S02 - Attachment 05 - Specialized Experience Form (3 Pages).pdf

PDF 134 KB Posted

Attached to
Install Garage Cameras at Lake Nona VAMC
Solicitation number
36C24823R0050
Issued by

About this file

This document contains a specialized experience form and information on a federal contract opportunity for installation services. The specialized experience form requests information on three past projects including contractor details, contract numbers, titles and locations, prime or subcontractor role, work descriptions, difficulties encountered, performance periods from start to completion dates, percentages completed, and pricing details. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to provide professional construction services to install parking garage cameras at the Lake Nona VA Medical Center in Orlando, Florida. Services include labor, materials, tools and equipment for the defined scope of work. The response deadline is not provided.

View the file

Other files

File Type Posted
S02 - Attachment 25 Physical Security Systems Technical Specifications 01-24-2023.pdf PDF
S02 - Attachment 26 - RFI Responses 36C24823R0050 RFIs for Install Parking Garage Cameras at Lake Nona.xlsx XLSX spreadsheet
S02 36C24823R0050 Install Garage Cameras at Lake Nona (Updated_1-24-23).pdf PDF
36C24823R0050 0002.pdf PDF
36C24823R0050 0001.pdf PDF
S02 - Attachment 06 - 675-23-108 Parking Garage Drawings.pdf PDF
S02 - Attachment 08 - 013323 SHOP DRAWINGS-PRODUCT DATA-SAMPLES.docx DOCX document
36C24823R0050.pdf PDF
S02 - Attachment 25 Physical Security Systems Technical Specifications 12-20-2022.pdf PDF
S02 - Attachment 19 - 280500 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY.docx DOCX document
S02 - Attachment 14 - 079200 JOINT SEALANTS.docx DOCX document
S02 - Attachment 01 - Wage Determination Orlando.txt TXT text file
S02 - Attachment 24 - 28052833 CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY.doc DOC document
S02 - Attachment 15 - 260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.docx DOCX document
S02 - Attachment 23 - 282300 Video Surveillance.doc DOC document
S02 - Attachment 09 - 013526 SAFETY REQUIREMENTS.docx DOCX document
S02 - Attachment 11 - 014500 QUALITY CONTROL.docx DOCX document
S02 - Attachment 20 - 280513 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.docx DOCX document
S02 - Attachment 10 - 014219 REFERENCE STANDARDS.docx DOCX document
S02 - Attachment 21 - 280526 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY.doc DOC document
S02 - Attachment 04 - EMR.docx DOCX document
S02 - Attachment 22 - 280800 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.docx DOCX document
S02 - Attachment 03 - Past Performance Questionnaire 36C24822R0050.pdf PDF
S02 - Attachment 18 - 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS.docx DOCX document
S02 - Attachment 16 - 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.docx DOCX document
S02 - Attachment 17 - 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.docx DOCX document
S02 - Attachment 02 - Price Matrix.xlsx XLSX spreadsheet
S02 - Attachment 07 - 01 00 00 General Requirements (Orlando DB).docx DOCX document
S02 - Attachment 12 - 019100 GENERAL COMMISSIONING REQUIREMENTS.docx DOCX document
S02 - Attachment 13 - 078400 FIRESTOPPING.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE FORM

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

File details come from the government source that posted it. Updated .