36C24823Q0543 0003_3.docx

DOCX document 331 KB Posted

Attached to
6350--PIV Readers T-62 and T-80 to T-83
Solicitation number
36C24823Q0543
Issued by

View the file

Other files

File Type Posted
36C24823Q0543 0003_5.pdf PDF
36C24823Q0543 0003_6.docx DOCX document
36C24823Q0543 0003_4.docx DOCX document
36C24823Q0543 0003_1.docx DOCX document
36C24823Q0543 0003.pdf PDF
36C24823Q0543 0002.pdf PDF
36C24823Q0543 0002_1.docx DOCX document
36C24823Q0543 0001_3.docx DOCX document
36C24823Q0543 REV A.pdf PDF
36C24823Q0543 0001_1.docx DOCX document
36C24823Q0543 0001.pdf PDF
36C24823Q0543.pdf PDF
36C24823Q0543_1.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
PIV Readers T-62 and T-80 to T-83

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
33637
SOLICITATION NUMBER*
36C24823Q0543
RESPONSE DATE/TIME/ZONE
04-07-2023 10:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
6350
NAICS CODE*
561621
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 8 (NCO 8)

8875 Hidden River Pkwy Suite 525 Tampa FL 33637

POINT OF CONTACT*

PLACE OF PERFORMANCE

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

Additional Question for 36C24823Q0543-PIV Readers T-62 and T-80 to T-83

1. Are the door release buttons at the reception desk part of this scope and do we need to replace/connect/add new if not there?

They will remain in place and operational

1. Will the ADO int. paddles be operational after this installation under valid card read only? If not are we to disconnect them or remove them if they are not to be used.

These should be operational after the installation

1. Are there any drawing/floor plans that can be provided for the trailers where the work is being conducted?

Yes and they will be provided

1. Can a 16 reader Ulta Istar panel be used in a central location with conduit running to all trailers in leu of 5 Istar G2 Edge panels?

In theory yes, however there would be additional site visits and work needed to ensure good conduit. The scope calls for an Edge panel in each so that’s the recommended route to go.

1. To clarify cards are not to be provided on this quote?

Correct, Cards are supplied by our PIV office.

1. Scope calls out PIV readers (Card only) and PIV Readers (card+pin) Can you provide details on which reader will be used in each location if not the same throughout?

The only card readers that we need for these areas are card only 200 bit encrypted PIV. They must be 200 bit.

1. Work hours show in the Scope M-F 7-5PM, will we be allowed to work while the clinics are operational with patents?

We will work to coordinate with management, so we don’t cause an issue or stoppage in that area.

1. Is there and ICRA Requirements for this installation and if so what Classification?

About the only requirement would be the use of dust barriers. There’s not asbestos in those areas. We just can’t have dust getting everywhere.

1. To clarify we will only be required to check in at security for a day pass for this installation? No additional clearances required correct?

These are not considered sensitive areas so you will not be required any additional clearances. Contractors will check in with the police to receive a contractor badge and then will be free to go to the work areas.

1. To Clarify VA will provide software from programing on an active work station correct?

Programming will be done from one of the computers in our office. We have access to the server and we will allow the technician to get on there.

1. Can we get pictures of door in T-82 labeled EEO, inside and out? We will also need a picture of where you are requesting us to install the panel in T-82.

Please look at the floor drawing for T-82. It is very similar to the other trailers. Also please keep in mind network cables will need to be run back to the closest switch for each controller.

Bldg T62

Bldg 80

Bldg T81

Bldg T82

Bldg T83

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation image1.png image2.png image3.png image4.png image5.png

File details come from the government source that posted it. Updated .