This document is a site assessment report addendum addressing comments from the Environmental Protection Commission on a previous report regarding a petroleum discharge at a Veterans Hospital site. The report addendum provides construction diagrams for recovery wells installed at the site to address contaminated groundwater. It also includes a scaled site map showing estimated extent of free product and commits to including specified conclusions and recommendations in future reports. The report recommends continuing free product recovery and quarterly groundwater monitoring of multiple wells for petroleum compounds, and installing longer screens on two temporary monitoring wells to better aid monitoring and recovery efforts. It concludes by recommending activities to further assess site closure options under applicable risk management rules.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SCHEDULE JULY 20.docx | DOCX document | |
| 36C24821Q0887 0001_1.docx | DOCX document | |
| Attachment 2 to SOW (1).pdf | ||
| QUESTIONS AND ANSWERS.docx | DOCX document | |
| 36C24821Q0887 0001.docx | DOCX document | |
| PERFORMANCE WORK STATEMENT.docx | DOCX document | |
| 36C24821Q0887_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1821 Sahlman Drive, Tampa Florida 33605, Tel 813 258-5561, Fax 813 258-4257 Tampa, FL ▪ Knoxville, TN ▪ Port Townsend, WA
November 23, 2015
Mr. Carl Heintz, P.G.
Senior Hydrologist
Environmental Protection Commission
Hillsborough County
3629 Queen Palm Drive
Tampa, Florida 33619
Source Assessment Report Addendum (SARA)
James A. Haley Veterans’ Hospital
Power Plant Compound
13000 Bruce B. Downs Boulevard
Tampa, Florida 33612
FDEP ID No. 29/8627247
Dear Mr. Heintz:
This Site Assessment Report Addendum (SARA) addresses EPCHC comments dated October
22, 2015 and included as Appendix A. Comments are addressed in the order received.
Comment 1
Please provide a copy of the certification of treatment for the 91.28 tons of petroleum-contaminated soil that were thermally treated, as required by Rule 62-780.500(7)(a)14, F.A.C.
Response 1
The certificate of treatment is included as Appendix B.
Comment 2
Please provide construction diagrams for recovery wells RW-1 through RW-5, as required by
Rule 62-780.600(8)(a)21, F.A.C.
Response 2
A total of eight (8) recovery wells (RW-1 thru RW-8) have been installed at the site. All recovery wells are constructed of schedule 40 PVC installed to a depth of 14 ft bls with well screens extending from 9 to 14 ft bls. Recovery wells RW-1 thru RW-5 are 2-inch diameter while recovery wells RW-6 thru RW-8 are 1-inch diameter. Recovery well locations are included on Figure 1. Recovery well construction diagrams are included in Figure 2.
Comment 3
Please provide a scaled site map that shows the estimated extent of free product, as required by
Rule 62-780.600(8)(a)25, F.A.C.
Response 3
A scaled site map illustrating the extent of free product is included as Figure 1.
Comment 4
The geologist of record concludes, “Although a slight BaP exceedance of the residential SCTL was detected in soil sample SB-21 obtained from 0-6 inches bls, this detection is an anomaly and consistent with background BaP concentrations in urban environments.” Please include the geologist of record’s conclusion as a footnote on all pertinent scaled site diagrams and analytical summary tables. This will be important at the time that you and your consultant propose closure for the above-referenced petroleum discharge.
Response 4
Acknowledged. This footnote will be added to all pertinent scaled site diagrams and analytical summary tables included in future submittals.
Comment 5
The geologist of record recommends continuing free product recovery and conducting quarterly groundwater monitoring of monitoring wells MW-3, MW-4, MW-5, MW-6, MW-7 and DW-1 for
BTEX/MTBE, PAHs and TRPH. Please include contaminated temporary monitoring locations
TMW-1 and TMW-2 (using 10 to 15 foot well screens, not 5 foot screens) as source well locations for groundwater monitoring and free product recovery. Also, if the low levels of petroleum contamination in apparent downgradient monitoring well MW-3 do not attenuate, please be advised that a monitoring well along the downgradient edge of the plume will need to be installed if a Remedial Action Plan (RAP), Natural Attenuation Monitoring (NAM) Plan and/or Post Active Remediation Monitoring (PARM) Plan are proposed in the future. Quarterly
Free Product Recovery Reports (including free product extent maps) should be submitted in accordance with the requirements of Rule 62-780.500(7), F.A.C.
Response 5
Acknowledged. Upon approval of the SARA, temporary monitoring wells TMW-1 and TMW-2 will be reinstalled using 10 to 15 foot wells screens. In the event the petroleum contamination in downgradient monitoring well does not attenuate, an additional well will be installed along the downgradient edge of the plume.
CONCLUSIONS AND RECOMMENDATIONS
The data contained is this SARA, along with the previous SAR, fulfill Site Assessment requirements in accordance with FAC 62-770. Streamline recommends completing the following activities:
• Conduct quarterly groundwater monitoring to help assess site closure options.
Groundwater samples should be collected from monitoring wells TMW-1, TMW-2, MW-
3, MW-4, MW-5, MW-6, MW-7, and
DW-1. The groundwater samples should be analyzed by EPA Methods 8260
(BTEX/MTBE), 8270 (PAHs), and TRPH by Method FL-PRO.
• Continue free product recovery until no free product remains.
• Prepare and submit quarterly groundwater monitoring and free product recovery reports to the EPC within 30 days of receipt of laboratory results. Reports will include summary tables and site plans summarizing the data. Groundwater flow direction will be determined during each monitoring event. Reports will include a discussion of results, contaminant trends, and free product extent maps.
• Determine if the site may meet the criteria for conditional site closure in accordance with
Chapter 62-780 – Risk Management Option Level II or Low Score Site Initiative No
Further Action pending site scoring.
Thank you for your attention to this matter. Please do not hesitate to contact me if you have any questions or need any additional information at this time. We look forward to your response.
Sincerely, STREAMLINE ENVIRONMENTAL, INC.
Lee T. Ford
Senior Environmental Scientist cc: Victoria Cockrell, James A. Haley Veterans’ Hospital
FIGURES
DATE: 11/20/15 FILE: 150106 BY: LTF
FIGURE 1
WELL LOCATION MAP
JAMES A. HALEY VETERANS’ HOSPITAL
13000 BRUCE B DOWNS BOULEVARD
TAMPA, FL 33612
APPROXIMATE SCALE
1 INCH = 10 FEET
0 10
CONCRETE DRIVEWAY
12,000 GAL.
DIESEL AST
12,000 GAL.
DIESEL AST
CONCRETE SLAB
CONCRETE SLAB
ESTIMATED
EXTENT OF
FREE PRODUCT
DISTRIBUTION
UNDERGROUND
DIESEL SUPPLY LINE
UNDERGROUND
DIESEL SUPPLY LINE
CONCRETE
WALKWAY
POWER PLANT
CONTROL ROOM
CONCRETE SLAB
CONCRETE SLAB
LOAD
BANK
LOAD
BANK
TRANSFORMERS
GRAVEL
CONCRETE SIDEWALK
GRAVEL
FILTER BOX
12 FT BLOCK WALL
ASPHALT DRIVEWAY
GRAVEL
G R
A V
E L
GRAVEL
GRAVEL
GRAVEL
MW-6
0.0
TMW-1
0.3
TMW-2
0.0
MW-3
0.0
MW-4
0.0
MW-5
0.0
MW-6
0.0
MW-7
0.0
DW-1
0.0
RW-1
0.0
RW-2
0.0
RW-3
1.1
RW-4
2.03
RW-5
0.3
RW-8
0.6
RW-3
0.3
RW-3
0.3
X
12,000 GAL.
DIESEL AST
RW-7
2.6
RW-6
6.1
LEGEND
= 2-INCH RECOVERY WELL LOCATION
= WELL DESIGNATION
= INCHES OF FREE PRODUCT
= 1-INCH RECOVERY WELL LOCATION (INACTIVE)
= MONITORING WELL LOCATION
= TEMPORARY WELL TMW-1 REMOVED AND WILL BE
REINSTALLED AT A LATER DATE
MW-5
0.0
X
DATE: 11/20/15 BY: LTFFILE: 150106
FIGURE 2
RECOVERY WELL CONSTRUCTION DIAGRAM
APPROXIMATE
PROPERTY BOUNDARY
LAND SURFACE
20/30 GRADE
SILICA SAND
FILTER PACK
WELL POINT
5 FEET
0.010 INCH - SLOTTED
WELL SCREEN
14 FEET BELOW
LAND SURFACE
APPROXIMATE
WATER TABLE
10 FT BLS
9 FEET
SOLID PVC
WELL CASING
(RW-1 THRU RW-5 = 2-INCH DIAMETER)
(RW-6 THRU RW-8 = 1-INCH DIAMETER)
NOT TO SCALE
JAMES A. HALEY VETERANS’ HOSPITAL
13000 BRUCE B DOWNS BOULEVARD
TAMPA, FL 33612
APPENDIX A
EPC COMMENT LETTER – OCTOBER 22, 2015
COMMISSION DIVISION DIRECTORS
Kevin Beckner Lesley “Les” Miller, Jr. Legal & Admin. Richard Tschantz, Esq.
Victor D. Crist Sandra L. Murman Air Management Jerry Campbell, P.E.
Ken Hagan Stacy White Waste Management Hooshang Boostani, P.E.
Al Higginbotham Water Management Sam Elrabi, P.E.
Wetlands Management Scott Emery, Ph.D.
EXECUTIVE DIRECTOR
Janet Dougherty
An agency with values of environmental stewardship, fairness, and cooperation Roger P. Stewart Center
3629 Queen Palm Drive, Tampa, FL 33619 - (813) 627-2600 - www.epchc.org An Affirmative Action / Equal Opportunity Employer
October 22, 2015
Ms. Victoria Cockrell
Veterans Administration Hospital
13000 Bruce B Downs Blvd.
Tampa, Florida 33612-4745
Dear Ms. Cockrell:
SUBJECT: JAMES A HALEY VETERANS HOSPITAL, 13000 BRUCE B DOWNS
BLVD, TAMPA, FLORIDA, FDEP FACILITY ID #298627247 –
PETROLEUM DISCHARGE DISCOVERED ON JANUARY 12, 2015
On October 21, 2015, Environmental Protection Commission (EPC) Petroleum Cleanup Section staff received Streamline Environmental, Inc.’s (Streamline) April 16, 2015 Interim Source
Removal Report (ISRR)/Site Assessment Report (SAR) that has been submitted in response to
EPC Storage Tanks Compliance Department (STCD) staff’s January 26, 2015 site assessment
(SA) initiation request letter to Veterans Administration Hospital. The ISRR/SAR helps to address the above-referenced diesel fuel discharge, which currently does not have an assigned score from the Florida Department of Environmental Protection (FDEP) Petroleum Restoration
Program (PRP).
The ISRR/SAR requires additional information. Pursuant to Rules 62-780.500(8) and 62-
780.600(10) of the Florida Administrative Code (F.A.C.), please provide two professionally certified copies of an ISRR/SAR Addendum (i.e., one hard copy and one electronic copy) that addresses the following comments within sixty (60) days of the date of this letter.
Please provide a copy of the certification of treatment for the 91.28 tons of petroleum-contaminated soil that were thermally treated, as required by Rule 62-780.500(7)(a)14, F.A.C.
Please provide construction diagrams for recovery wells RW-1 through RW-5, as required by Rule 62-780.600(8)(a)21, F.A.C.
Please provide a scaled site map that shows the estimated extent of free product, as required by Rule 62-780.600(8)(a)25, F.A.C.
The geologist of record concludes, “Although a slight BaP exceedance of the residential
SCTL was detected in soil sample SB-21 obtained from 0-6 inches bls, this detection is an anomaly and consistent with background BaP concentrations in urban environments.” Please include the geologist of record’s conclusion as a footnote on all pertinent scaled site diagrams and analytical summary tables. This will be important at
October 22, 2015
Ms. Cockrell the time that you and your consultant propose closure for the above-referenced petroleum discharge.
The geologist of record recommends continuing free product recovery and conducting quarterly groundwater monitoring of monitoring wells MW-3, MW-4, MW-5, MW-6, MW-7 and DW-1 for BTEX/MTBE, PAHs and TRPH. Please include contaminated temporary monitoring locations TMW-1 and TMW-2 (using 10 to 15 foot well screens, not 5 foot screens) as source well locations for groundwater monitoring and free product recovery. Also, if the low levels of petroleum contamination in apparent downgradient monitoring well MW-3 do not attenuate, please be advised that a monitoring well along the downgradient edge of the plume will need to be installed if a Remedial Action Plan
(RAP), Natural Attenuation Monitoring (NAM) Plan and/or Post Active Remediation
Monitoring (PARM) Plan are proposed in the future. Quarterly Free Product Recovery
Reports (including free product extent maps) should be submitted in accordance with the requirements of Rule 62-780.500(7), F.A.C.
Please call me at (813) 627-2600 ext. 1302 if you wish to discuss these matters. Please reference the FDEP Facility ID # if you call.
Sincerely, Carl J. Heintz, P.G.
Senior Hydrologist c: FDEP OCULUS
Steffanie Wickham, General Manager III, EPC Petroleum Cleanup Section
Craig R. Smith, P.G., Streamline Environmental, Inc., 1821 Sahlman Drive, Suite B, Tampa, Florida 33605
Brian Dinning, Project Manager, Streamline Environmental, Inc., 1821 Sahlman Drive, Suite B, Tampa, Florida 33605
Lee T. Ford, Streamline Environmental, Inc., 1821 Sahlman Drive, Suite B, Tampa, Florida 33605
Monthly Report File
FDEP Facility ID #298627247 File
APPENDIX B
CERTIFICATE OF TREATMENT