36C24818R0342 Spec 07015019 Roofing Specs.pdf

View the file

Other files

File Type Posted
36C24818C0137-000.docx DOCX document
36C24818R0342-00001003.pdf PDF
36C24818R0342-00001000.docx DOCX document
36C24818R0342-00001001.pdf PDF
36C24818R0342-00001002.pdf PDF
36C24818R0342-005.pdf PDF
36C24818R0342-001.docx DOCX document
36C24818R0342-003.pdf PDF
36C24818R0342-004.pdf PDF
36C24818R0342-002.pdf PDF
36C24818R0342-000.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 07 01 50.19

PREPARATION FOR RE-ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Partial roof removal for new roof system installation.

2. Roofing membrane and selective roofing system component removal for new roof membrane installation.

3. Existing roofing membrane preparation for new roofing membrane installation.

1.2 RELATED REQUIREMENTS

A. Replacement Roof Deck.

B. Sheet Metal Counterflashing.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI):

1. FX-1-01(R2006) Standard Field Test Procedure for Determining the Withdrawal

Resistance of Roofing Fasteners.

2. C1153-97(2003) e1 - Location of Wet Insulation in Roofing Systems Using Infrared

Imaging.

3. D4263-83(2012) - Indicating Moisture in Concrete by the Plastic Sheet Method.

1.4 PREINSTALLATION MEETINGS

A. Conduct pre-installation meeting minimum 30 days before beginning Work of this section.

1. Required Participants:

a. Contracting Officer's Representative.

b. Contractor.

c. Installer.

d. Other installers responsible for adjacent and intersecting work, including mechanical and electrical equipment installers.

2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Removal and installation schedule.

b. Removal and installation sequence.

c. Preparatory work.

d. Protection before, during, and after installation.

e. Removal and installation.

f. Temporary roofing including daily terminations.

g. Transitions and connections to other work.

h. Inspecting and testing.

i. Other items affecting successful completion.

3. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Description of temporary roof system and components.

3. List of patching materials.

4. Recover board fastening requirements.

5. Temporary roofing installation instructions and removal instructions. Preparation instructions to receive new roofing.

6. Existing roofing warrantor's instructions.

D. Photographs: Document existing conditions potentially affected by roofing operations before work begins.

E. Field Inspection Reports:

1. Certify warrantor inspected completed roofing and existing warranty remains in effect.

F. Infrared Roof Moisture Survey Report.

1.6 QUALITY ASSURANCE

A. Installer Qualifications:

1. Licensed to perform asbestos abatement in Project jurisdiction when removal of asbestos-containing material is required.

2. Approved by existing roofing system warrantor when work affects existing roofing system under warranty.

1.7 FIELD CONDITIONS

A. Building Occupancy: Perform work to minimize disruption to normal building operations.

1. Verify occupants are evacuated from affected building areas when working on structurally impaired roof decking above occupied areas.

2. Provide notice minimum 72 hours before beginning activities affecting normal building operations.

B. Existing Roofing Available Information:

a. Construction drawings and project manual.

C. Weather Limitations: Proceed with reroofing preparation only during dry weather conditions as specified for new roofing installation in Section 07 51 00.

1. Remove only as much roofing in one day as can be made watertight in same day.

D. Hazardous materials are not expected in existing roofing system.

1. Known hazardous materials were removed before start of work.

2. Do not disturb suspected hazardous materials. When discovered, notify Contracting

Officer's Representative.

3. Hazardous materials discovered during execution of the work will be removed by

Government as work of a separate contract.

E. Hazardous Materials are known to exist in existing roofing system.

1. See Section 02 82 13.21, ASBESTOS ROOFING ABATEMENT for hazardous material removal and disposal.

2. Coordinate reroofing preparation with asbestos roofing abatement to prevent water from entering existing roofing system and building.

1.8 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."

B. Existing Warranties: Perform work to maintain existing roofing warranty in effect.

1. Notify warrantor before beginning, and upon completion of reroofing.

2. Obtain warrantor's instructions for maintaining existing warranty.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Patching Materials: Match existing roofing system materials.

B. Metal Flashing: See Section 07 60 00, SHEET METAL FLASHING AND TRIM.

C. Temporary Protection Materials:

1. Expanded Polystyrene (EPS) Insulation: ASTM C578.

2. Plywood: NIST DOC PS 1, Grade CD Exposure 1.

3. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.

D. Temporary Roofing System Materials: Contractor's option.

E. Fasteners: Type and size required by roof membrane manufacturer to resist wind uplift.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Infrared Roof Moisture Survey: Ground-based, walk-over type performed according to

ASTM C1153.

1. Record the entire survey on DVD and provide one copy to Contracting Officer's

Representative with report.

2. Include in report thermograms of suspect areas and corresponding daytime photos of same locations.

3. Mark out roof areas determined to be wet to indicate areas to be removed.

3.2 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing roofing system indicated to remain.

1. Cover roof membrane with temporary protection materials without impeding drainage.

2. Limit traffic and material storage to protected areas.

3. Maintain temporary protection until replacement roofing is completed.

C. Protect existing construction and completed work from damage.

D. Protect landscaping from damage.

E. Maintain access to existing walkways and adjacent occupied facilities.

F. Coordinate use of rooftop fresh air intakes with Contracting Officer's Representative to minimize effect on indoor air quality.

G. Ensure temporary protection materials are available for immediate use in case of unexpected rain.

H. Ensure roof drainage remains functional.

1. Keep drainage systems clear of debris.

2. Prevent water from entering building and existing roofing system.

I. Coordinate rooftop utilities remaining active during roofing work with Contacting

Officer's Representative.

3.3 RE-ROOFING PREPARATION - GENERAL

A. Notify Contacting Officer's Representative of planned operations, daily.

1. Identify location and extent of roofing removal.

2. Request authorization to proceed.

3.4 PARTIAL ROOFING SYSTEM REMOVAL

A. Remove existing roofing completely, exposing structural roof deck at locations and to extent indicated on drawings.

1. Remove cover board, roof insulation, vapor retarder and substrate board.

2. Remove or cut-off roofing system fasteners.

3.5 ROOFING MEMBRANE AND SELECTIVE ROOFING SYSTEM COMPONENT

REMOVAL

A. Remove existing roofing membrane, only, in locations and to extent indicated on drawings.

B. Visually inspect cover board, roof insulation, vapor retarder and substrate board for moisture immediately after roof membrane removal.

1. Coordinate with Contracting Officer's Representative to observe inspections.

2. Identify wet roofing system components required to be removed.

3. Mark roofing system removal locations and extents.

C. Remove wet roofing system components.

1. Remove or cut-off roofing system fasteners when removals expose structural roof deck.

D. Patch selective roofing system removals immediately after inspection and repair.

E. Install patching materials to match existing roofing system.

F. Patch roofing membrane to maintain building watertight, unless new roofing membrane is installed same day as removal and repair.

3.6 DECK PREPARATION

A. Inspect structural roof deck after roofing system removal.

B. Concrete Roof Decks:

1. Visually confirm concrete roof deck is dry.

2. Perform moisture test according to ASTM D4263 each day for each separate roof area.

a. Proceed with roofing work only when moisture is not observed.

C. Steel Roof Decks:

1. Visually inspect structural roof deck installation and fasteners.

a. Notify Contracting Officer's Representative of unsuitable conditions and inadequate fastenings potentially affecting roof system performance.

2. Secure roof deck with additional fastenings as indicated on drawings or determined by Contracting Officer's Representative.

3. Replace roof deck as indicated on drawings.

a. Replacement Roof Deck: See Section 05 31 00, STEEL DECKING.

3.7 TEMPORARY ROOFING

A. Install temporary roofing to maintain building watertight.

B. Remove temporary roofing before installing new roofing.

C. Prepare temporary roofing to receive new roofing.

3.8 BASE FLASHING REMOVAL

A. Expose base flashings to permit removal.

1. Two-Piece Counterflashing’s: Remove cap flashing and store for reuse.

2. Single Piece Counterflashing’s: Carefully bend counterflashing.

3. Metal Copings: Remove decorative cap and store for reuse.

B. Remove existing base flashings.

1. Clean substrates to receive new flashings.

C. Replace counterflashing’s damaged during removal.

1. Counterflashing’s: See Section 07 60 00 SHEET METAL FLASHING AND TRIM.

D. Remove existing parapet sheathing and inspect parapet framing.

1. Notify Contracting Officer's Representative of damaged framing.

E. Install pressure-preservative treated, exterior fire-retardant-treated, plywood sheathing, 15 mm (19/32 inch) thick.

3.9 FIELD QUALITY CONTROL

A. Existing Roofing System Warrantor Services:

1. Inspect reroofing preparation and roofing installation to verify compliance with existing warranty conditions.

2. Submit reports of field inspections, and supplemental instructions issued during inspections.

3.10 DISPOSAL

A. Collect waste materials in containers.

B. Remove waste materials from project site, regularly, to prevent accumulation.

C. Legally dispose of waste materials. - - E N D - -