if sites are visited by Environmental, OSHA or County inspectors.
p) Provide product details/specifications, warranties and owner’s manuals to the COR. The warranty will detail preventative maintenance requirements and checklist items required by the owner for the warranty period. The warranty will also explain the three (3) year manufacture representative clause for roof inspections. A copy of all materials will be provided to the COR; one (1) electronic copy and one (1) hard copy. Hard copy information shall be provided in a 3-ring binder format with tabs specific to the roofing systems, hatch safety rail, vents, walkway systems, product specifications and warranty type.
2. Contractor’s Minimum Requirement
a) The contractor shall provide a dedicated Account Manager to supervise all delivery of services per scope.
b) The contractor shall always be escorted by a VA employee during Maintenance at all facilities.
E. DELIVERABLES
The Contractor shall perform the services necessary to complete the tasks in accordance with the procedures described in a timely and professional manner, consistent with industry standards, at the location, place and time that the VA has set aside, and all in accordance with the SOW.
Contactor shall provide a copy of the inspection document used (field report) on the day of each performed inspection.
F. PERFORMANCE HOURS
Normal workdays are Monday through Friday, First Shift: 7:00am to 3:30pm /Second Shift: 3:00pm to 11:30pm to include weekends and Federal Holidays. Contractor shall perform all work during first & second shifts to include weekends when possible but shall perform any work that will affect patient care systems during times that will be the least disruptive (WHEN hours) when required by the COR. Contractor shall remove all parts and debris daily from the JAHVH Campuses work site, and contractor is responsible for a complete daily clean-up and debris removals until inspections are completed. Contractor shall submit a daily report of progress on the service to the COR or authorized personnel.
1. Government normal duty hours are from 0700-1630, Monday through Friday, excluding Federal holidays. There are ten Federal Holidays as follows:
| New Year’s Day | January 1 | ||
| Martin Luther King Day | 3rd Monday in January | ||
| President’s Day | 3rd Monday in February | ||
| Memorial Day | Last Monday in May | ||
| Juneteenth | June 19 | ||
| Independence Day | July 4 | ||
| Labor Day | 1st Monday in September | ||
| Columbus Day | 2nd Monday in October | ||
| Veterans Day | November 11 | ||
| Thanksgiving Day | Last Thursday in November | ||
| Christmas Day | December 25 |
2. If a holiday falls on Sunday, the following Monday will be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National Holiday by the U.S. Government agencies. Also, included would be any day specifically declared by the President of the United States of America as a National Holiday.
3. All work that is to be completed during WHEN hours will be done at no extra cost to the government.
image4.emf image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.emf image20.emf image21.emf image22.emf image23.emf image24.emf image25.emf image26.emf image27.emf image28.emf image29.emf image30.emf image31.emf image1.emf image2.emf image3.emf