This document is an Amendment (0002) to a VA solicitation for a construction project at a Veterans Health Administration facility. The solicitation (36C24726R0038) involves site modifications for a Symbia EVO medical imaging system, requiring demolition, installation of lead-lined walls, electrical, mechanical, and plumbing modifications with full coordination for vendor-specific equipment requirements. The project is located in the VISN 7 Network and requires completion within 250 calendar days from Notice to Proceed, with work to be performed in compliance with VA Master Specifications, Design Guides, NFPA Life Safety Code, ASHRAE Standards, and ICRA procedures. The amendment specifically corrects a discrepancy in the original Price Offer Schedule, with a single award to be made based on available funding, and requires contractors to submit an itemized cost breakdown using Attachment 4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 Updated Specifications 619-CSI-904 Combined Set.pdf | ||
| 36C24726R0038 0005.docx | DOCX document | |
| Attachment 8 Update Drawings 619-CSI-904 2-19-26.pdf | ||
| Attachment 10 RFI Responses.docx | DOCX document | |
| 36C24726R0038 0004.docx | DOCX document | |
| 36C24726R0038 0003.docx | DOCX document | |
| Attachment 9 - Site visit attend.pdf | ||
| 36C24726R0038 0001.docx | DOCX document | |
| Attachment 3 - Past Performance Questionnaire -PPQ.pdf | ||
| Attachment 7 - Specifications - Symbia Evo - 619-CSI-904.pdf | ||
| Attachment 8 - Drawings.zip | ZIP file | |
| Attachment 1 - Experience Modification Rate Form.pdf | ||
| Attachment 2 - SBA Vet SB Cert Program Class Dev.pdf | ||
| Attachment 5 - Wage Determinations.pdf | ||
| 36C24726R0038.docx | DOCX document | |
| Attachment 4 - Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 6 - INVOICING.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
01-15-2026
619-CSI-904
36C247 Department of Veterans Affairs VISN 7 Network Contracting Office 215 Perry Hill Road Montgomery, AL 36109
36C247 Same as block 6
To all Offerors/Bidders
36C24726R0038
X
The purpose of this amendment 0002 is as follows:
To correct a discrepancy involving the Price Offer Schedule included in the original solicitation. The correct document has been added as an attachment to this amendment. Please disregard the original Price Offer Schedule on page 8 of the 36C24726R0038 solicitation document.
All other terms and conditions remain unchanged.
Joseph Osborn
VA-VHA-RPOE-2022-235705
A.1 PRICE OFFER SCHEDULE
| Description |
| U/I |
| QTY |
| UNIT PRICE |
| TOTAL PRICE |
The contractor shall furnish all labor, materials, equipment, and supervision necessary to perform the work as shown on the construction drawings and specified herein. Work includes demolition, installation of new lead-lined walls, electrical, mechanical, and plumbing modifications, and full coordination with Siemens vendor-provided equipment requirements. All work shall comply with VA Master Specifications, VA Design Guides, NFPA Life Safety Code, ASHRAE Standards, and ICRA procedures.
Completion Time: 250 Calendar Days from Notice to Proceed (NTP)
JB
A single award will be made on line item 1 for which funds are determined available.
The Period of Performance includes submittal phase and the completion of all punch list items.
ATTACH YOUR ITEMIZED COST BREAKDOWN: Offerors are to include a construction price/cost breakdown using Attachment 4.