36C24726R0085.pdf

PDF 717 KB Posted

Attached to
RFP Replace Roofs on Bldgs. 19, 20, 50, 51, & 62
Solicitation number
36C24726R0085, 619A4-24-102
Issued by
Limestone County, Alabama

About this file

RFP Summary: Replace Roofs on Buildings 19, 20, 50, 51, & 62

This is a Request for Proposal (RFP) issued by the Department of Veterans Affairs, VISN 7 Network Contracting Office, for comprehensive roofing replacement and remediation work at the Central Alabama Veterans Health Care System (CAVHCS) in Tuskegee, Alabama. The project involves complete roof replacement on five buildings (19, 20, 50, 51, and 62), including site preparation, demolition of existing structures, asbestos and hazardous materials remediation, lightning protection installation on all five buildings, and replacement of mechanical equipment. The scope of work requires a firm fixed-price contract with a performance period of 496 calendar days from the notice to proceed. An organized site visit is scheduled for April 23, 2026, at 12:30 p.m. CT at the East CAVHCS campus. Requests for information must be submitted in writing by April 30, 2026, at 1:00 p.m. ET. Sealed offers are due by May 14, 2026, at 1:00 p.m. EDT via email only. Award is anticipated following evaluation of proposals using a best-value tradeoff analysis considering past performance and price.

This acquisition is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) only, with NAICS code 238160 (Roofing Contractors) and a small business standard of $19 million. The project is estimated between $5 million and $10 million. Offerors must be registered at SAM.gov with current certifications and comply with VETS-4212 Federal Contractor Veterans Employment Report requirements. A bid guarantee of 20 percent of the proposal price (not to exceed $3 million) is required, with performance and payment bonds due within 10 days of award. Wage determination General Decision AL20260078 from January 2, 2026, applies to all contractors and subcontractors. Offerors must submit relevant and recent past performance experience (within five years) with a minimum of one and maximum of three references, along with itemized cost breakdowns. Past performance will be weighted significantly more heavily than price in the evaluation process. All contractor personnel must obtain VA-issued PIV badges prior to starting work and comply with all security, badging, and facility access requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 of

36C24726R0085 X

04-27-2026 resulting from this RFP 619-26-1-5335-0002 619A4-24-102

36C247 Department of Veterans Affairs VISN 7 Network Contracting Office 2400 hospital Rd., Bldg 68, Rm 72-79 Tuskegee, AL 36083

Email only. Send to contract specialist:

gregory.snyder@va.gov and CC: joyce.powers1@va.gov

No physical documents will be accepted.

Adia Foster 334-590-9446

Project No./Title: 619A4-24-102, "Replace Roofs on Bldgs. 19, 20, 50, 51, & 62" Project Location: Central Alabama Veterans Health Care System (CAVHCS) - See box 7

This acquisition is 100% Set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSBs) only.

The SDVOSB Business must be 51% or more owned and controlled by one or more service-connected veterans.

Offerors are required to complete VAAR 852.219-75, Limitations on Subcontracting (See Attachment 2).

MAGNITUDE OF CONSTRUCTION: Between $5,000,000.00 and $10,000,000.00 NAICS Code: 238160; Small Business Standard: $19 Million

To be eligible for award, the offeror shall be registered at the following websites: System for Award Management at sam.gov with completed electronic annual representations certifications, SBA at certifications.sba.gov and comply with VETS 4212, Federal Contractor Veterans Employment Report. Offerors MUST ensure registration in these websites are accurate, complete, and have not expired prior to proposal due date or thereafter.

Offerors who have not done business with VA must complete VA10091 to register in financial database (see Attachment 6).

Site Visit: An organized site visit is scheduled for 4/23/2026 at 12:30am CT.

Location: Meet at the East CAVHCS campus, 2400 hospital Rd., Tuskegee, AL, 36083 behind bldg. 62 (LOT Q).

Information provided at the site visit shall not alter the terms and conditions of the solicitation and terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Offerors are required to submit all questions in writing to the Contracting Officer following the site visit.

Requests for Information (RFIs) are due by 4/30/2026 at 1:00pm ET via email to gregory.snyder@va.gov.

Late RFIs may not be accepted, and offerors are responsible of ensuring questions are received on time.

Responses to RFIs will be provided in question-and-answer format via a posted amendment at www.sam.gov.

Offer guarantee will be accepted via email only if received before the date/time specified in block 13a below to the Email specified in block 8 above. Hand-delivered and/or mailed offer guarantees will not be accepted.

30 496 x x provisions and clauses

X 10

1 electronic 1:00pm EDT

5/14/2026

X

VHAAUGSnydeG Highlight

VHAAUGSnydeG Highlight

VHAAUGSnydeG Highlight

VHAAUGSnydeG Highlight

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Complete Price Offer Schedule

36C247

Department of Veterans Affairs

VISN 7 Network Contracting Office

501 Greene Street, Ste 2

Augusta, GA 30901

Austin Payment Center

Department of Veteran Affairs

PO Box 149971

Austin TX 78714-8971

(877) 353-9791 (512) 460-5545

Gregory Snyder

VA-VHA-RPOE-2026-0018

(To be completed by Government)

36C24726R0085

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR

REPAIR)– BACK

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 PRICE OFFER SCHEDULE

2.2 STATEMENT OF WORK

2.3 PROPOSAL PREPARATION AND EVALUATION INFORMATION

2.4 GENERAL SOLICITATION INFORMATION

2.5 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

2.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE

WORK (NOV 2025) (DEVIATION)

2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS

(MAY 2014)

2.8 52.228-1 BID GUARANTEE (SEP 1996)

2.9 52.233-2 SERVICE OF PROTEST. (SEP 2006) (DEVIATION NOV 2025)

2.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND

CERTIFICATIONS (NOV 2025) (DEVIATION)

2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) 30

2.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

2.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

2.14 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

2.15 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY

REFERENCE (JAN 2008)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.2 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION) . 34

3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021) (DEVIATION NOV 2025)

GENERAL CONDITIONS

4.1 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)

4.2 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025)

(DEVIATION)

4.3 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND SAFETY DATA (NOV 2025)

(DEVIATION) ALTERNATE I (NOV 2025)

4.4 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)

4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)

4.8 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (DEVIATION) (NOV 2025)

4.9 852.204-70 Personal Identity Verification of Contractor Personnel (MAR 2026)

(DEVIATION)

4.10 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR 2026)

(DEVIATION)

4.11 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

4.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-

DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)

4.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE

OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

4.14 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION

(OCT 2020)

4.15 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)

4.16 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)

4.16 List of Attachments

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 PRICE OFFER SCHEDULE

Description – in order of priority U/I QTY UNIT PRICE TOTAL

PRICE

Item 1 – Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to provide a comprehensive addressment of the roofing systems to prevent further damage resultant of the roofs’ failings to buildings 19, 20, 50, 51, and 62, as required by drawings, specifications, an Statement of Work (SOW) including the necessary removal of existing structures and construction and certain other items.

Completion Time: 496 Calendar Days from Notice to Proceed (NTP)

Item 2, Deduct - BASE BID except delete Deducts outlined in the Architectural Drawings; Delete all work and material associated with installation of rigid insulation in attic of buildings 19 & 20. This is including (but not limited to) all demolition work for preparation of installation.

JB

JB

A single award will be made on line item for which funds are determined available. REFER TO VAAR Provision 852.236-92, Notice to Bidders-Additive or Deductive Bid Line Items.

The Period of Performance includes submittal phase and the completion of all punch list items.

ATTACH YOUR ITEMIZED COST BREAKDOWN: Offerors are to include a construction price/cost breakdown using Attachment 4.

2.2 STATEMENT OF WORK

A. GENERAL GUIDANCE

1. Title of Project: 619A4-24-102, Replace Roofs on Buildings 19, 20, 50, 51 and 62

2. Project Overview: This project will replace the Roof on Buildings 19, 20, 50, 51 and 62 for Central Alabama Veterans Health Care Systems - East (CAVHCS-East).

3. Scope of Work: The contractor shall provide all labor, supervision, transportation, materials, and incidentals to deliver all aspects of the project.

Each building, ranging in historical features, roof type, and severity of deficiency, will be repaired, have asbestos and other hazardous materials remediated, lightning protection provided, and any roof drainage issues addressed. All existing mechanical equipment and associated mounting, flashing, duct, and piping shall be removed and replaced to below the roofing. Lightning protection is to be installed on all 5 buildings.

See design documents for further details.

4. Location of Work: CAVHCS-East, 2400 Hospital Road, Tuskegee, AL 36083

5. Period of Performance: The required period of performance will be 496 calendar days from the notice to proceed (NTP).

6. Work Hours: Normal work hours are Monday-Friday 7:30a.m. to 4:30a.m. All construction work will occur during normal business hours.

7. Type of Contract: This shall be a Firm Fixed Price Contract.

B. GENERAL REQUIREMENTS

1. The contractor shall provide the COR with a list of contractor employees expected to enter facilities. While on VA premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.

2. All contractor employees will be required to receive a VA issued badge prior to the start of work. Current badging process takes two separate trips to the VA. This is subject to change and contractor shall comply with rules, regulations, and procedures governing the conduct of personnel and the operation of the facility at no additional cost to the government. The contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COR. All contract personnel must properly display their access badges. Access badges must be worn at or above the waist (facing forward). The contractor’s employees must return the access badge(s) to the COR or designee when the work is complete.

3. All work will be done according to VA specifications, Design Guides, Infection Control guidelines and all applicable codes. The work will be structured to require minimum interruption of space function during construction. All work shall meet the most current edition of NFPA/Life Safety Code and comply with all applicable building codes.

4. Contractor is required to have all submittals approved before work can begin. The Government reserves the right to authorize the final style and color of any component prior to installation.

5. Contractor shall field verify all measurements.

6. It is the responsibility of the contractor’s personnel to park in the appropriate designated parking areas. Parking information shall be coordinated with each facility COR.

7. CAVHCS does not validate or make reimbursement for parking violations of the contractor’s personnel under any circumstance.

C. GOVERNMENT RESPONSIBILITIES

The Government shall be responsible for making the building available to Contractor during work hours. If there is a need for work to be done after hours, the Government will make arrangements for Contractor to have access to the building.

D. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

The contractor shall be required to comply with all security policies/requirements. All security policies/requirements must be met, and employees cleared prior to the contractor performing work under this contract. Employees that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.

E. INTERFERENCE TO NORMAL FUNCTION

Contractor may be required to interrupt their work at anytime so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment and carts.

1. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.

2. Contractor personnel shall inform the COR or the designee of the need to gain access to secured areas. If access is required to secure areas, prearranged scheduling will be made with COR or designee.

2.3 PROPOSAL PREPARATION AND EVALUATION INFORMATION

I. PROPOSAL SUBMISSION

This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under Federal Acquisition Regulation (FAR) Subpart 15.1 using the tradeoff process and evaluated in accordance with FAR Overhaul Subpart 15.2, Evaluation and Award. This section describes the method for evaluating and selecting offers for this procurement.

A. Proposal Submission:

1. Submit one (1) Electronic Proposal to the email addresses indicated on page 1, block 8 of Standard Form 1442. The Subject Line of the email should include “Company Name, RFP number, Project Title.”

2. The size of your file shall not exceed 10 MB. If you have multiple documents, please submit them as separate emails. Emails larger than this may be rejected by the network servers and will be considered non-responsive.

3. Interested firms are responsible for ensuring electronic submission delivery by the time and the date specified. It is highly recommended that interested firms confirm that the Contracting Officer has received electronic submissions. Failure to provide a proposal in its entirety before the deadline will render the proposal non-compliant.

B. Proposal Preparation and Format Instructions:

Offerors must provide all requested information for each factor. Proposals must address each element of each factor as applicable to be considered responsive to this RFP. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities.

Offerors’ proposals should consist of past performance and price proposals, as described below.

1. TAB A: General Information:

(1) Cover Page with Solicitation Number, Project Title

(2) Table of Contents

(3) Signed offer/Acknowledgement of Amendments (SF1442)

(4) Copy of current SDVOSB MySBA Certification.

(5) SAM UEI Number

(6) Offer Guarantee Bond (DO NOT SEND HARD COPY) Electronic copy acceptable and should be emailed to Point of Contact(s) listed on page 1, block 8.

(7) Safety or Environmental Violations and Experience Modification (EMR) Rate *Submit information regarding current experience modification rate form (See Attachment 1). An EMR of greater than 1.0 may disqualify the bidder/offeror.

(8) 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (Deviation), (See Attachment 2).

(9) Provide evidence of VETS-4212 Reporting (if applicable)

2. TAB B: Relevant and Recent Past Performance Experience

3. TAB C: Price Proposal

II. EVALUATION FACTORS

A. FACTOR 1 – RELEVANT AND RECENT PAST PERFORMANCE EXPERIENCE:

***Relevant is defined as performance similar or greater in scope, magnitude, and complexity than the effort described in this solicitation’s scope of work, to include work listed in the SOW, Drawings, and Specifications including (but not necessarily limited to) comprehensive repair and renovation of roofing systems, including asbestos remediation, lightning protection, and replacement of mechanical equipment for historically diverse buildings. This relevant work can be a portion of a larger requirement, which was issued by the VA, Federal, State, Local Government agencies, and/or commercial facilities.

***Recent is defined as performance within the last five (5) years, to include ongoing projects.

Proposal shall include:

https://certifications.sba.gov/

(1) Offeror must submit a minimum of one (1) but no more than three (3) references.

(2) The submission shall include a brief description of the project, the Contracting Officer’s Representative (COR) contact information for references, Contract Number, and Dollar Value.

(3) Provide a brief narrative describing the firm’s (primary and sub) specialized experience with work listed in this solicitation’s SOW, Drawings, and Specifications including (but not necessarily limited to) comprehensive repair and renovation of roofing systems, including asbestos remediation, lightning protection, and replacement of mechanical equipment for historically diverse buildings.

❖ Further note: If utilizing the past performance of a subcontractor, subcontractors identified in the proposal must remain on the contract for its duration unless there is a compelling reason to replace them. The prime contractor will need to obtain approval from the contracting officer before making changes to key subcontractors.

(4) Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.

(5) The Government will evaluate the offeror’s past performance on active and completed contracts. The Government will contact the offeror’s submitted references on contracts if deemed necessary. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to: Contract Performance Assessment Reporting System (CPARS) or other databases, past performance questionaries, and interviews with Program Managers, Contracting Officers, and/or Contracting Officer Representatives. The past performance evaluation will assess the relative risks associated with an offeror’s likelihood of success in performing the scope of work requirements as indicated by the offeror’s record of past performance.

(6) The following evaluation documents are acceptable:

a. Contractor Performance Assessment Report System (CPARS), or

b. Past Performance Questionnaire (PPQ) evaluation (Attachment 3).

(7) If a completed CPARS evaluation is available, it shall be submitted with the proposal. If using Attachment 3 PPQ, it should be emailed to the construction contract administrator of the entity (Government or civilian) for which the construction was completed and emailed to Gregory Snyder, at email gregory.snyder@va.gov, and CC: joyce.powers1@va.gov .

B. FACTOR 2 – PRICE PROPOSAL:

(1) Complete the price offer schedule in section A.3.

(2) Price shall be addressed using the attached price breakdown worksheet, which is included in Attachment 4 to include cost elements such as:

a) Labor (Direct & Indirect),

b) Materials, Material Markups, Materials overhead,

c) Equipment

d) Subcontractor Cost

e) Other Direct Costs

f) Overhead expenses

g) Indirect Cost

h) Profit

i) Bonds

j) Breakdown of G&A expenses inclusive of all project staff and general requirements of the Prime Contractor.

(3) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.

NOTE: Price breakdown shall be indicative of showing at least 25% percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73(d)(4).

III. EVALUATION CRITERIA/OVERVIEW

A. The evaluation is subjective based on the information provided in response to the information requested in the evaluation factors. Proposals will be evaluated on the basis of two evaluation criteria: Past Performance and Price. Past mailto:gregory.snyder@va.gov mailto:joyce.powers1@va.gov performance will be evaluated for relevancy and confidence levels. Past performance will be considered significantly more important than price.

B. The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources, including sources outside of the Government.

C. In evaluating relevant past performance, the government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming. The evaluation process will result in relevancy ratings of very relevant, relevant, somewhat relevant, or not relevant.

D. Past Performance Experience will be evaluated to assess recent and relevant past performance resulting in a performance confidence assessment rating. This evaluation will allow the government to assess the offeror’s ability to perform the effort described in this solicitation based on the offeror’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment rating of substantial confidence, satisfactory confidence, limited confidence, no confidence or neutral/unknown confidence.

E. The Government will evaluate price based on the total price and be evaluated for price reasonableness. Total price may include alternate bid items.

F. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described FAR Overhaul 15.202(a)(2)(i-iv)). Communication conducted to resolve minor or clerical errors would not constitute discussions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary.

Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a performance and price standpoint.

IV. BASIS FOR AWARD:

A. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation, will be most advantageous to the Government, past performance, and price considered. The proposals must conform to the RFP's requirements and be evaluated to represent the Best Value to the Government. The Best Value is the most advantageous offer, consistent with the Government's stated importance of evaluation criteria. This may result in award being made to a high-rated, higher-priced offeror where the Contracting Officer determines that it is worth the price premium to do so.

B. Offerors must provide all requested information for each factor. Proposals must separately address each of the factors as applicable to be considered responsive to this RFP. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities (Reference Proposal Preparation and Format Instruction).

C. To determine which proposal represents the best overall value, the Government will conduct a tradeoff analysis, comparing the strengths and weaknesses of the competing proposals to determine which proposal represents the best value to the Government and thus shall receive contract award.

D. The Government reserves the right to accept other than the lowest priced offer.

The right is also reserved to reject any and all offers. The basis of the award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.

E. Award will result in a firm-fixed-price contract. It is the Offeror’s responsibility to ensure the submitted price proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in prime and/or subcontractor proposals.

F. The Government evaluation team will consider all information provided in the proposal individually. Once these individual analyses are completed, the team will meet and determine a rating by consensus decision.

G. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

H. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation and for subsequent award.

I. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. Information obtained from government and commercial systems will be used to determine responsibility. Any information received by the Government that would be cause for an adverse Determination of Responsibility will make the offeror ineligible for award.

SDVOSB Verification: The Government will review SBA certification database (https://certifications.sba.gov/) to confirm Service-Disabled Veteran-owned Small Business (SDVOSB) status certification for the submitted proposals.

Evaluations will be performed on proposals submitted by verified SDVOSBs only.

Subsequent confirmation of SDVOSB certification status will be performed for the apparent award. For a Joint Venture to be considered eligible as an SDVOSB if the joint venture 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph 852.219-73(d) of the clause will be performed by the aggregate of the joint venture participants. Failure of a prospective SDVOSB to meet these certification requirements by the SBA shall result in elimination from consideration. Joint Venture -- Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:

1) have entered into a joint venture agreement that fully complies with paragraph

(c) of 13 CFR § 128.402; and

2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.

J. Limitations on Subcontracting Certificate. The prospective offeror must complete certification 852.219-75, VA Notice of Limitations on Subcontracting— Certificate of Compliance for Services and Construction (Jan 2023) (DEVIATION)

K. To be eligible for an award, if applicable, offerors must have submitted the required Federal Contractor Veterans’ Employment Report (VETS-4212 Report) with respect to the preceding fiscal year if the contractor was subject to the reporting requirements in accordance with 52.222-37.

L. Safety or Environmental Violations and Experience Modification Rate (EMR):

https://veterans.certify.sba.gov/

a. Offerors shall submit information pertaining to their past Safety and

Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

b. Offerors shall submit information regarding their current Experience

Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, the Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

c. Self-insured contractors or other contractors who cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation.

d. Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

e. If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, the Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.

f. The above information, along with other information obtained from

Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

g. This requirement applies to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

2.4 GENERAL SOLICITATION INFORMATION

I. GENERAL PROPOSAL INFORMATION

A. PROPOSAL MATERIALS

Proposal materials consisting of drawings, specifications, contract forms, and any issued Amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained, and updates are posted. No ‘hard copy’ proposal materials are available.

B. WAGE DETERMINATION:

Wages for all contractors and subcontractors must comply with Construction Wage Rate Requirements (Reference 52.222-6 for further information). The current determination is General Decision AL20260078 from 1/2/2026, Attachment 5. Be advised the determination that is current at the time of the contract award is the determination that will apply to the contract. Current determinations are always available at https://sam.gov.

II. DATABASE REGISTRATION INFORMATION

A. SYSTEM FOR AWARD MANAGEMENT REGISTRATION

The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system.

Please Note: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting Officers will not consider these http://www.sam.gov/ https://sam.gov/ http://www.sam.gov/ representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

B. THE EXCLUDED PARTIES LIST SYSTEM (EPLS)

To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person or business providing services under this contract.

During the performance of this contract, the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

C. VETS-4212 REPORTING REQUIREMENT

Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year.

Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C.

4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process.

For more information on this requirement and/or for completing the web-based reporting form, visit https://www.dol.gov/agencies/vets/programs/vets4212.

Certifications and Other Statements of Offerors, and RFO clause 52.222-37, Employment Reports on Veterans (JUN 2020) under the General Conditions.

III. BONDING INFORMATION

A. BID GUARANTEE

A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount by the proposal submission date and time shall require rejection in all cases except those listed in the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 28.101-4. Bid Bonds must be http://www.sam.gov/ http://www.dol.gov/agencies/vets/programs/vets4212 provided using Standard Form 24 (see RFO 28.106-1), and the form must be a scanned copy of an original (no whiteouts, clear signatures, seals must be evident and visible) and contain the proper solicitation number, proposal due date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see RFO 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.

B. PERFORMANCE AND PAYMENT BONDS

In accordance with Contract Clause 52.228-15 and RFO 28.102, Contractors are reminded that any amount awarded between $35,000.00 to $150,000 shall require a Payment Bond (SF 25A) or an Irrevocable Letter of Credit (ILC), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award as instructed by the contracting officer. The bonds shall contain no whiteouts or other corrections. Payment and Performance bonds are required in the penal sum of 100% of the contract's price.

IV. SECURITY/BADGING

A. Contractor employee (s) may be required to obtain security screenings and/or ID badges for employees through VA prior to the start of any work on site depending upon length of work time on site. The contractor must coordinate badge requests with the respective Contracting Officer Representative (COR). Any PIV Badging requires two (2) trips to a VA facility and the time required to complete the necessary paperwork. One trip is for completing the electronic fingerprinting, and the other to pick up the PIV Badge.

B. ROSTER: Within 15 days after issuance of the notice to proceed or as agreed to with the Contracting Officer, the Contractor should provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigation.

C. FORMS: Contractor personnel will need to complete the forms listed below depending upon the length of facility access needed:

D. Employee access for less than 6 months: Fingerprint request form (PIV Office Fingerprint Request Form (Updated 3-1-2020)) and SAC form (SAC FORM (NEW))

Any VA PIV facility can take fingerprints; not necessarily where the work is to be performed.

E. Employee access for les greater than 6 months: Fingerprint request form, SAC form, Contractor Background Investigation Request (Contractor Background Investigation Request Form 06-03-2021), OPM optional form 306 (of306) Personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC). Emails will be sent to employees requiring completion.

F. BADGING STEPS: After completing forms, the following steps need to be followed to obtain a badge.

1) Fingerprints: Need to schedule fingerprinting in coordination PIV Office.

Fingerprint request form and SAC form must be brought to the PIV office along with two forms of valid ID when Contractor gets fingerprinted. Contractor informs COR of employees that have been fingerprinted and sends COR all the required forms. Only electronic fingerprints are authorized.

2) Adjudication: COR submits the paperwork to the required office for adjudication. COR receives confirmation that the Contractor is favorably adjudicated, or contractor answers follow up questions. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.

3) Sponsor: COR will let the Contractor know when they have been sponsored.

4) Badging: Contractor schedules an appointment using https://portal.usaccess.gsa.gov/scheduler. Note: This link is best used in Google Chrome. Contractor personnel must bring two forms of valid ID when picking up a badge.

C. COMPLIANCE: Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to the VA Facility and systems by Contractor and Subcontractor employees.

Employees must follow all HSPD-12 policies and procedures and use and protect https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fportal.usaccess.gsa.gov%2Fscheduler&data=05%7C02%7C%7Ce36d9f33ce144b6c603b08dd131b1f72%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638687729419852310%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=UymXGgaOPR20eif3lR%2FO4vYKb1afhgI%2FRc8tWiLs%2FQw%3D&reserved=0 their assigned identity credentials per VA policies and procedures, display their badges at all times, and return the identity credentials upon termination of their relationship with VA.

D. PIV Badges are required for work to be performed on any CAVHCS facility.

NOTE: VA SECURITY PROCEDURES ARE SUBJECT TO CHANGE WITHOUT NOTICE.

V. INVOICES:

A. All payments by the Government to the contractor will be made in accordance with: RFO 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

B. Invoices shall be submitted per RFO 52.232-5 Payments under Fixed-Price

Construction Contracts (May 2014) and 852.232-70 Payments Under Fixed-Price Construction Contracts (Without NAS-CPM) (NOV 2018). For detailed instructions, refer to Attachment 6 Invoicing.

2.5 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (NOV 2025) (DEVIATION)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American— Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding;

or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.8 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under

Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.9 52.233-2 SERVICE OF PROTEST. (SEP 2006) (DEVIATION NOV 2025)

(a) Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them.

(b) The copy of any protest must be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

2.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND

CERTIFICATIONS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this provision—

Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.

Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.

Marginalized populations of Sudan means—

(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note);

and

(2)…

This is the start of the file's text. The full file is on GovTribe.