S02 - Attachment 3 - Price Matrix.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Address Roof at Viera
- Solicitation number
- 36C24823R0136
About this file
This document contains a price matrix attachment for a federal contract solicitation to install a roof coating system at an address in Viera, Florida. The contractor shall repair all roof penetrations and potential leak points and apply a new roof coating system that is fully compatible with the existing modified bitumen and acrylic roof systems. The work must be completed per industry and manufacturer standards as well as applicable VA and code guidelines. The existing roof is approximately 150,000 square feet. The price matrix lists the divisions of work and provides columns for labor costs, material costs, and total costs to be completed by the offeror. However, the costs in the price matrix are currently blank.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Base Offer Cost Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-
File details come from the government source that posted it. Updated .