This file is a Requests for Information (RFI) Responses document for solicitation 36C24726R0038, addressing clarifications submitted by contractors regarding the Y1DZ--619-CSI-904 Site Modification for Symbia EVO project at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7.

The responses address five key technical clarifications: (1) commissioning requirements are not needed for mechanical and plumbing systems, though Testing, Adjusting, and Balancing (TAB) work is required; (2) updated drawings have been provided to correct a truncated sheet data display on page 7 of the original drawings; (3) complete specifications for Divisions 26 and 27 have been provided as updated attachments, with the original documents incorrectly jumping from Division 23 to Division 28; (4) additional electrical and technology drawings have been provided, including specifications for a new fire alarm pull station on a new wall with final location to be determined by the Contracting Officer and Fire Department per drawing ED100; and (5) data cable relocations will be upgraded from CAT 5/6 to CAT 6A standards. This RFI response document was released as Amendment 0005 on 27 February 2026 to support contractor proposal preparation for the receipt of offers deadline.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

619-CSI-904 - Requests for Information (RFI) Page | 2

1. There are no 01 91 00 mentions in the bid documents. Please advise is the third-party commissioning needed and hired by the general contractor.

1. No commissioning is needed for mechanical and plumbing, but TAB will still need to be completed.

2. Sheet Pg. 7 of the Drawings PDF is truncated, and the “Sheet Data” is not viewable. Could we get a scan of that page with the “Sheet Data” visible please?

1. Updated drawings are provided as an attachment.

3. The Specifications provided do not contain Specifications for Division 26 & 27. They jump from Division 23 to Division 28. Can you please provide a complete set or reasoning?

1. Updated specification is provided as an attachment.

4. There are no electrical sets or technology sets. Can these be provided?

1. Extra drawings have been provided.

4a.) If they can be provided, will they also include the new fire alarm pull station?

New fire alarm pull station should be located on new wall according to drawing ED100. If specific location is needed on new wall COR/Fire department will determine this.

5. Will the data relocations upgrade cable from cat 5/6 to Cat6A?

Cable should be upgraded to CAT 6A.