This sources sought announcement seeks interested Service-Disabled Veteran Owned Small Businesses for a renovation project to renovate clinical research laboratories at the Malcolm Randall Veterans Affairs Medical Center. The Department of Veterans Affairs, North Florida/South Georgia Veterans Health System will renovate clinical research laboratories and seeks firms with experience in bid build construction contracts to complete demolition and construction work. Interested firms should have experience performing projects such as demolition of existing structures, site preparation for construction, and furnishing labor and materials to renovate clinical laboratories according to provided drawings and specifications. Firms must submit past performance demonstrating relevant experience by April 29, 2021 to Amber Milton at Amber.Milton@va.gov. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 issued this sources sought to identify potential Service-Disabled Veteran Owned Small Business sources for a forthcoming request for proposal.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: 08/24/2021
Addendum No. 1
Renovate Clinical Research Labs
Gainesville VA
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract
Documents.
Receipt of this Addendum must be acknowledged on the Form of Proposal.
Questions or comments should be directed to Marco Lopez at the VA
This addendum consists of 3 Specification Sections and 6 Sheets
General
Specifications
1. 02 82 11 – Asbestos Abatement
a. Added of Asbestos Report
2. 02 8333.13 – Lead Remediation
a. Added Lead Report
3. 11 53 13 – Laboratory Fume Hoods
a. Added Spec Section
Drawings
4. A131 – Phase 3 – Note Plan and RCP
a. Note Plan: Revised interior elevation reference numbers.
5. A402 – Interior Elevations
a. Added gas lines to all lab island casework.
b. Revised heights of sink counters in Lab DB95T-1, Animal Surgery DB95M-1, Wet Room EB71A-1, and typical exam rooms.
6. A511 – Casework Sections & Details
a. Revised heights of sink counters.
7. PG331 – Phase 3 Medical Gas Sub-Basement New Work Plan
a. ½” Compressed Air, ½” Vacuum, and ½” Natural Gas added up to each bench in the Wet Lab DB95-1
8. PG431 – Phase 3 – Medical Gas Basement New Work Plan
a. ½” Compressed Air, ½” Vacuum, and ½” Natural Gas added to route through each bench of Wet Lab DB95-1.
b. Two Outlets for each gas shown on both sides of the bench (4 total outlets per gas at each bench).
c. Notes 8 and 9 updated to reflect drawing changes.
9. P802 – Plumbing Schematic Risers
a. Updated Detail 2 to reflect the additional piping and outlets added per drawings PG331 and PG431.
End of Addendum No. [1]
RENOVATE CLINICAL LABORATORIES, BUILDING 1 LABORATORY FUME HOODS
VAMC GAINESVILLE, FLORIDA
573-18-618
11 53 13 - 1
SECTION 11 53 13
LABORATORY FUME HOODS
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section includes chemical (general-purpose) hoods.
1.2 DEFINITIONS:
A. Chemical or General-Purpose Hoods
1. BYPASS HOOD: A hood that contains openings above the sash and below the airfoil, which redistribute the air to reduce fluctuations in face velocity and turbulence within the hood, when the sash is re-positioned.
1.3 RELATED WORK:
A. Section 22 11 00, FACILITY WATER DISTRIBUTION: Plumbing connections.
B. Section 22 13 00, FACILITY SANITARY AND VENT PIPING: Plumbing connections.
C. Section 22 62 00, VACUUM SYSTEMS FOR LABORATORY and HEALTHCARE FACILITIES:
Connections to gas and vacuum systems.
D. Section 22 63 00, GAS SYSTEMS FOR LABORATORY and HEALTHCARE FACILITIES:
Connections to gas and vacuum systems.
E. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
F. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION
EQUIPMENT: Integral blowers on hoods.
G. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Face velocity sensor controller.
H. Section 23 34 00, HVAC FANS.
I. Section 23 36 00, AIR TERMINAL UNITS: Airflow control valves.
J. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Electrical connections.
K. Section 26 27 26, WIRING DEVICES: Electrical devices.
L. Section 26 29 11, MOTOR CONTROLLERS: Motor controllers.
1.4 PERFORMANCE REQUIREMENTS:
A. Average Face Velocity for general chemical and ductless laboratory fume hoods: 0.51 m/s (100 fpm) with sash located at the average sash stop of 457 mm (18 inches).
B. Average face velocity for low velocity laboratory fume hoods can be as low as 0.3 m/s (60 fpm) with sash located at the average low velocity hood sash stop height of 304 to 457 mm (12 to 18 inches).
C. Containment: Furnish and install laboratory fume hoods that are tested according to ASHRAE
110 at a release rate of 4.0 L/min (0.14 CFM).
573-18-618
11 53 13 - 2
1. Face Velocity Variation: Allowable variation threshold is not more than +-10% of average face velocity.
2. Sash Position:
a. For horizontal-sash units, test with maximum opening on side, with maximum opening in the center, and with opening at each side equal to half of maximum opening.
b. For combination-sash units, test with sash fully raised, with maximum opening on side, with maximum opening in the center, and with opening at each side equal to half of maximum opening.
c. For vertical sash units, test with sash fully open, and at typical sash stop height of 457 mm (18 inches).
3. As-Manufactured (AM) Rating: AM 0.05 mg/L (0.05 ppm).
4. As-Installed (AI) Rating: AI 0.05 mg/L (0.05 ppm).
D. Average Static-Pressure Loss: Not more than 93 Pa (3/8-inch wc) at 0.51 m/s (100 fpm) face velocity when tested according to SEFA 1.2.
1.5 QUALITY ASSURANCE:
A. Manufacturer’s Qualifications: Manufacturer with a minimum of three (3) years’ experience in providing items of types specified. Submit manufacturer’s qualifications.
B. Installer’s Qualifications: Installers who have with a minimum of three (3) years’ experience in the installation of units required for this project. Submit installer qualifications.
C. Digital electronics devices, software and systems to be the current generation of technology that has a proven satisfactory service record of at least three (3) years.
1.6 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Manufacturer's Literature and Data: Include the following:
1. Illustrations and descriptions of laboratory fume hoods and factory-installed devices for fume hoods.
2. Catalog or model numbers for each item incorporated into the work.
3. Static-pressure losses and exhaust volumes for fume hoods.
4. Results of testing according to ASHRAE 110.
C. Shop Drawings: Show details of fabrication, installation, adjoining construction, coordination with mechanical and electrical work, anchorage, and other work required for complete installation.
D. Field Test Reports: Indicate dates and times of tests and certify test results.
E. Factory Test Reports: Provide manufacturer’s QC checklist or other reports that indicate comprehensive factory testing has been performed, and the results of these tests have been certified.
573-18-618
11 53 13 - 3
F. Operating Instructions: Comply with requirements in Section 01 00 00, GENERAL
REQUIREMENTS.
G. Manufacturer’s qualifications.
H. Installer’s qualifications.
I. Manufacturer’s warranty.
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of Construction”.
B. Manufacturer Warranty: Manufacturer shall warranty their laboratory fume hoods for a minimum of two (2) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.
1.8 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American National Standards Institute / American Society of Heating, Refrigerating and Air-
Conditioning Engineers (ANSI/ASHRAE):
110-1995 ....................................Method of Testing Performance of Laboratory Fume Hoods
C. Scientific Equipment and Furniture Association (SEFA):
1-05 ............................................Recommended Practices for Laboratory Fume Hoods
2-10 ............................................Recommended Practices for Installation
D. National Fire Protection Association (NFPA):
45-2011 ......................................Standard on Fire Protection for Laboratories using Chemicals
PART 2 – PRODUCTS
2.1 FUME HOODS, GENERAL:
A. Furnish and install laboratory fume hoods that comply with recommendations in SEFA 1.
B. Factory install service fixtures and electrical devices as shown on the construction documents.
C. Ductwork: All ductwork shall be stainless steel. Refer to Section 23 31 00, HVAC DUCTS and
CASINGS.
D. Face Velocity Controller (VAV Fume hoods): Provide fume hood exhaust controllers to control a damper in the hood discharge to maintain the velocity through the open face of the hood regardless of sash position. Refer to Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM
FOR HVAC.
E. Gas, Air, and Vacuum Service Fixtures: Remote controlled; with valve identified by index button;
with serrated tip outlets; color-code valves and outlets. Refer to Section 22 62 00, VACUUM
SYSTEMS FOR LABORATORY and HEALTHCARE FACILITIES and Section 22 63 00, GAS
SYSTEMS FOR LABORATORY and HEALTHCARE FACILITIES.
F. Water Service Fixtures: Remote controlled, with integral vacuum breaker and as follows:
1. Turret 152.4 mm (6 inch) swivel gooseneck outlet.
573-18-618
11 53 13 - 4
2. Epoxy-coated brass.
3. Refer to Section 22 11 00 FACILITY WATER DISTRIBUTION.
G. Service-Fixture Color-Coding: Color-code service fixtures as follows:
Service Color Water Dark Green
Air Orange
Gas Dark Blue
Vacuum Yellow
H. Lighting Fixtures:
1. Vapor proof Fixtures: 120-V LED .
2. Explosion-Proof Fixtures: 120-V LED. Fixtures shall be shipped loose for field wiring and installation.
I. Receptacles and Switches: Include junction box and cover plate. Refer to Section 26 27 26, WIRING DEVICES.
1. Duplex Receptacles: 120 V, single phase, 20 A, 2-pole, 3-wire.
2. Single Receptacles: 250 V, single phase, 20 A, 2-pole, 3-wire.
3. Ground Fault Interrupter (GFI) Duplex Receptacles: Integral unit with 2-pole, 3-wire, 120-V, 20-A receptacle.
4. Lighting Fixture Switches: Toggle, single pole, 120-277 V, 20 A.
5. Switches with Receptacles: Single-pole switch to control lighting fixtures and 120-V, 15-A, 2-pole, 3-wire single receptacle.
6. Switches with Neon Pilots: Single-pole toggle turns on pilot light, which indicates switch and load are "on"; 120 V, 15 A.
7. Motor Controller Switches: Double-pole switch with pilot light and thermal-overload protection. Refer to Section 26 29 11, MOTOR CONTROLLERS.
J. Airflow Monitor: With audible alarm and warning light. Provide digital type unit with alarm contacts to allow connection to the DDC control system to facilitate remote monitoring. Refer to Section 23
09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
K. Airflow Control Valve (VAV Hoods): Refer to Section 23 36 00, AIR TERMINAL UNITS.
2.2 BYPASS FUME HOODS:
A. Airflow Systems: Bypass. Hoods served by variable air volume exhaust systems to include a, factory install bypass block to restrict the bypass of air and allow reduction of the exhaust air volume as the sash is lowered while maintaining a constant face velocity.
B. Liners: Stainless Steel Type 304, No. 4 finish.
C. Work Surfaces: Epoxy resin.
573-18-618
11 53 13 - 5
D. Sinks: Epoxy resin.
1. Cup Sinks: Equip with Diametre Nominal (DN) 40 (Nominal Pipe Size (NPS) 1-1/2 inch) tailpiece, sink stopper, and P trap.
2. Laboratory Sinks: Equip with DN 40 (NPS 1-1/2 inch) sink outlet, sink stopper, beehive overflow, and P trap.
E. Lighting Fixtures: Vapor proof.
F. Blowers: Remote; sized to create exhaust air volume that produces average face velocity indicated with sashes fully open. Blowers to be constructed with chemical-resistant coating.
Refer to Section 23 34 00, HVAC FANS.
G. Sashes: Vertical type; fully tempered safety glass.
1. Accessories: Sash stops, commonly installed 457 mm (18 inches).
H. Bases: Cabinet. Refer to Section 12 31 00, MANUFACTURED METAL CASEWORK
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Install laboratory fume hoods to comply with SEFA 2.
B. Locate unit away from fans, heating and air conditioning registers, laboratory hoods, high traffic areas and doors that could interfere with airflow patterns.
3.2 TESTS:
A. Field test installed laboratory fume hoods according to ASHRAE 110 to verify compliance with performance requirements for containment.
1. For units that fail testing, make adjustments and corrections to installation, or replace fume hoods, and repeat tests until fume hoods comply with requirements.
3.3 PROTECTING AND CLEANING:
A. Protect equipment from dirt, water, and chemical or mechanical injury during the remainder of the construction period.
B. At the completion of work, clean equipment as required to prepare for use.
3.4 INSTRUCTIONS:
A. Instruct personnel and transmit operating instructions in accordance with requirements in Section
01 00 00, GENERAL REQUIREMENTS. Training must be provided by Manufacturer or Installer.
- - - E N D - - -
Limited Asbestos Survey Report Malcolm Randall VA Hospital
Gainesville, Alachua County, Florida
August 20, 2020
Terracon Project No. EQ197137
Prepared for:
RDC/John Poe Architects
Dayton, Ohio
Prepared by:
Terracon Consultants, Inc.
Jacksonville, Florida
Terracon Consultants, Inc. 9655 F lor ida Mining Boulevard West Suite 509 Jacksonvi l le, F lor ida 32257
P (904) 900-6494 F (904) 268-5255 ter racon.com
August 20, 2020
116 E. 3rd Street
Dayton, Ohio 45402-2130
Attn: Ms. Pamela Rigling
VA Contracting Manager
Cell: (937) 626-8925
Email: prigling@rdcjohnpoe.com
RE: Report of Limited Asbestos Inspection
Sub-Basement area
Malcolm Randall VA Hospital
Gainesville, Florida
Terracon Project EQ197137
Dear Ms. Rigling:
Terracon Consultants, Inc. is pleased to submit the attached report to RDC/John Poe
Architects (client). The purpose of this report is to present the results of an asbestos survey of the sub-basement at the above-referenced location performed on August 12, 2020.
Asbestos was identified in eight samples collected from four materials as part of this survey.
The limited asbestos survey was conducted in general accordance with our approved change order dated August 6, 2020.
Terracon Consultants, Inc. appreciates the opportunity to provide this service to the client. If you have any questions regarding this report, please initially contact the inspector, Peter Thompson at
904-900-6468.
Sincerely, Asbestos Business License No. ZA0000337
Peter Thompson Tom Holley CHMM, CIH, CSP
Senior Staff Scientist Florida Licensed Asbestos Consultant
AHERA Certified Building Inspector License No. AX75
Certificate # 200741-8083 Authorized Project Reviewer
Tom Holley CHMM, CIH, CSP Florida Licensd Asbestos Consultant
Peter Thompson Senior Staff Scientist
PETERTHOMPSON4406311EQ197137CREATED2020/08
/20RDCJOHNPOEARCHITECTSPETERTHOMPSON440631
1EQ197137CREATED2020/08/20RDCJOHNPOEARCHIT
ECTSPETERTHOMPSON4406311EQ197137CREATED202
0/08/20RDCJOHNPOEARCHITECTSPETERTHOMPSON44
06311EQ197137CREATED2020/08/20RDCJOHNPOEAR
CHITECTSPETERTHOMPSON4406311EQ197137CREATE
D2020/08/20RDCJOHNPOEARCHITECTSPETERTHOMPS
Authorized Project Reviewer License AX75AHERA Accredited Building Inspector
Certificate # 200741-8083 mailto:prigling@rdcjohnpoe.com
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
LIST OF APPENDICES
APPENDIX A ASBESTOS LABORATORY ANALYTICAL DATA
APPENDIX B ASBESTOS SURVEY SAMPLE SUMMARY
APPENDIX C CERTIFICATIONS, ACCREDITATIONS, AND LICENSES
Sub-Basement, Malcom Randall VAMC ■ Gainesville, Florida August 20, 2020 ■ Terracon Project EQ197137
Responsive ■ Resourceful ■ Reliable 1
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey of the sub-basement at the
Malcolm Randall Medical Center located in Gainesville, Florida.
The survey was conducted on August 12, 2020, by an AHERA accredited asbestos inspector in general accordance with our approved change order dated August 6, 2020. The inspection was limited to areas expected to be disturbed during forthcoming renovations of the Clinical
Laboratories on the floor above.
Terracon was accompanied during part of the survey by project engineers Michael Scot and Chris
Van Meter who are familiar with the areas likely to be disturbed. Pipes ducts and conduits in the designated area as indicated by Mr. Scott and Mr. Van Meter were surveyed and homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented.
Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids or in other concealed areas. Suspect
ACM samples were collected in general accordance with the sampling protocols outlined in United
States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act
(AHERA) 40 CFR 763.86. Samples were delivered to an accredited laboratory for analysis by
Polarized Light Microscopy (PLM).
1.1 Reliance
This report is for the exclusive use of the client for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and the client.
Reliance on this report by the client and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report, and the Agreement for Services
(AFS). The limitation of liability defined in the AFS is the aggregate limit of Terracon’s liability to the client.
2.0 BUILDING DESCRIPTION
The structure is a Veterans Administration Medical Center where renovations to the Clinical
Laboratories area are proposed. The sub-basement is the lowest level of the building and is below street level. Pipes, ducts, and conduits servicing the medical center are located in this area.
3.0 FIELD ACTIVITIES
The survey was conducted by Terracon AHERA accredited asbestos inspector Mr. Peter
Thompson. Copies of the laboratory accreditation, Mr. Thompson’s asbestos inspector certificate and other applicable licenses are attached as Appendix C. The survey was conducted in general accordance with the sample collection protocols established in USEPA AHERA 40 CFR 763.86.
A summary of survey activities is provided below.
Responsive ■ Resourceful ■ Reliable 2
3.1 Visual Assessment
Our survey activities began with visual observations of the sub-basement accompanied by two project engineers familiar with the project to identify homogeneous areas of suspect ACM. A homogeneous area consists of building materials that appear similar throughout in terms of color, texture, and date of application. Interior assessment was conducted throughout visually accessible areas of the structure. Building materials identified as glass, wood, metal or rubber were not considered suspect ACM. Concrete was not expected to be disturbed and was not sampled.
3.2 Physical Assessment
A physical assessment of each homogeneous area (HA) of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from selected locations in each homogeneous area within each facility. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker. The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
3.4 Sample Analysis
Bulk asbestos samples were submitted under chain of custody to Moody Labs (Moody) of
Farmers Branch, Texas for analysis by polarized light microscopy with dispersion staining techniques (PLM) per USEPA methodology EPA 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. Moody is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation No. 102056-0.
The laboratory was instructed to analyze all samples.
4.0 REGULATORY OVERVIEW
The National Emissions Standard for Hazardous Air Pollutants (NESHAP) (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure alone. Friable ACM is typically considered regulated asbestos containing material
(RACM).
The Florida Department of Environmental Protection (FDEP) incorporates the Asbestos NESHAP as reference in Rule 62-204.800 of the Florida Administrative Code. The owner or operator must
Responsive ■ Resourceful ■ Reliable 3 provide FDEP with written notification at least 10 working days prior to the commencement of asbestos abatement activities that will disturb asbestos-containing materials in total amounts greater than 160 square feet, 260 linear feet or 35 cubic feet.
The asbestos NESHAP regulation classifies ACM as either friable, Category I non-friable ACM or
Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category
II non-friable ACM that has become friable, will be, or has been, subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of renovation or demolition activities. Category I non-friable ACMs are defined as asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos.
Category II non-friable ACM are all other non-friable materials other than Category I non-friable
ACM that contain more than 1% asbestos. Category II non-friable ACM generally includes but is not limited to cementitious material such as: cement pipes, cement siding, cement panels, glazing, mortar, and grouts.
The United States Occupational Safety and Health Administration (OSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The OSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as OSHA’s asbestos permissible exposure limits (PELs).
The OSHA standard classifies construction and maintenance activities which could disturb materials which contain asbestos, and specifies work practices, training and other controls that employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Twenty samples were obtained from eight identified homogeneous areas of suspect ACM associated with the work area.
Asbestos was identified in eight samples collected from four materials as part of this survey.
One of the identified materials was a mudded fitting in which black mastic was identified. After ruling out cross-contamination from the sampling activities it is possible that the mastic was either unintentionally mixed into the mud at the time of application or is contaminating the mud as falling debris from the mastic coating on the deck directly above the mud fittings. Consequently, mud fittings which may be disturbed in this specific area should be assumed to contain Category I non-friable asbestos material.
The black mastic on the underside of the deck, on paper wrapped pipe insulation, on insulated and uninsulated pipe fittings is a Category I non-friable material regulated asbestos containing material (RACM). Additionally, any other black mastic encountered in the work area on any surface should be assumed to be asbestos containing. These materials should be removed prior to disturbance by a State of Florida licensed asbestos abatement contractor in accordance with
Responsive ■ Resourceful ■ Reliable 4 a project design prepared by a licensed, accredited or certified Project Designer. Contractors who disturb these materials must be in compliance with OSHA regulations as contained in 29 CFR
1926.1101.
Materials not included in this survey may be revealed during the course of demolition activities.
These materials should be assumed to be asbestos-containing and should be sampled and submitted for laboratory analysis in order to determine their asbestos content before any further renovation or demolition activities that may disturb them.
6.0 LIMITATIONS/GENERAL COMMENTS
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. If other suspect materials or conditions are encountered, please contact
Terracon for proper evaluation and interpretations.
The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date.
This report has been prepared on behalf of and exclusively for use by the client for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
APPENDIX A
LABORATORY ANALYSIS
PLM Summary Report
Client :
Project :
Project # :
Identification :
Test Method :
Terracon - Jacksonville
1601 S.W. Archer Rd., Gainesville, Florida
EQ197137
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 8/14/2020, twenty (20) bulk material samples were submitted by Pete Thompson of Terracon - Jacksonville for asbestos analysis by PLM/DS. The
PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
20B-08347
08/12/2020
08/14/2020
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
1-1 Mastic (Black), Deck A18-B19 5% Chrysotile - Black Mastic
1-2 Mastic (Black), Deck A18-B19 5% Chrysotile - Black Mastic
2-3 Mudded Fitting, A19-B20 None Detected - Fiber Insulation
None Detected - Thermal Insulation
2-4 Mudded Fitting, A19-B20 None Detected - Fiber Insulation
None Detected - Thermal Insulation
5% Chrysotile - Black Mastic
2-5 Mudded Fitting, A19-B20 None Detected - Fiber Insulation
None Detected - Thermal Insulation
3-6 Foam Glass Adhesive (Black), K3-L2 None Detected - Glass Foam
3-7 Foam Glass Adhesive (Black), K3-L2 None Detected - Glass Foam
4-8 Mastic (Black), K3-L2 None Detected - Paper / Foil Wrap
5% Chrysotile - Black Mastic
4-9 Mastic (Black), K3-L2 None Detected - Paper / Foil Wrap
5% Chrysotile - Black Mastic
5-10 Mudded Fitting, Large Pipe C9-D8 None Detected - Thermal Insulation
5-11 Mudded Fitting, Large Pipe C9-D8 None Detected - Thermal Insulation
5-12 Mudded Fitting, Large Pipe C9-D8 None Detected - Thermal Insulation
6-13 Cementitious Pipe Insulation, C9-D8 None Detected - Pipe Insulation
None Detected - Pipe Insulation
6-14 Cementitious Pipe Insulation, C9-D8 None Detected - Pipe Insulation
None Detected - Pipe Insulation
6-15 Cementitious Pipe Insulation, C9-D8 None Detected - Pipe Insulation
None Detected - Pipe Insulation
7-16 Foam Glass Adhesive (White), Chiller Pipe A8-B7 None Detected - Glass Foam
None Detected - White Mastic
Project :
Project # :
Identification :
Test Method :
Terracon - Jacksonville
1601 S.W. Archer Rd., Gainesville, Florida
EQ197137
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 8/14/2020, twenty (20) bulk material samples were submitted by Pete Thompson of Terracon - Jacksonville for asbestos analysis by PLM/DS. The
PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
20B-08347
08/12/2020
08/14/2020
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
7-17 Foam Glass Adhesive (White), Chiller Pipe A8-B7 None Detected - Glass Foam
None Detected - White Mastic
8-18 Mastic Coating (Black), Pipes, Fitting C10-B11, C11-B12 15% Chrysotile - Black Mastic
8-19 Mastic Coating (Black), Pipes, Fitting C10-B11, C11-B12 15% Chrysotile - Black Mastic
None Detected - Tan Mastic
8-20 Mastic Coating (Black), Pipes, Fitting C10-B11, C11-B12 15% Chrysotile - Black Mastic
Debra O'SullivanAnalyst(s):
Lab Director : Bruce Crabb Approved Signatory :
Thank you for choosing Moody Labs
Lab Manager : Heather Lopez Approved Signatory :
These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. The test report shall not be reproduced, except in full, without written approval of the laboratory. The results relate only to the items tested. These test results do not imply endorsement by NVLAP or any agency of the U.S.
Government. Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056-0.
PLM Detail Report
Project # : EQ197137
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
Terracon - Jacksonville
1601 S.W. Archer Rd., Gainesville, Florida
Lab Job No. :
Report Date :
20B-08347
08/14/2020
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Chrysotile1-1 Black Mastic (Black) 100% 08/145% DO
Tar Binders1-1 Black Mastic (Black) 100% 08/1495% DO
Chrysotile1-2 Black Mastic (Black) 100% 08/145% DO
Tar Binders1-2 Black Mastic (Black) 100% 08/1495% DO
Mineral Wool Fibers2-3 Fiber Insulation (Yellow) 10% 08/1495% DO
Resin Binders2-3 Fiber Insulation (Yellow) 10% 08/145% DO
Mineral Wool Fibers2-3 Thermal Insulation (Light Grey) 90% 08/1420% DO
Binders / Fillers2-3 Thermal Insulation (Light Grey) 90% 08/1480% DO
Mineral Wool Fibers2-4 Fiber Insulation (Yellow) 15% 08/1495% DO
Resin Binders2-4 Fiber Insulation (Yellow) 15% 08/145% DO
Mineral Wool Fibers2-4 Thermal Insulation (Light Grey) 84% 08/1420% DO
Binders / Fillers2-4 Thermal Insulation (Light Grey) 84% 08/1480% DO
Chrysotile2-4 Black Mastic (Black) 1% 08/145% DO
Tar Binders2-4 Black Mastic (Black) 1% 08/1495% DO
Mineral Wool Fibers2-5 Fiber Insulation (Yellow) 10% 08/1495% DO
Resin Binders2-5 Fiber Insulation (Yellow) 10% 08/145% DO
Mineral Wool Fibers2-5 Thermal Insulation (Light Grey) 90% 08/1420% DO
Binders / Fillers2-5 Thermal Insulation (Light Grey) 90% 08/1480% DO
Glass Foam3-6 Glass Foam (Black) 100% 08/1485% DO
Tar Binders3-6 Glass Foam (Black) 100% 08/1415% DO
Glass Foam3-7 Glass Foam (Black) 100% 08/1485% DO
Tar Binders3-7 Glass Foam (Black) 100% 08/1415% DO
Cellulose Fibers4-8 Paper / Foil Wrap (Tan / Silver) 75% 08/1460% DO
Glass Wool Fibers4-8 Paper / Foil Wrap (Tan / Silver) 75% 08/1420% DO
Metal Foil4-8 Paper / Foil Wrap (Tan / Silver) 75% 08/1420% DO
Chrysotile4-8 Black Mastic (Black) 25% 08/145% DO
Tar Binders4-8 Black Mastic (Black) 25% 08/1495% DO
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
Terracon - Jacksonville
1601 S.W. Archer Rd., Gainesville, Florida
Lab Job No. :
Report Date :
20B-08347
08/14/2020
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Cellulose Fibers4-9 Paper / Foil Wrap (Tan / Silver) 65% 08/1460% DO
Glass Wool Fibers4-9 Paper / Foil Wrap (Tan / Silver) 65% 08/1420% DO
Metal Foil4-9 Paper / Foil Wrap (Tan / Silver) 65% 08/1420% DO
Chrysotile4-9 Black Mastic (Black) 35% 08/145% DO
Tar Binders4-9 Black Mastic (Black) 35% 08/1495% DO
Mineral Wool Fibers5-10 Thermal Insulation (Light Grey) 100% 08/1420% DO
Binders / Fillers5-10 Thermal Insulation (Light Grey) 100% 08/1480% DO
Mineral Wool Fibers5-11 Thermal Insulation (Light Grey) 100% 08/1420% DO
Binders / Fillers5-11 Thermal Insulation (Light Grey) 100% 08/1480% DO
Mineral Wool Fibers5-12 Thermal Insulation (Light Grey) 100% 08/1420% DO
Binders / Fillers5-12 Thermal Insulation (Light Grey) 100% 08/1480% DO
Vermiculite6-13 Pipe Insulation (White) 50% 08/1450% DO
Binders / Fillers6-13 Pipe Insulation (White) 50% 08/1450% DO
Vermiculite6-13 Pipe Insulation (Green) 50% 08/1450% DO
Binders / Fillers6-13 Pipe Insulation (Green) 50% 08/1450% DO
Vermiculite6-14 Pipe Insulation (White) 50% 08/1450% DO
Binders / Fillers6-14 Pipe Insulation (White) 50% 08/1450% DO
Vermiculite6-14 Pipe Insulation (Green) 50% 08/1450% DO
Binders / Fillers6-14 Pipe Insulation (Green) 50% 08/1450% DO
Vermiculite6-15 Pipe Insulation (White) 50% 08/1450% DO
Binders / Fillers6-15 Pipe Insulation (White) 50% 08/1450% DO
Vermiculite6-15 Pipe Insulation (Green) 50% 08/1450% DO
Binders / Fillers6-15 Pipe Insulation (Green) 50% 08/1450% DO
Glass Foam7-16 Glass Foam (Black) 95% 08/14100% DO
Wollastonite7-16 White Mastic (White) 5% 08/145% DO
Binders / Fillers7-16 White Mastic (White) 5% 08/1495% DO
Glass Foam7-17 Glass Foam (Black) 98% 08/14100% DO
Wollastonite7-17 White Mastic (White) 2% 08/145% DO
Binders / Fillers7-17 White Mastic (White) 2% 08/1495% DO
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
Terracon - Jacksonville
1601 S.W. Archer Rd., Gainesville, Florida
Lab Job No. :
Report Date :
20B-08347
08/14/2020
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Chrysotile8-18 Black Mastic (Black) 100% 08/1415% DO
Tar Binders8-18 Black Mastic (Black) 100% 08/1485% DO
Chrysotile8-19 Black Mastic (Black) 95% 08/1415% DO
Tar Binders8-19 Black Mastic (Black) 95% 08/1485% DO
Calcite8-19 Tan Mastic (Tan) 5% 08/1440% DO
Glue Binders8-19 Tan Mastic (Tan) 5% 08/1460% DO
Chrysotile8-20 Black Mastic (Black) 100% 08/1415% DO
Tar Binders8-20 Black Mastic (Black) 100% 08/1485% DO
APPENDIX B
ASBESTOS SURVEY SAMPLE SUMMARY
August 19, 2020 ■ Terracon Project EQ197137
HA Material Locations Friable Asbestos Content Approx.
Quantity
1 Black mastic Deck A18-B19 N Chrysotile 5% NQ
2* Mudded fitting A19-B20 Y Chrysotile 5% NQ
3 Black foam glass adhesive K3- L2 N NAD NQ
4 Black mastic K3 - L2 N Chrysotile 5% NQ
5 Mudded fitting Large pipe C9-D8 Y NAD NQ
6 Cementitious pipe insulation C9-D8 Y NAD NQ
7 White foam glass adhesive Chiller pipe A8-B7 N NAD NQ
8 Black mastic coating Pipes, fittings C10-B11, C11-B12 N Chrysotile 15% NQ
*Contaminated with HA1
NAD – No asbestos detected
APPENDIX C
CERTIFICATIONS, LICENSES,
LABORATORY ACCREDITATIONS
U n it e d
S ta te s D e p a rt m e n t o f C o m m e rc e
N a ti o n a l In s ti tu te o f
S ta n d a rd s a n d
T e c h n o lo g y
C e rt if ic a te o f
A c c re d it a ti o n t o
I S
O /I
E C
:2
N V
L A
P L
A B
C O
D E
-0
S te v e
M o o d y M ic ro
S er v ic es L
L C
F ar m er s B ra n ch
T
X is a c c re d it e d b y t h e N a ti o n a l V o lu n ta ry L a b o ra to ry
A c c re d it a ti o n P ro g ra m f o r s p e c if ic s e rv ic e s lis te d o n t h e S c o p e o f A c c re d it a ti o n fo r:
A sb es to s F ib er
A n a ly si s
-0
-0 t h ro u g h
-0
-3
E ff e c ti v e D a te s F o r th e N a ti o n a l V o lu n ta ry L a b o ra to ry
A c c re d it a ti o n P ro g ra m
T h is l a b o ra to ry i s a c c re d it e d i n a c c o rd a n c e w it h t h e r e c o g n iz e d I n te rn a ti o n a l S ta n d a rd
I S
O /I E
C
:2
T h is a c c re d it a ti o n d e m o n s tr a te s t e c h n ic a l c o m p e te n c e f o r a d e fi n e d s c o p e a n d t h e o p e ra ti o n o f a l a b o ra to ry q u a lit y m a n a g e m e n t s y s te m re fe r to j o in t
IS
O -I
L A
C -I
A F
C o m m u n iq u e d a te d J a n u a ry
National Voluntary Laboratory Accreditation Program
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
For the National Voluntary Laboratory Accreditation Program
Effective 2018-07-01 through 2019-06-30
Steve Moody Micro Services, LLC 2051 Valley View Lane
Farmers Branch, TX 75234-8956
Mr. Bruce Crabb
Phone: 972-241-8460 Fax: 972-241-8461
Email: bruce.crabb@moodylabs.com http://www.moodylabs.com
ASBESTOS FIBER ANALYSIS NVLAP LAB CODE 102056-0
Bulk Asbestos Analysis
Code Description 18/A01 EPA -- 40 CFR Appendix E to Subpart E of Part 763, Interim Method of the Determination of
Asbestos in Bulk Insulation Samples
18/A03 EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials
Airborne Asbestos Analysis
Code Description 18/A02 U.S. EPA's "Interim Transmission Electron Microscopy Analytical Methods-Mandatory and
Nonmandatory-and Mandatory Section to Determine Completion of Response Actions" as found in
40 CFR, Part 763, Subpart E, Appendix A.
H al se y
Be sh ea rs
, S ec re ta ry Ro n D eS an tis , G ov er no r
ST
A
TE
O
F
FL
O
RI
D A
D
EP
A
RT
M
EN
T O
F
BU
SI
N
ES
S
A N
D P
RO
FE
SS
IO
N A
L
RE
G U
LA
TI
O N
A
SB
ES
TO
S
LI
CE
N
SI
N
G U
N
IT
TH
E
A
SB
ES
TO
S
BU
SI
N
ES
S
O
RG
A N
IZ
A
TI
O
N H
ER
EI
N
IS
L
IC
EN
SE
D U
N D
ER
T
H E
PR
O
V
IS
IO
N
S O
F
CH
A
PT
ER
, F
LO
RI
D A
S
TA
TU
TE
S
TE
RR
A
CO
N C
O N
SU
LT
A N
TS
IN
C
D o no t a lte r t hi s do cu m en t i n an y fo rm
M
IC
H A
EL
W
S
CH
RU
M
LI
CE
N
SE
N U
M
BE
R:
Z
A
EX
PI
RA
TI
O
N D
A
TE
N
O V
EM
BE
R
, 2
Th is is yo ur li ce ns e.
It is u nl aw fu l f or a ny on e ot he r t ha n th e lic en se e to u se th is do cu m en t.
L
EE
R O
A D
W
IN
TE
R
PA
RK
F
L
A lw ay s ve rif y lic en se s on lin e at M yF lo rid aL ic en se .c om https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=f5e132a418a4b63dda1238a83a25e6c0
JO
N
A
TH
A N
Z A
CH
EM
, S
EC
RE
TA
RY
RI
CK
S
CO
TT
, G O
V
ER
N O
R
ST
A
TE
O
F
FL
O
RI
D A
D
EP
A
RT
M
EN
T O
F
BU
SI
N
ES
S
A N
D P
RO
FE
SS
IO
N A
L
RE
G U
LA
TI
O N
A
SB
ES
TO
S
LI
CE
N
SI
N
G U
N
IT
TH
E
A
SB
ES
TO
S
CO
N
SU
LT
A
N T
H
ER
EI
N
IS
L
IC
EN
SE
D
U N
D
ER
T H
E
PR
O V
IS
IO
N S
O F
CH
A
PT
ER
, F
LO
RI
D
A S
TA
TU
TE
S
H O
LL
EY
, T O
M C
D o no t a lte r t hi s do cu m en t i n an y fo rm
TE
RR
A
CO
N C
O N
SU
LT
A N
TS
IN
C
LI
CE
N
SE
N U
M
BE
R:
A
X7
EX
PI
RA
TI
O N
D A
TE
N O
V
EM
BE
R
, 2
Th is is yo ur li ce ns e.
It is u nl aw fu l f or a ny on e ot he r t ha n th e lic en se e to u se th is do cu m en t.
W W
A
TE
RS
A
V E
S
TE
C/ O
T
ER
RA
CO
N C
O N
SU
LT
A N
TS
TA
M
PA
F
L
A lw ay s ve rif y lic en se s on lin e at M yF lo rid aL ic en se .c om https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=fed2635478d389678a0a4b89bd8081e0
Report of Limited Asbestos and Paint Containing Lead Inspections, Polychlorinated Biphenyls Inspection and Limited Sub Basement Visual
Observations Activities
Malcolm Randall VA Hospital
Gainesville, Alachua County, Florida
November 14, 2019
Prepared for:
Dayton, Ohio
Prepared by:
Winter Park, FL
Terracon Consultants, Inc . 9655 Florida Mining Boulevard West Jacksonvil le, Florida 32257
P [904] 900 6494 terracon.com
November 22, 2019
116 E. 3rd Street
Dayton, Ohio 45402-2130
Attn: Ms. Pamela Rigling
VA Contracting Manager
Cell: (937) 626-8925
Email: prigling@rdcjohnpoe.com
RE: Report of Limited Asbestos and Paint Containing Lead Inspections, Polychlorinated
Biphenyls Inspection and Limited Sub-Basement Visual Observations
Malcolm Randall VA Hospital
Gainesville, Florida
Terracon Project No.: EQ197137
Dear Ms. Rigling:
The purpose of this report is to present the results of the Limited Asbestos and Paint Containing
Lead Inspections, Polychlorinated Biphenyls Inspection and Limited Visual Observations of a client-specified area of the sub-basement.
Terracon performed the pre-renovation survey on October 15, 2019, and October 16, 2019.
The limited surveys were performed based on information and drawings supplied by the client which determined the scope of work and the areas to be included in the inspections (designated areas).
Asbestos was detected in 30 of the 144 bulk samples obtained from the designated areas.
Lead was identified in one sample of paint collected from within the designated area as part of this survey.
Please see the attached report for details.
Terracon appreciates the opportunity to provide this service to RDC/John Poe Architects. If you have any questions regarding this report, please contact Mr. Peter Thompson at 904-900-6468.
mailto:prigling@rdcjohnpoe.com
Limited Asbestos, Paint Containing Lead, Polychlorinated Biphenyls
Inspections, and Limited Sub-Basement Visual Observations Malcolm Randall VA Hospital ■ Gainesville, FL November 22, 2019 ■ Terracon Project No. EQ197137
Sincerely, Florida Asbestos Consulting Business License No. ZA337
Peter Thompson Tom Holley CHMM, CIH, CSP
Senior Staff Scientist Florida Licensed Asbestos Consultant
AHERA Certified Building Inspector License No. AX75
Certificate # 190741-7596 Authorized Project Reviewer signed for
TABLE OF CONTENTS
Page
1.0 INTRODUCTION
1.1 Project Objective
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Asbestos Survey Activities
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
3.5 Paint Containing Lead Inspection Activities
3.6 Sample Collection
3.7 Sample Analysis
3.8 PCB Inspection Activities
3.9 Visual Observations for Asbestos Hazards
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
5.1 Asbestos
5.2 Paint Containing Lead
5.3 PCBs
5.4 Visual Observations
6.0 GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIAL
APPENDIX B ASBESTOS AND LEAD ANALYTICAL LABORATORY DATA
APPENDIX C PHOTOGRAPHS OF IDENTIFIED ACMS AND PCL
APPENDIX D INSPECTOR CERTIFICATIONS
Responsive ■ Resourceful ■ Reliable 1
LIMITED ASBESTOS AND PAINT CONTAINING LEAD INSPECTION,
POLYCHLORINATED BIPHENYLS INSPECTION AND LIMITED VISUAL
SUB-BASEMENT OBSERVATIONS
MALCOLM RANDALL VA HOSPITAL
GAINESVILLE, FLORIDA
November 22, 2019
Terracon Consultants, Inc. (Terracon) conducted a pre-renovation asbestos survey, a limited paint inspection for lead paint, polychlorinated biphenyls (PCB) inspection and limited visual observations of the sub-basement in the designated areas. Terracon performed the surveys on
October 15-16, 2019.
The limited asbestos survey, limited inspection of lead paint and limited PCB inspection was conducted by Mr. Ron Trapane and Mr. Peter Thompson, Asbestos Hazard Emergency
Response Act (AHERA)-accredited building inspectors. Copies of Mr. Trapane’s and Mr.
Thompson’s asbestos inspector training certificates are attached as Appendix D. The limited visual observations of the sub-basement were made by Mr. Peter Thompson.
The limited inspection of paint for lead was conducted by Mr. Peter Thompson. Mr. Thompson is an EPA-certified lead paint inspector.
The limited PCB inspection was conducted by Mr. Peter Thompson.
The limited surveys were performed based on information and drawings provided by the client.
The interior building components from the designated areas were surveyed and homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented.
Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids or in other concealed areas.
1.1 Project Objective
Terracon understands the purpose of these inspections was to provide information to the client regarding asbestos, lead, and PCB content in materials likely to be disturbed during renovations. EPA regulation 40 CFR 61, Subpart M, NESHAP, prohibits the release of asbestos fibers to the atmosphere during renovation or demolition activities. The asbestos NESHAP requires that potentially regulated asbestos-containing building materials be identified, classified and quantified prior to planned disturbances or demolition activities. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in EPA AHERA regulation, 40 CFR 763.86. Samples were delivered to an accredited laboratory for analysis Polarized Light
Microscopy (PLM).
1.0 INTRODUCTION
Malcolm Randall VA Hospital ■ Gainesville, FL
Responsive ■ Resourceful ■ Reliable 2
The designated area was a portion of the existing basement. The level is below the first floor but opens to street level at the west side. Typical interior building components from the designated area consisted of drywall systems, concrete masonry unit (CMU) and mortar walls, various types of drop-in ceiling tiles and vinyl floor tiles (VFT), ceramic floor tiles and associated beddings, grouts, and thinset, cove bases (all with associated adhesives), fire stop putties, and caulks.
3.0 FIELD ACTIVITIES
The surveys were conducted on October 15-16, 2019. A summary of survey activities is provided below.
3.1 Asbestos Survey Activities
The surveys were conducted in general accordance with the sample collection protocols established in EPA regulation AHERA, 40 CFR 763.86. Our survey activities began with visual observation of the interior building components from the designated areas to identify apparent homogeneous areas of suspect ACM. A homogeneous area consists of building materials that appear similar throughout in terms of color, texture and date of application. The assessment was conducted throughout visually accessible areas of the designated work area. Building materials identified as glass, wood, metal or rubber are not considered suspect ACM.
Terracon lifted floor coverings in selected locations and did not observe additional floor coverings/layers except as noted in the report. However, as Terracon could not assess beneath all flooring areas, there may be isolated areas of additional suspect material present beneath floor coverings.
3.2 Physical Assessment
A physical assessment of each homogeneous area of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the EPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with AHERA sampling protocols. Random samples of suspect materials were collected in each homogeneous area. Samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
2.0 BUILDING DESCRIPTION
Malcolm Randall VA Hospital ■ Gainesville, FL
Responsive ■ Resourceful ■ Reliable 3
A total of 144 bulk samples from the designated areas were collected from 58 homogeneous areas (HAs) of suspect ACM from the VA Hospital. A listing of suspect ACM observed and sampled from the designated areas during the survey is provided below.
• 12”x12” white with gray streaks vinyl floor tile and adhesive
• 12”x12” blue with dark and light blue streaks vinyl floor tile and adhesive
• 12”x12” white with dark gold/brown streaks vinyl floor tile and adhesive
• 12”x12” light beige with streaks vinyl floor tile and beige adhesive
• Beige adhesive under brown and peach rolled carpet
• Blue/green adhesive under blue rolled carpet, vinyl floor tile underneath
• 4” dark brown vinyl cove base with dark brown adhesive
• 6” gray vinyl cove base with beige adhesive
• 6” beige vinyl cove base with light beige adhesive
• 1.5”x1.5” glue/gray ceramic floor tile, grout, and thinset
• 4”x4” light blue ceramic wall tile, grout, and thinset
• 2’x2’ and 2’x4’ pinholes with random gouge design ceiling tile
• 2’x4’ short directional bacillus design with pinholes ceiling tile
• 2’x4’ large holes clustered and smooth areas with pinholes ceiling tile
• 2’x2’ or 2’x4’ large holes throughout with pinholes ceiling tile
• 1.5”x1.5” green/light green ceramic floor tile, grout, and thinset
• 2’x4’ deep fissure non-directional design ceiling tile
• Drywall and joint compound walls – 1975 clinical addition
• Plaster walls – 1975 clinical addition
• Drywall and joint compound walls – 1965 original building
• Plaster walls – 1965 original building
Malcolm Randall VA Hospital ■ Gainesville, FL November 22, 2019 ■ Terracon Project No. EQ197137
Responsive ■ Resourceful ■ Reliable 4
• Beige adhesive under fiber reinforced panel
• Beige/brown small pebble mosaic design sheet vinyl flooring and yellow adhesive
• 6” black vinyl cove base and dark beige adhesive
• Beige fabric wallpaper and dark beige adhesive
• 2’x2’ pink and turquoise carpet squares and blue/green adhesive
• Red “fire stop” putty
• HA skipped
• Black lab countertop
• 1.5”x1.5” peach and gray speckled ceramic floor tile, grout, and thinset
• Black mastic sink undercoat
• 9”x9” brown with white/brown streaks vinyl floor tile and black mastic
• 6” cream vinyl cove base and dark beige adhesive
• 2’x4’ smooth gypsum board ceiling tile
• 2’x4’ mostly smooth with a few large holes ceiling tile
• Beige gap filler at floor transition with yellow adhesive
• Beige/off-white terrazzo floor
• 3” small black cove base and dark beige adhesive
• 4”x4” off-white ceramic wall tile, grout, and thinset
• White mastic sink undercoat
• Light blue with white streaks sheet vinyl flooring and dark beige adhesive
• Turquoise and green wallpaper with adhesive
• Gray mastic sink undercoat
• Light gray with white streaks sheet vinyl flooring and adhesive
• 12”x12” light beige with dark brown streaks vinyl floor tile and dark brown adhesive
Malcolm Randall VA Hospital ■ Gainesville, FL November 22, 2019 ■ Terracon Project No. EQ197137
Responsive ■ Resourceful ■ Reliable 5
• 1”x1” green and gray speckled ceramic floor tile, grout, and thinset.
• 3’x3’ cream with pebble design vinyl floor panel and black mastic
• Light gray duct mastic
• Gray 15” diameter transite pipe
• Cream mastic sealer
• Brown caulk sealant
• 6” dark brown vinyl cove base with dark beige mastic
• Pink “fire stop” putty
• Dark peach/terracotta “fire stop” putty
• Dark brown “fire stop” putty
• Dark gray seam mastic on bare metal ducts
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to Moody Labs in Farmers Branch, Texas, for analysis by Polarized Light Microscopy per EPA methodology EPA/600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation or point counting.