Q_A.pdf
PDF 128 KB Posted
- Solicitation number
- 36C24821Q0940
About this file
This combined synopsis and solicitation requests quotes for a utility monitoring service for Veterans Affairs clinics in the Caribbean. The Department of Veterans Affairs, James A Haley VA Healthcare System is seeking to award a firm-fixed price service contract. Quotes are due no later than July 9, 2021 and shall be submitted on an all-or-none basis. The requirement includes monitoring utilities at VA clinics in Arecibo, Carolina, Ceiba, Comerio, Guayama, Mayaguez, Ponce, St. Croix, St. Thomas, Utuado, Vieques, and the VA warehouse in San Juan. The North American Industry Classification System code is 561990 and the period of performance is 240 days. The opportunity is set aside for small businesses and responses should be submitted to the specified contracting officer via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Layout - Vieques.pdf | ||
| Layout - St Croix.pdf | ||
| Layout - Utuado.pdf | ||
| Layout - Comerio.pdf | ||
| Layout - MOPC.pdf | ||
| 36C24821Q0940 0002.docx | DOCX document | |
| Layout - St Thomas.pdf | ||
| Layout - Guayama.pdf | ||
| Layout - Ponce.pdf | ||
| Layout - Carolina Warehouse New.pdf | ||
| Layout - Arecibo.pdf | ||
| Layout - Ceiba.pdf | ||
| 36C24821Q0940 0001.docx | DOCX document | |
| 36C24821Q0940.docx | DOCX document | |
| SCOPE OF WORK Utility Monitoring.pdf | ||
| ATTACHMENT C-CLAUSES.pdf | ||
| EVALUATION FACTORS Utility Monitoring.pdf | ||
| SCHEDULE.pdf | ||
| LIMITATIONS OF SUBCONTRACTING.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please reference below answers to the RFIs.
First Set of Questions:
1. Please provide layout for each clinic. See attached.
2. Please provide information of which clinics have water storage tanks.
WATER OPC and Vet Centers Capacity Usage
(gallons/day) Water Supply
Water Storage Responsibility
Arecibo CBOC 400 Data not avaliable PRASA VA
New Carolina Warehouse 4,000 Data not avaliable PRASA LESSOR
Ceiba Potable Cistern 1,000 246 PRASA VA
Comerio VA Clinic 400 55 PRASA VA
Guayama 1,000 PRASA VA
Mayaguez Cistern 150,000 5,000 PRASA LESSOR
Ponce 25,000 3,260 PRASA LESSOR
St. Croix 75,000 Data not avaliable WAPA LESSOR
St. Thomas 80,000 Data not avaliable WAPA LESSOR
Utuado 46,000 Data not avaliable PRASA LESSOR
Vieques 1,200 Data not avaliable PRASA LESSOR
3. Please verify period of performance. We respectfully suggest to modify contract period of performance, we understand that 30 days is not enough time for this type of project. Agree, recommend having the period of performance extended up to 240 days.
4. Please provide specification for data requitements and works on VA IT Closets. Awaiting IT response.
Second Set of Questions:
Project Management:
1- Please provide layouts for all sites, showing the systems and relative locations to each other, including measurements. See attached.
2- 30 days for the performance is too short for this project. Are you going to reevaluate this?
Agree, recommend having the period of performance extended up to 240 days.
3- For the yearly maintenance, is this something you require the contractor to visit regularly to keep the systems working or is this like a preventive maintenance activity to be performed only once a year? This will based on the requirements of the selected equipment. .
About requirements:
4- Does the proposed solution have to connect to the existing network on-site? We need details on the type of connections you require / allow for the project. For example: Is it required to connect to an existing system on each site or do we get the signal to the Internet via your network or via cellular and then receive them at the San Juan location for monitoring? Based on previous similar ones for IT Closets, if personnel will be working on them, then an ITOPS escort is required. And since the main hub is in San Juan, I believe all CBOCs will be connected to San
Juan.
5- Is the Trane Tracer Ensemble system installed on each site? We need information on the architecture of the Trane Tracer installation. Trane TRACER Ensemble installed at San Juan’s
Operations Control Center.
6- Do you require the solution to have its own power supply (UPS) in case of site power failure? Yes.
Technical:
7- The scope requires to perform an assessment at the listed clinics. For the proposal, do you require a solution that works in any situation? This is because the conditions and VA equipment may vary. What can we assume without doing the assessment first? Based on the observations at the Mayaguez Outpatient Clinic and the layouts provided, provide a systematic solution that can be applied to all facilities.
File details come from the government source that posted it. Updated .