This is a Statement of Work (SOW) for Emergency Room Generator Preventive Maintenance contract services at a Department of Veterans Affairs facility under Veterans Integrated Service Network 7. The contract requires comprehensive preventive maintenance and repair services for emergency room generator systems to ensure operational readiness and compliance with federal regulations. The contractor must perform scheduled maintenance tasks including inspections, testing, lubrication, parts replacement, and documentation of all service activities in accordance with manufacturer specifications and applicable codes.
The work scope includes responding to emergency service calls with defined response times, maintaining spare parts inventory for critical components, providing technical support to facility personnel, and generating detailed maintenance reports. The contractor is responsible for coordinating with VA facility management, scheduling maintenance activities to minimize operational disruption, and ensuring all work meets VA quality and safety standards. Performance metrics include equipment uptime requirements, completion of preventive maintenance cycles on schedule, and documentation of all corrective actions. The contract is awarded through the General Services Administration (GSA) schedule vehicle, allowing for flexibility in service delivery while maintaining federal procurement compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24726Q0743 0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24726Q0743
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
534-26-4-5088-0086 36C24726Q0743 07-20-2026 Marcus Watts 334-725-3166 07-31-2026 1:00
EDT
Department of Veterans Affairs Central Alabama Health Care System 215 Perry Hill Road Montgomery
AL
36109-3798 X X 811310 $12.5 Million N/A X Department of Veterans Affairs Ralph H. Johnson VA Medical Center 109 Bee Street Charleston
SC
29401-5799 Department of Veterans Affairs Central Alabama Health Care System East Campus 2400 Hospital Road Tuskegee
AL
36083-5001
Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin
TX
78714-9971 See CONTINUATION Page Contractor shall provide Quarterly Preventive Maintenance and repair services for Emergency Generators at the Ralph H Johnson VA Medical Center (VAMC) IAW the performance work statement.
This is a Service-Disabled Veteran Owned Small Business set-aside.
VA Notice of Limitations on Subcontracting - Certificate of Compliance: To be eligible for evaluation and consideration for award, offerors must return the entire Limitations on Subcontracting Certificate of Compliance clause containing a fully completed certification at the time offers are due or the offer will be rejected and not forwarded for evaluation.
In addition to completing the offeror ‘fill-in’ requirements for this clause, offerors must insert the offeror’sname in the brackets containing the following verbiage “[Insert Name of Offeror]” to have a fully completed certification.
See CONTINUATION Page 534-3660162-5088-851100-2543 0100J0092 X x Marcus Watts Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 PRICE/COST SCHEDULE | 10 |
| ITEM INFORMATION | 10 |
| SECTION C - CONTRACT CLAUSES | 13 |
| C.1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 13 |
| C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 13 |
| C.3 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV 2025) (DEVIATION) | 13 |
| C.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 14 |
| C.5 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS-PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) (NOV 2025) (DEVIATION) | 14 |
| C.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 15 |
| C.7 52.223-23 SUSTAINABLE PRODUCTS (NOV 2025) (DEVIATION) | 16 |
| C.8 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 17 |
| C.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 20 |
| C.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 23 |
| C.11 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 25 |
| C.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| C.13 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 26 |
| C.14 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 27 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 28 |
| SECTION E - SOLICITATION PROVISIONS | 39 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION) | 39 |
| E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 40 |
| E.3 52.233-2 SERVICE OF PROTEST (SEP 2006) | 41 |
| E.4 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 42 |
| E.5 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 46 |
| E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 47 |
| E.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 47 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
Left Blank Intentionally
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C247 Marcus Watts Department of Veterans Affairs Central Alabama Health Care System
215 Perry Hill Road Montgomery AL 36109-3798
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [x] Monthly Upon Approved Invoices |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Page 1 of Page 1 of Emergency Generator Preventative Maintenance Base Plus 4 Performance Work Statement
1. Introduction: The purpose of this Performance Work Statement (PWS) is to define the requirements for preventative maintenance and repair services for Emergency Generators at the Ralph H. Johnson VA Medical Center (4) and Fisher House (1), Charleston SC.
2. Scope of Work: The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. This shall include inspections, testing, maintenance, diagnostics, troubleshooting, emergency repairs, and documentation necessary to maintain generators in safe and operational conditions in accordance with manufacturer recommendations and applicable industry standards.
The Contractor shall perform all work in accordance with:
· NFPA 110-Standard for Emergency and Standby Power Systems
· NFPA 99- Health Care Facilities Code
· NFPA 70- National Electrical Code
· NFPA 70E- Electrical Safety in the Workplace Manufacturer Recommendations
· State and local codes
· Hospital accreditation requirements
3. Equipment to be Serviced:
a. CAT 3512 Generator Set S/N SBG00620 (RHJVAMC)
b. CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
c. CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
d. Generac IDLC750 S/N 3001722305 (RHJVAMC)
e. Kohler 150ERTERSC S/N SGM32P7tz (FH)
4. Preventative Maintenance Requirements:
The Contractor shall perform quarterly preventative maintenance inspections and services on each generator. Task shall include, at a minimum:
a. Engine System:
i. Check engine oil level and conditions
ii. Inspect for leaks, corrosion, and damage
iii. Replace oil and filters as recommended by manufacturer schedules
iv. Inspect belts, hoses, clamps, and mounts
v. Inspect air intake systems
vi. Inspect crankcase ventilation systems
vii. Verify proper engine operating parameters
b. Fuel System:
i. Inspect fuel lines, fittings, and tanks
ii. Check fuel levels and fuel quality
iii. Inspect fuel filters and replace as required
iv. Verify proper operation of fuel transfer equipment
v. Inspect for contamination, leakage, and deterioration
c. Cooling System:
i. Check coolant level and concentration
ii. Inspect radiator and cooling components
iii. Inspect water pump and hoses
iv. Verify proper operating temperature
d. Electrical System:
i. Inspect wiring and electrical connections
ii. Test battery charger operations
iii. Inspect battery terminals and cables
iv. Measure battery voltage condition
v. Clean terminals as required
e. Generator Controls:
i. Inspect alternator condition
ii. Verify voltage and frequency output
iii. Test safety shutdown devices
iv. Inspect control panels and alarms
v. Verify remote monitoring functions, if applicable
vi. Test alarms and shutdown functions
5. Operational Testing:
Monthly Testing Support: Upon request from the Ralph H, Johnson VAMC, the contractor shall assist facility personnel with required monthly generator testing.
a. Quarterly Load Testing: Each generator shall be operated under load and evaluated for:
i. Voltage stability
ii. Frequency stability
iii. Oil Pressure
iv. Coolant temperature
v. Battery charging rate
vi. Engine performance
vii. Exhaust condition Testing shall comply with NFPA 110 requirements
b. Annual Load Bank Testing:
If required by NFPA 110 or Ralph H, Johnson VAMC policy, contractor shall perform annual load bank testing and submit a detailed report documenting:
i. Load percentages achieved
ii. Operating temperatures
iii. Generator performance
iv. Deficiencies identified
6. Emergency Repair Services:
a. Emergency Response For failures affecting emergency power capability:
| Priority |
| Response Time |
| Critical Hospital Emergency |
| Within 2 Hours |
| Generator Inoperable |
| Within 4 Hours |
| Non-critical Repair |
| Within 24 Hours |
Emergency service shall be available 24 hours per day, 7 days per week, 365 days per year.
7. Repair Requirements:
a. Diagnose system failures
b. Provide written repair recommendations
c. Replace defective components
d. Restore equipment to manufacturer specifications
e. Verify proper operation after repairs
f. Perform retesting following repairs Contractor shall keep Recommended Spares Inventory (RSI), Consumables, Critical Wear Components, Long-Lead Items, and Preventative Maintenance components on hand.
No repairs exceeding the contract-authorized threshold shall be performed without written approval from the Contracting Officer or Facility Manager.
8. Documentation and Reporting:
The contractor shall provide a written report within five (5) business days following each service visit.
a. Name of Contractor
b. Name of employee who performed services
c. Date, time (starting and ending), equipment downtime, and hours on-site for service call
d. VA purchase order number (Using the incorrect number could delay processing of invoices)
e. Identification of equipment to be serviced: ID number, manufacturers name, model, and serial numbers, room location, and any other manufacturer’s identification numbers
f. Itemized description of services performed including repairs performed, parts replaced, and documenting discrepancies, systems impairments, and recommendations
g. Signature of employee(s) performing the services and the VA employee who witnessed the services described.
h. Work shall be performed by contractor personnel who are qualified to complete work as outlined in this performance work statement (PWS). Contractor personnel shall have training and experience that demonstrate proficiencies in understanding the function, hazards, theory, and maintenance of the equipment listed in this performance work statement. Contractor personnel performing work under this contract shall be OSHA certified.
i. VA personnel will be responsible for racking out of main breakers and racking them back in.
9. Performance Standards:
| Performance Requirements |
| Standard |
| Quarterly PM Completion |
| 100% On Schedule |
| Emergency Response |
| ≤ 2 hours Critical Events |
| Service Reports |
| Within 5 business days |
| Hospital Generator Availability |
| 99% Operational Readiness |
| NFPA Compliance Documentation |
| 100% |
| Safety Compliance |
| Zero Standards |
10. Contractor Qualifications:
Technicians performing work shall:
a. Be factory-trained or equivalent on installed generator equipment
b. Have a minimum of three (3) years of experience servicing hospital-grade emergency power systems
c. Be qualified to work on emergency power systems in healthcare facilities
d. Maintain applicable state licenses and certifications
11. Deliverables:
The Contractor shall provide:
a. Four (4) quarterly preventative maintenance visits annually
b. Detailed maintenance reports after each visit
c. Emergency Repair Services
d. Annual equipment condition assessment
e. Compliance documentation supporting hospital accreditation surveys and inspections
f. Annual summary report identifying lifecycle concerns, major repairs, and capital replacement recommendations
12. Safety and Compliance
a. The contractor shall adhere to VA safety policies and OSHA regulations.
b. Personal protective equipment (PPE) shall be used at all times during work activities.
c. The contractor shall coordinate with VA personnel to minimize disruption to hospital operations.
d. Infection Control Requirements shall be followed in accordance with an Infection Control Risk Assessment (ICRA). Dust, dirt, and debris shall be contained appropriately when working inside patient care and admin space areas. If it is determined that an Infection Control permit will be necessary, contractor will follow all guidelines set forth in the permit and report daily observance to COR.
13. Hours of Work
a. Normal working hours are 0700 – 1700 Monday to Friday, except for federal holidays. All work during normal hours shall be completed at the end of that working day. Some work may need to take place during after-hours (1700 – 0700) or during weekends. Contractor shall provide a detailed schedule to meet the requirements. All schedules and work hours shall be requested, coordinated, and approved through the COR.
14. Period of Performance
a. The contractor shall complete all work within one year from the start date, as agreed upon with the VA contracting officer.
RECORDS MANAGEMENT AND CONTRACT SECURITY
A. Contractor shall comply with VA Handbook 6300.1 Records Management Procedures and VA Handbook 6500.6 Contract Security. Both can be found at:
https://www.va.gov/vapubs/search_action.cfm?dType=2 **Note: This link is the complete list of VA Handbooks and are in sequential order.
**Instructions for accessing VA Handbooks at link listed above:
• Click on link above and once it is opened, please scroll down on the left side until you get to VA Handbook 6300.1.
• Once there, go to the PDF Format Column and click on PDF.
• VA Handbook 6300.1 will then ask you to open or save the document.
B. Please follow the same instructions listed above for accessing VA Handbook 6500.6.
All contractor employees working on this requirement are required to complete mandatory annual training entitled, “VA Privacy and Information Security Awareness” and “HIPPA Training” prior to providing service for each year of the contract with copies sent to the COR for each and available for audit as requested. The course numbers are VA10203 and VA 10176. You must select that you are a contractor. Contractor employees are to self-enroll into TMS via the link: https://www.tms.va.gov/learning/user/SelfRegistrationUserSelection.do A VA employee will escort the contractor when contractor is required to enter/work in sensitive areas.
B9. IDENTIFICATION, SMOKING AND VA REGULATIONS
The Contractor's FSE shall wear visible identification always while on the premises of the Charleston VA Medical Center. Contractor shall contact the Contracting Officer’s Representative (COR) upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract. Charleston VA Medical Center is a smoke free campus which includes both tobacco and e-cigarettes; tickets can be issued by Police Services. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court. Photography or Video on medical center premises is strictly prohibited. Additionally, pursuant to 38 CFR 1.218(b) (23) Use of recording devices of any kind to record patients or employees is strictly prohibited.
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4.00 |
| QT |
| __________________ |
| __________________ |
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. See PWS for details.
(1) CAT 3512 Generator Set S/N SBG00620 (RHJVAMC)
(2) CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
(3) CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
(4) Generac IDLC750 S/N 3001722305 (RHJVAMC)
(5) Kohler 150ERTERSC S/N SGM32P7tz (FH)
Contract Period: Base POP Begin: 09-01-2026 POP End: 08-31-2027
LOCAL STOCK NUMBER: SERVICE
| 4.00 |
| QT |
| __________________ |
| __________________ |
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. SEE PWS FOR DETAILS.
(2) CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
(3) CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
(4) Generac IDLC750 S/N 3001722305 (RHJVAMC)
(5) Kohler 150ERTERSC S/N SGM32P7tz (FH)
Contract Period: Option 1 POP Begin: 09-01-2027 POP End: 08-31-2028
| 4.00 |
| QT |
| __________________ |
| __________________ |
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. SEE PWS FOR DETAILS.
(2) CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
(3) CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
(4) Generac IDLC750 S/N 3001722305 (RHJVAMC)
(5) Kohler 150ERTERSC S/N SGM32P7tz (FH)
Contract Period: Option 2 POP Begin: 09-01-2028 POP End: 08-31-2029
| 4.00 |
| QT |
| __________________ |
| __________________ |
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. SEE PWS FOR DETAILS.
(2) CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
(3) CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
(4) Generac IDLC750 S/N 3001722305 (RHJVAMC)
(5) Kohler 150ERTERSC S/N SGM32P7tz (FH)
Contract Period: Option 3 POP Begin: 09-01-2029 POP End: 08-31-2030
| 4.00 |
| QT |
| __________________ |
| __________________ |
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform quarterly preventative maintenance and repair services for Emergency Generators and associated equipment. SEE PWS FOR DETAILS.
(2) CAT 3512 Generator Set S/N SBG00621 (RHJVAMC)
(3) CAT 3512 Generator Set S/N SBG00622 (RHJVAMC)
(4) Generac IDLC750 S/N 3001722305 (RHJVAMC)
(5) Kohler 150ERTERSC S/N SGM32P7tz (FH)
Contract Period: Option 4 POP Begin: 09-01-2030 POP End: 08-31-2031
| GRAND TOTAL |
| __________________ |
VA247-13-C-0189
VA247-13-C-0189
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of Clause)
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years..
(End of Clause) C.3 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV 2025) (DEVIATION)
(a) Equal opportunity clause. The Contractor must abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor must include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1401-2(a)(1) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor must act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of Clause)
C.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
| Employee Class |
| Monetary Wage-Fringe Benefits |
(End of Clause) C.5 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS-PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) (NOV 2025) (DEVIATION)
(a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements.
(b) The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(c) The wage determination, issued under the Service Contract Labor Standards statute, (41 U.S.C. chapter 67), by the Administrator, Wage and Hour Division, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract. If no such determination has been made applicable to this contract, then the Federal minimum wage as established by section 6(a)(1) of the Fair Labor Standards Act of 1938, as amended, (29 U.S.C. 206) current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract.
(d) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect the Contractor's actual increase or decrease in applicable wages and fringe benefits to the extent that the increase is made to comply with or the decrease is voluntarily made by the Contractor as a result of:
(1) The Department of Labor wage determination applicable on the anniversary date of the multiple year contract, or at the beginning of the renewal option period. For example, the prior year wage determination required a minimum wage rate of $4.00 per hour. The Contractor chose to pay $4.10. The new wage determination increases the minimum rate to $4.50 per hour. Even if the Contractor voluntarily increases the rate to $4.75 per hour, the allowable price adjustment is $.40 per hour;
(2) An increased or decreased wage determination otherwise applied to the contract by operation of law; or
(3) An amendment to the Fair Labor Standards Act of 1938 that is enacted after award of this contract, affects the minimum wage, and becomes applicable to this contract under law.
(e) Any adjustment will be limited to increases or decreases in wages and fringe benefits as described in paragraph (d) of this clause, and the accompanying increases or decreases in social security and unemployment taxes and workers' compensation insurance, but must not otherwise include any amount for general and administrative costs, overhead, or profit.
(f) The Contractor must notify the Contracting Officer of any increase claimed under this clause within 30 days after receiving a new wage determination unless this notification period is extended in writing by the Contracting Officer. The Contractor must promptly notify the Contracting Officer of any decrease under this clause, but nothing in the clause shall preclude the Government from asserting a claim within the period permitted by law. The notice must contain a statement of the amount claimed and the change in fixed hourly rates (if this is a time-and-materials or labor-hour contract), and any relevant supporting data, including payroll records, that the Contracting Officer may reasonably require. Upon agreement of the parties, the contract price, contract unit price labor rates, or fixed hourly rates must be modified in writing. The Contractor must continue performance pending agreement on or determination of any such adjustment and its effective date.
(g) The Contracting Officer or an authorized representative must have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor until the expiration of 3 years after final payment under the contract.
(End of Clause) C.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) (a)Definitions. As used in this clause— Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.
Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.
(b) In connection with the performance of work under this contract, the Contractor agrees as follows:
(1) The Contractor will not engage in any racially discriminatory DEI activities;
(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;
(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;
(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and
(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.
(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).
(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
(End of Clause)
C.7 52.223-23 SUSTAINABLE PRODUCTS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this clause— Sustainable products means—
(1) A product that contains recovered material designated by the EPA under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).
(2) An energy-efficient product or low standby power device (42 U.S.C. 8259b) (10 CFR part 436, subpart C) (https://www.energy.gov/femp/search-energy-efficient-products, https://www.energystar.gov/products?s=mega, and https://www.energy.gov/femp/low-standby-power-product-list).
(3) A biobased product that meets the content requirements of the USDA under the BioPreferred® program (7 U.S.C. 8102) (7 CFR Part 4270) (https://www.biopreferred.gov/)
(4) A substance identified in the EPA’s Significant New Alternatives Policy (SNAP) program as a safe alternative to an ozone-depleting substance (42 U.S.C. 7671l) (40 CFR part 82, subpart G) (https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables).
(b) Requirements. The Government has identified in the statement of work or elsewhere in the contract the sustainable products that are required during the performance of this contract. The Contractor shall ensure that it provides sustainable products as required by this contract, when the products are—
(1) Delivered to the Government;
(2)Furnished for use by the Government;
(3) Incorporated into the construction of a public building or public work; or
(c) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract.
(End of Clause) C.8 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)
(a) The Contractor shall comply with current Department of Veterans Affairs policy for personal identity verification of all employees performing under this contract when frequent and continuing access to VA facilities or information systems is required.
(b) The Contractor shall insert this clause in all subcontracts when the subcontractor’s employees will require frequent and continuing access to VA facilities or information systems.
(End of Clause) [852.204-72, Personnel Vetting and Credentialing.
Personnel Vetting and Credentialing. (MARCH 2026)
(a) Definitions. As used in this clause – VA Information system is the same as information system and means, pursuant to 38 U.S.C. 5727, a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information whether automated or manual. VA sensitive information means all VA data, on any storage media or in any form or format, which requires protection due to the risk of harm that could result from inadvertent or deliberate disclosure, alteration, or destruction of the information and includes sensitive personal information. The term includes information where improper use or disclosure could adversely affect the ability of VA to accomplish its mission, proprietary information, records about individuals requiring protection under various confidentiality provisions such as the Privacy Act and the HIPAA Privacy Rule, and information that can be withheld under the Freedom of Information Act. Examples of VA sensitive information include the following: individually-identifiable medical, benefits, and personnel information; financial, budgetary, research, quality assurance, confidential commercial, critical infrastructure, investigatory, and law enforcement information; information that is confidential and privileged in litigation such as information protected by the deliberative process privilege, attorney work-product privilege, and the attorney-client privilege; and other information which, if released, could result in violation of law or harm or unfairness to any individual or group, or could adversely affect the national interest or the conduct of Federal programs.
(b) General. Contractor personnel assigned to work for or on behalf of VA must undergo a background investigation commensurate with the risk and sensitivity level designation associated with the work to be performed at the level indicated in the contract. The Contractor and subcontractors shall comply with VA Directive/Handbook 0710, Personnel Security and Suitability Program, which can be accessed at: https://vaww.va.gov/vapubs/index.cfm
(c) Risk and Sensitivity Levels. The following table identifies the risk and sensitivity levels that apply to any personnel providing services under this contract. *VA Administrations, organizations and staff offices will use the OPM Position Designation Tool. Positions/Tasks Designated as Non-Sensitive Positions - Tier 1/Low Risk
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]
Positions/Tasks Designated as Non-Sensitive Positions - Tier 2/Mod Risk
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]
Positions/Tasks Designated as Non-Sensitive Positions - Tier 4/High Risk
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]
[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Ris
Security clearances are granted to individuals with a specific requirement for access to classified material (for example, Confidential, Secret and Top Secret). Contractor personnel that are required to obtain a security clearance will be subject to a Tier 3 or Tier 5 investigation. The following sensitivity designations have been assigned for the identified Tier 3 and Tier 5 required by this contract: Tier 3: [Contracting Officer to enter “Non-Critical” or “Not Applicable” if no positions are identified as Tier 3] Tier 5: [Contracting Officer to enter either Critical Sensitive and/or Special Sensitive, or “Not Applicable” if no positions are identified as Tier 5]
(d) Fitness. The results from a background investigation are used to determine if an individual’s fitness is sufficient for that individual to perform work for or on behalf of VA in the position identified in this contract. Contractor fitness determinations are made in accordance with 5 CFR Part 731.202. Fitness requirements for employment are separate and distinct from job qualifications. If a Contractor or subcontractor employee is found to be unsuitable or unfit to provide services under this contract, the Contractor shall immediately remove the employee from working on this contract and take those necessary steps that restrict the employee’s logical access to VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information.
The Contractor shall advise the employee that they are not permitted to access any VA controlled building or real property in relation to this contract. The removal of an unfit Contractor or subcontractor employee does not alleviate the Contractor from satisfying the requirements of this contract. The Government will not reimburse the Contractor for any costs associated with the recruitment/replacement of an employee or subcontractor employee who is found to be unfit.
(e) Identification Cards. The Government will provide a Personal Identification Verification (PIV) card or other identification card, as necessary, to fit Contractor personnel who require physical access to VA facilities and/or logical access to VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information. Contractor and subcontractor personnel shall prominently display their PIV/identification card on their persons while working at a VA facility and shall present their PIV/identification card for inspection upon request by a VA official. The Contractor must surrender the employee or subcontractor employee’s PIV/identification card in accordance with the requirements set forth in Directive/Handbook 0735 when any of the following events occur: 1. When no longer needed for contract performance.
2. Upon completion of the Contractor/subcontractor employee’s employment.
3. Upon contract completion or termination.
(f) Lost/stolen. Immediately upon detection, the Contractor shall report a lost or stolen PIV/identification card to the Government authorities as identified in Directive/Handbook 0735. Within 48 hours of reporting the lost/stolen PIV/identification card, the Contractor shall submit to the Program Manager an incident report that describes the relevant facts and circumstances regarding the loss/theft. If the loss/theft was reported by the Contractor to the local police, the Contractor shall further submit a copy of the final police report to the Program Manager within 48 hours of the report being made available by the local police department. The Government will not reimburse the Contractor for any costs that result from lost/stolen PIV/identification card(s).
(g) Regular Reporting. The Contractor shall submit a status report to PIV Sponsor within 5 working days after the end of each calendar quarter and as requested by the Government in order to initiate contract closeout procedures. The report must provide the status of each contractor/subcontractor employee who is required to have a PIV/identification card during the performance of the contract. The report shall identify the Contractor and the contract number, and list the following status for each contractor/subcontractor employee who holds a PIV/identification card under this contract:
1. Contractor/subcontractor employee name.
2. Name of VA facility where Contractor/subcontractor employee works, if applicable.
3. Date background check submitted for Contractor/subcontractor employee.
4. Date PIV/identification card issued to Contractor/subcontractor employee.
5. Contractor/subcontractor employee’s PIV/identification card number, as applicable.
6. Date Contractor/subcontractor employee no longer has need for PIV/identification card. 7. Date Contractor notified VA that PIV/identification card is no longer required.
8. Date Contractor returned PIV/identification card was returned to VA.
(h) Flow down of clause. The Contractor shall include the substance of this clause in subcontracts, third-party agreements, and BAA’s, in which subcontractors, third-party servicers/employees, and business associates will perform functions where they will have physical access to a VA facility or logical access to VA data, information, VA sensitive information, or information technology or VA information system containing such data or informormation.
C.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)
(a) Definition. for the Department of Veterans Affairs, ‘‘Service-disabled Veteran-owned small business concern or SDVOSB’’:
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR 802.201, Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been certified for ownership and control pursuant to 38 U.S.C. 8127, 13 CFR 128, and is listed as certified in the SBA certification database at https://veterans.certify.sba.gov/; and
(v) The business agrees to comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size, government contracting, and the Veteran Small Business Certification Program at 13 CFR parts 121, 125, and 128.
(2) The term ‘‘Service-disabled Veteran’’ means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(3) The term ‘‘small business concern’’ has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).
(4) The term ‘‘small business concern owned and controlled by Veterans with service-connected disabilities’’ has the meaning given the term ‘‘small business concern owned and controlled by service-disabled veterans’’ under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)).
(5) The term “SDVOSB participant” or certified SDVOSB means a small business that has been certified in the SBA Veteran Small Business Certification Program and listed in the SBA certification database (see 13 CFR 128.102).
(b) General. In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128.
(1) Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered.
(2) Any award resulting from this solicitation shall be made to a certified SDVOSB listed in the SBA certification database who is eligible at the time of submission of offer(s) and at the time of award.
(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.
(c) Representation. Pursuant to 38 U.S.C. 8127(e), only certified SDVOSBs listed in the SBA certification database are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible and certified SDVOSB as defined in this clause, 13 CFR 121, 125, and 128, and VAAR subpart 819.70.
(d) Agreement/LOS certification. When awarded a contract action, including orders under multipleaward contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size, and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting (LOS) requirements in 13 CFR 121.406(b) and 13 CFR 125.6. For the purpose of limitations on subcontracting, only certified SDVOSBs listed in the SBA certification database (including independent contractors) shall be considered eligible and/or ‘‘similarly situated’’ (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required LOS certification requirements in this solicitation (see 852.219–75 or 852.219–76 as applicable). These requirements are summarized as follows:
(1) Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs listed in the SBA certification database (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/ VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.
(2) Supplies/products.
(i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract.
(ii) In the case of a contract for supplies from a non-manufacturer, the SDVOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements.
(3) General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database.
(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified SDVOSBs listed in the SBA certification database.
(5) Subcontracting. An SDVOSB subcontractor must meet the NAICS size standard assigned by the prime contractor and be certified and listed in the SBA certification database to count as similarly situated. Any work that a first tier SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6.
(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:
[X] By the end of the base term of the contract or order, and then by the end of each subsequent option period; or [] By the end of the performance period for each order issued under the contract.
(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .