RFIs for 36C248230136 - Project 675-22-806 Address Viera Roof - Responses.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Address Roof at Viera
- Solicitation number
- 36C24823R0136
About this file
This document contains responses to requests for information (RFIs) related to a solicitation from the Department of Veterans Affairs for roof coating services at the Viera Veterans Affairs Medical Center. Key details include that the solicitation is for a design-build project requiring the installation of a roof coating system compatible with existing granule surfaced and acrylic roof systems totaling approximately 150,000 square feet. The responses clarify that silicon fluid applied membranes would be considered, provide partial thermal images from 2021 as requested, specify a minimum 10-year warranty requirement, and confirm both prime contractor and key subcontractor experience and past performance may be submitted with the proposal.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI's for 36C248230136 - Project 675-22-806 Address Viera Roof | |
| RFIs | Responses |
| 1. The Magnitude of Construction on the SF 1442 states $1,000,000 to $2,000,000 but the pg 10 of the solicitation states Construction Cost Limitation (CCL) is between $2,000,000 and $5,000,000. Please advise. | The magnitude of construction is listed correctly. The Construction Cost Limitation is between $1,000,000.00 and $2,000,000.00 |
| 2. Would VA Consider a silicon fluid applied membrane in stead of the specified acrylic? | Yes, any proposed roof coating system shall be fully compatible with existing roofing systems. |
| 3. Please provide any thermal or IR scan of the roof, trapped moisture would require mitigation prior to installations. | Partial thermal images of Rotunda areas taken in 2021, see attachment 1. |
| 4. Has an infrared scan been performed on the current roof system? | Partial thermal images of Rotunda taken in 2021, see attachment 1. |
| 5. What warranty duration will the end user require? | Minimum 10-Year NDL warranty. Roof coating system shall be installed as per all manufacturer requirements. |
| 6. Phase One and Two reference Design Build Project and Design Concepts. Can you please clarify what the expectations are to “design”? | Project is Design-Build- Phase One is Design and Phase Two is Construction, refer to Program Guide PG-18-15, Volume C for document requirements. |
| 7. Will the contractor be able to use the key subcontractor’s experience and past performance? | Yes as long as it is both the prime and subcontractor working together on a similar project. |
| 8. Can the contractor submit the key subcontractor’s EMR with the proposal? | Yes as long as it is both the prime and subcontractor working together on a similar project. |