This document is a standard operating procedure (SOP) checklist for testing boiler steam pressure limit switches at a VA medical facility. The checklist, created on January 1, 2023 and valid until January 1, 2028, outlines a semi-annual testing procedure for two critical boiler switches (HBSPLS and HHBSPLS) with specific requirements for pressure settings and manual reset conditions. The document provides a structured evaluation method to ensure boiler safety, requiring switches to be set at precise pressure differentials relative to normal steam pressure and safety valve set points, with explicit pass/fail criteria for each testing parameter.

The related federal contract opportunity (Solicitation Number 36C24726Q0127) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation for Boiler Preventative Maintenance Services issued by the Department of Veterans Affairs VISN 07 at the William Jennings Bryan Dorn VA Medical Center in Columbia, SC. The procurement falls under NAICS code 561210 with a small business size standard of $47.0 Million, and requires vendors to be registered in SAM and SBA verified as an SDVOSB, with quotes being requested for comprehensive boiler plant control systems preventative maintenance services.

View the file

Other files

File Type Posted
VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
36C24726Q0127 0001.docx DOCX document
COLUMBIA WT BOILER SD6MSOP 15_P High Steam Pressure Limits Boiler.docx DOCX document
S06-36C24726Q0127 0001_1.docx DOCX document
36C24726Q0127.docx DOCX document
36C24726Q0127 .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF: SOP 544-138-11-5 WT BOILER SD6MSOP 15_D

Checklist for Recycle and Non-Recycle Boiler Steam Pressure Limit Switches Boiler#_________ (HBSPLS & HHBSPLS)

Date: ___________________Tested By: ___________________________
Procedure Created: January 1, 2023Procedure Expires: January 1, 2028
Testing Frequency: Semi-AnnualVHA Directive: 1810

Location and Plumbing *This test involves two switches. The switch with the highest set point must be a non-recycle switch.

Make & Range of HBSPLS psig

Setpoint of HBSPLS psig

Make & Range of HHBSPLS psig

Setpoint of HHBSPLS psig

Normal Steam Pressure psig

Lowest Boiler Steam Safety Valve Set Point psig

Pressure Gage Calibration Date

Is the switch with the highest set point a non-recycle switch?
Yes
Fail
Are the ranges of the switches and gage satisfactory?
Yes
Fail

Switch Setpoint & Mechanics *The VA requires that the HBSPLS set point should be 10 psig or more higher than the normal steam pressure and the HHBSPLS set point should be 5 psig or more above the HBSPLS set point & 5 psig or more below the lowest boiler steam safety valve set point

What pressure did the HBSPLS activate?

psig

What pressure did the HHBSPLS activate?

psig

Did HBSPLS activate 10 psig or more above the normal steam pressure
Yes
Fail
Did HHBSPLS activate 5 psig or more above that of the HBSPLS
Yes
Fail
Did HHBSPLS activate 5 psig or more below the lowest boiler SSRV set point?
Yes
Fail

Check the Logic

Did HBSPLS require a manual reset?
Yes
Fail
Did HHBSPLS require a manual reset?
Yes
Fail
Were all questions answered as “YES”
Yes
Fail
If required - Were repairs made to all items marked fail?
Repaired
Not Repaired

EXPLAIN: