36C24726Q0104 0002 Lawn and Ground Services.docx

DOCX document 130 KB Posted

Attached to
S208--Provide 36C24726Q0104 0004 Lawn and Ground Services Federal contract opportunity
Solicitation number
36C24726Q0104
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This is an amendment (Amendment 0002) to Request for Quotation 36C24726Q0104 for lawn and ground maintenance services at Charlie Norwood Veterans Medical Center facilities operated by the Department of Veterans Affairs Veterans Integrated Service Network 7 in Tucker, Georgia. The amendment extends the deadline for receipt of offers to March 6, 2026 at 11:00 AM EST and incorporates FAR Clauses 52.223-2 (Reporting of Biobased Products) and 52.223-23 (Sustainable Products and Services), both effective May 2024 with a February 2025 deviation. The contracting office is located at LaVista Business Park, Building A, 2008 Weems Road, Tucker, Georgia 30084.

The solicitation requires comprehensive lawn and ground maintenance services at two locations—Uptown (1 Freedom Way & 950 15th Street) and Downtown facilities—including bi-weekly mowing March through September and twice monthly October through February; bi-weekly parking lot and parking deck sweeping with sweeper trucks; tree and shrub pruning minimum twice yearly; removal of dead, diseased, and fallen trees with stump grinding; removal of shrubbery and trees from parking lot islands (work to be performed after hours or weekends); installation of weed barriers and mulch in interior and exterior courtyards, parking lots, and bed areas; bed cultivation and weekly inspection for pest infestations; parking lot curb cleaning; and solar panel area maintenance. Major storm damage repair is budgeted at $10,000 per quarter under CLIN 0002, with costs exceeding the threshold handled on a case-by-case basis. The contract is firm fixed price with no additional funding available beyond the scope outlined. Contractors must be bonded, hold a state business license, and comply with specified safety clearances (14 feet over streets, 12 feet over driveways, 8 feet over walk areas, 4 feet from buildings). This is a new contract with no incumbent contractor specified, and site maps of service areas are provided as attachments.

View the file

Other files for this federal contract opportunity

Other files attached to S208--Provide 36C24726Q0104 0004 Lawn and Ground Services, newest first.
File Type Posted
36C24726Q0104 0004.docx DOCX document
36C24726Q0104 0004_1.docx DOCX document
36C24726Q0104 0003_1.docx DOCX document
36C24726Q0104 0003 Question and Answer.docx DOCX document
36C24726Q0104 0003_1.docx DOCX document
Attachment 2 - Uptown Division Map 26.pdf PDF
Attachment 1 Facility grounds parking lot areas.pdf PDF
36C24726Q0104 0002_1.docx DOCX document
36C24726Q0104 0001_1.docx DOCX document
36C24726Q0104 0001.docx DOCX document
36C24726Q0104_1.docx DOCX document
36C24726Q0104 Lawn Care Services 021125.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

02-25-2026

509-26-3-5102-0006

Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084

Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084 To all Offerors/Bidders

36C24726Q0104

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-06-2026 11AM EST

Amend RFQ#36C24726Q0104, is as follows for questions and responses :

1) Question and answer responses attached.

2) Add FAR Clauses 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts ((MAY 2024) and Clause 52.223-23 – Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025).

Contracting Officer

CONTINUATION PAGE

36C24726Q0104
Lawn Service Questions and Responses
Question Reference No.
Question(s)
Response
1
For clarity, please give the addresses of the Uptown and Downtown Locations.
(Uptown)1 Freedom Way & 950 15th Street (Downtown).
2
Who is the current incumbent and contract number?
Please submit a FOIA request for any information regarding the previous contract.
3
PWS B.1 – Is Bed Pre emergents currently being done under another contract and does this contract also include post emergent applications?
Yes, only the lawn no planting beds.
4
PWS C.3 – Is aeriation only required of thatch exceeds ½” or soil compaction is evident?
To be done as stated in the solicitation (If thatch exceeds one-half inch depth or soil compaction is evident, aerate lawns after soil

thaws and turf enter the active growing period.)

5
PWS A – What is the total square footage of beds that are to be maintained?
Addressed during the site visit.
6
PWS A.1 – Is there a current contract in place that includes pest control applications of trees and plants?
Yes
7
PWS 4.a.2 / Pricing Schedule CILN 0002 - It is understood that the contractor is responsible for “Major Storm Repair” . In section 4.a.2 it states funding for this is $10,000.00 per quarter.

Is this the pricing ($10.000.00) that we are to be putting in for CLIN 0002?

If the work required due to a storm exceeds $10,000.00 will the contractor be able to submit for an adjustment?

Is this a firm fixed price or to completed under a separate task order??

Please submit your Offeror in accordance with the Instructions to Offerors.

Clin 0002, is for Major Storm Damage Repair. The threshold is set amount for clin 0002. If costs exceed the approved threshold, it will be handled on a case-by-case basis or processed on a separate funding document.

8
Scope of Work - Under the Scope of work section it states that the contractor is to “Re-move all the shrubbery and trees from parking lot islands, stumps to be ground down, work required to be done after normal business hours or on the weekends”. Could the government provide maps and details as to where this work is to be performed? area(s) of the facilities to be serviced?

See attached map. The parking lot areas circled need to be completed per SOW.

9
Scope of Work – This section list to “install weed barriers and mulch in all interior and exterior courtyards, along with all exterior parking lots and common area beds.” There is no details anywhere else in the PWS. We understand that there are some areas that can only be accessed by going inside the buildings. Could the government provide total square footage and a map with the location of these beds?
Maps are attached for areas of service; A site visit was conducted for measurements of bed areas requiring mulch and weed barriers and to quantify numbers and size of parking lot islands. Minimum safety clearance is 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, and 4 feet from buildings. Other trees shall be pruned on an as-required basis to provide safety, clearances and/or to prevent structural damage. Topping and de-horning shall not be permitted. Trimming/pruning of trees around utility poles/power lines is the responsibility of the contractor. Notify the COR when trimming/pruning around utility poles/power lines is needed. Shrubs, small trees, and other plants shall be maintained according to the American Society of Landscape Architect's standards. They shall be pruned as required to maintain their natural growth characteristics. Shrubs and small trees shall be trimmed and pruned to enhance the beauty and health of the plant. Hedges shall be maintained to their natural mature height and shape. Broadleaf evergreens and flowers beds shall be pruned annually or as required maintaining clearances of minimum of 3 inches from buildings, sidewalks, or other obstructions.
10
Scope of Work – Within this list the requirement to “Remove dead diseased and fallen trees and grind stumps” is listed.

Could the government change the pricing to have a CLIN that would include this by pricing of each tree to be removed under this requirement?

Under what CLIN is this to be priced?

Provide a response to this RFQ as indicated in Instructions to Offerors.

11
Is the solar field part of this requirement, if so what are the requirements?
The contractor shall provide all personnel, equipment, tools, labor,

supervision, and other items and services necessary to ensure that ground maintenance is performed to include Solar Panel area and all adjacent surrounding areas in a manner that will maintain healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance.

12
Will there be an area provided on site for the contractor to store equipment? If so, what is the size and type of this areas?
Approx 10 parking spaces no containers.
13
Is there a current separate contract in place for the turf maintenance and post emergent ap-plication for the fence lines and solar field?
Lawn – Yes

Fence Line – Yes Solar Panel - No

14
PWS e.1 / Scope of work – Under section e.1 pruning is required 2 times per year. Howev-er under the Scope of work section it states “as needed” with minimum of 2 times per year. Which requirement is correct?
Both, minimum requirement is twice a year; however, need may exceed twice a year.
15
The scope of work requires sweeping of the parking lots and parking decks to be done bi-weekly is this correct?
Yes, twice a month Sweeper truck to be used Bi-weekly in all parking lots at both the Uptown and Downtown

Facilities.

16
Under the technical criteria evaluation, a state business license is required for sub-mission with the proposal. We are an SDVOSB business and would be willing to get this if required post award. Could this requirement be removed as a proposal requirement?
No
17
There has been no mention of a bonding requirement in PWS or in the solicitation. Could this requirement be removed as proposal requirement?
No
18
Do the existing stumps that are on the grounds from previous contract need to be ground down and removed from property?
No, the previous Contractor will be working on this. All work must strictly follow the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
19
Will the areas of the hospital be addressed with mulch like noted in the old contract?
Yes, the hospital be addressed with mulch.
20
Will the sand present along the parking lot curbs be scooped up since the street sweeper cannot pick it up?
Yes, the parking lot curbs will be scooped up when the street sweeper cannot pick it up.
21
Will the new contractor that is awarded the contract be granted additional funds to clean up the atrium and courtyard areas? (The current contractor has not touched them.)
No, this is a firm-fixed price contract. Funds will only be available for the services listed in the RFQ.
22
Will the courtyards, atrium areas, and exterior hospital beds be mulched by the previous contractor before it is awarded?
Yes, all required services are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
23
Do all the bushes, shrubbery, and trees need to be removed from parking lot islands?
No, all required services are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW)
24
Do the big pin oak trees in the parking lot islands need to be removed as well?
No, all required services are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
25
Who is going to be liable to pay the new contractor for work that is in the old contract?
All services are to be performed as listed within the RFQ. A response should be provided to this RFQ as indicated in Instructions to Offerors
26
The tree stumps from the Helene storm are still on the grounds. Are they a part of this new contract?
The current contractor is working on removal/grinding down.
27
Why weren’t the atrium areas addressed with the weeding, mulching, and proper maintenance? This seems to never have been done.
Please provide your offer for the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
28
Were the atrium beds and the exterior wall beds supposed to be mulched every year at both hospitals Uptown and downtown and that was not completed?

Please provide your offer for the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).

29
Current Contractor has not completed large tasks that affect the cost of the new contract. Who will be liable for this period?
Provide a response to this RFQ as indicated in Instructions to Offerors.
30
There needs to be about 1,000 yards of mulch that will need to be put in the parking lot beds in addition to the mulch that was not done by the previous contractor. Will we be required to install the amount of existing mulch that was needed?

Please provide your offer for the required services that are to be performed within the scope,1 deliverables, and timelines outlined in the Statement of Work (SOW).

31
There needs to be 500 yards of mulch to get the VA facilities looking the way the contract states. Will we all be bidding 500 yards of mulch work that needs to be done immediately to get a manageable landscaped look?

Please provide your offer for the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).

32
The previous contractor was unable to complete all these large tasks. Have they already received the funds to complete the old tasks?
Please submit a FOIA request for any information regarding the previous contract
33
They need to take a walk around on the properties to show that these job duties have not been fulfilled like the contract states. Will this be addressed before final contract is awarded?
Provide a response to the RFQ as indicated in the Instructions to Offerors. All details will be discussed prior to new Contractor onboarding.
34
The current contractor has already been paid to do a lot of this work that is incomplete. Are additional funds going to be withheld for these tasks to be completed in the new contract or in addition to the new contract? (For example: the stumps need to be ground down, the junipers that have not been pulled out, and dead trees that have not been removed.)

Provide a response to the RFQ as indicated in the Instructions to Offerors for the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).

35
There are a lot of trees that need to be addressed on the limbing height which still needs to be done. This was in the first contract at 12 feet. We noticed there were trees not at 12 feet. Thos was at the Downtown campus as well. How will this be addressed?
Minimum safety clearance is 14 feet over streets, 12 feet over driveways, 8 feet over

walk areas, and 4 feet from buildings.

36
I know the previous contract is not our concern but work left undone and landscaping the bed areas needs to start fresh. Can we put a qualified number on the new mulch needed? (We believe that to be 500 yards)

Provide a response to the RFQ as indicated in Instructions to Offerors. A specific quantity will not be added as a part of this solicitation.

37
Need clarification on what can be blown and what has to be swept?

As stated in the contract all parking lots and parking structures will have a sweeper truck go thru them every 2 weeks.

38
Prune shrubbery is needed to maintain a uniform shape minimum 2 times a year entire facilities (fisher house, uptown and downtown) Is 2x a year suffice or does it have to be more frequently?
Minimum 2 Times. As needed to maintain uniform shape throughout the year.
39
Trim all trees in parking lots and adjacent surrounding areas to a minimum of 15 ft. from ground Is this all trees or just larger growing ones hanging over roadways?
All
40
Remove all the shrubbery and trees from parking lot islands, stumps to be ground down, work required to be done after normal business hours or on the weekends Are we to dig up the juniper that was left and cut the trees that are still standing?
Remove all shrubbery and live trees that obstruct sidewalk and parking lot from parking lot

islands, stumps to be ground down, work required to be done after normal business hours or on the weekends, parking lot can be section off during this time upon request.

41
Sweeper trucks be used Bi-weekly in all parking lots to include parking deck at both the Uptown and Downtown Facilities. Work to be accomplished after normal work hours or on weekends. Line item number 4 says to blow curbs. Can we blow them or do they have to be swept.
Both as it states in the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
42
Sweeper trucks be used Bi-weekly in all parking lots to include parking deck at both the Uptown and Downtown Facilities. Work to be accomplished after normal work hours or on weekends. Line-item number 4 says to blow curbs. Can we blow them or do they have to be swept.
Both as it states in the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
43
Remove all trash and debris from lawns prior to each mowing. I assume this includes parking lots and islands as well. Entire site?
Correct, as it states in the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
44
Weed Control Do any of the lawn areas need to be set up on a spray program to control weeds in grass and fertilization?
This service is on another contract.
45
During the fall and winter season, all fallen leaves are to be collected and removed from property on a weekly basis. Does his means that the site will have to be mowed every week? Line item 1 says bi-weekly oct-feb. please clarify.
Cut grass weekly March through September and Bi-weekly October thru February, as stated to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
46
Cultivate all bed areas as often as necessary to keep them in a loose, uniform condition and free of weeds. If the beds have mulch in them why are we cultivating. That will only loosen up the dirt and promote weed growth and washing/erosion?
Cultivate all bed areas as often as necessary to keep them in a loose, uniform condition and free of weeds.
47
Inspect all plantings on a weekly basis for possible infestations report all findings to COR. Are we required to treat these areas or just report to COR to provide treatment separately from contract?
Report your findings to the COR.
48
Will all of the dead trees and stumps within the property be taken care of before the new contract starts?
No, remove dead diseased and fallen trees and grind stumps.
49
Will the interior and exterior beds around the hospital be mulched before the contract is awarded?
No, the contract requirements are inclusive of edging, eliminating weeds, maintaining mulch, and repair or replace damaged plants in shrubs and plant beds.
50
Is the new contractor responsible for cleaning up all atrium areas free of weeds and unwanted debris that is currently present?
Yes, as it states in the required services that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW).
51
Will there be additional funds awarded to Relandscape the parking lots?
Funding will only be provided for the required services prescribed in this RFQ that are to be performed within the scope, deliverables, and timelines outlined in the Statement of Work (SOW). Addiitonal funding request will require higher level approval.
52
We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

If not brand new, could you please provide the current / previous contract number?

This is a brand-new contract. For any information regarding the incumbent Contractor and the previous contract number please submit a FOIA request.

53
I am preparing a quote for Solicitation 36C24726Q0104 (Lawn Care Services for Charlie Norwood VAMC) and would appreciate any additional specifications that may be available:

• Approximate square footage of bed areas requiring mulch and weed barrier

•Number and size of parking lot islands where shrubbery/tree removal is required

•Site maps or ground layouts for the service area Maps are attached for areas of service. Minimum safety clearance is 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, and 4 feet from buildings. Other trees shall be pruned on an as-required basis to provide safety, clearances and/or to prevent structural damage. Topping and de-horning shall not be permitted. Trimming/pruning of trees around utility poles/power lines is the responsibility of the contractor. Notify the COR when trimming/pruning around utility poles/power lines is needed. Shrubs, small trees, and other plants shall be maintained according to the American Society of Landscape Architect's standards. They shall be pruned as required to maintain their natural growth characteristics. Shrubs and small trees shall be trimmed and pruned to enhance the beauty and health of the plant. Hedges shall be maintained to their natural mature height and shape. Broadleaf evergreens and flowers beds shall be pruned annually or as required maintaining clearances of minimum of 3 inches from buildings, sidewalks, or other obstructions.

A site visit was conducted for measurements of bed areas requiring mulch and weed barriers and to quantify numbers and size of parking lot islands where shrubbery/tree removal is required.

A.1 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this clause— BioBased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is in an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. (7 U.S.C. 8101) (7 CFR 4270.2).

USDA-designated product category means a generic grouping of biobased products that are listed by USDA in a procurement guideline (7 CFR part 4270) and for which USDA has provided minimum biobased content standards (see https://www.biopreferred.gov/resources/categories.html).

(b) Requirement. The Contractor shall—

(1) Report to https://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any biobased products in USDA designated product categories purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

(End of Clause)

A.2 52.223-23 SUSTAINABLE PRODUCTS (NOV 2025) (DEVIATION)

(a) Definitions. As used in this clause— Sustainable products means—

(1) A product that contains recovered material designated by the EPA under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).

(2) An energy-efficient product or low standby power device (42 U.S.C. 8259b) (10 CFR part 436, subpart C) (https://www.energy.gov/femp/search-energy-efficient-products, https://www.energystar.gov/products?s=mega, and https://www.energy.gov/femp/low-standby-power-product-list).

(3) A biobased product that meets the content requirements of the USDA under the BioPreferred® program (7 U.S.C. 8102) (7 CFR Part 4270) (https://www.biopreferred.gov/)

(4) A substance identified in the EPA’s Significant New Alternatives Policy (SNAP) program as a safe alternative to an ozone-depleting substance (42 U.S.C. 7671l) (40 CFR part 82, subpart G) (https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables).

(b) Requirements. The Government has identified in the statement of work or elsewhere in the contract the sustainable products that are required during the performance of this contract. The Contractor shall ensure that it provides sustainable products as required by this contract, when the products are—

(1) Delivered to the Government;

(2)Furnished for use by the Government;

(3) Incorporated into the construction of a public building or public work; or

(c) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract.

(End of Clause)

SOLICITATION NO.RFQ 36C24726Q0104

ATTACHMENTS

UPTOWN DIVISION MAP

FACILITY GROUNDS THE PARKING LOT AREAS ARE CIRCLE IN YELLOW

File details come from the government source that posted it. Updated .