QUESTIONS AND ANSWERS PAGE 2.docx
DOCX document 13 KB Posted
- Attached to
- J046--WATER TREATMENT AND CHILLER PLANT SERVICES
- Solicitation number
- 36C24725Q0026
About this file
This document is a Questions and Answers page related to solicitation #36C24724Q0862 for Water Treatment and Chiller Plant Services at the William Jennings Bryan Dorn VA Medical Center in Columbia, SC.
The key details include:
- The solicitation requests water treatment and chiller plant services.
- Potential bidders requested a site visit, which was scheduled for July 25th at 11:00 AM.
- The solicitation does not require OEM authorization for any equipment.
- The facility has 5 chillers (3 at 750 tons, 2 at 500 tons) and 2 cooling towers.
- The chilled water system is 30,000 gallons.
- The facility has 4 main boilers (3 at 600 HP, 1 at 400 HP) and 3 low pressure water heaters listed as boilers in an outbuilding. The annual steam production is 82,492,000 lbs.
- The boiler plant and chiller plant are located in separate facilities.
- Legionella testing is only conducted on the cooling towers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24725Q0026 0003.docx | DOCX document | |
| ADDITIONAL QUESTIONS AND ANSWERS TO WATER CHILLER TREATMENT SOLICITATION 36C24725Q0026.docx | DOCX document | |
| 36C24725Q0026 0001.docx | DOCX document | |
| 36C24725Q0026.docx | DOCX document | |
| Wage Determination No. 2015-4429.docx | DOCX document | |
| VA Directive1061.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regarding solicitation #36C24724Q0862 Water Treatment and Chiller Plant Services - William Jennings Bryan Dorn VAMC - Columia, SC, we would like to submit the following RFIs and request for site walk:
1) Can a site/job walk be scheduled? Thursday July 25th at 1100.
A site walk could address most of the following questions.
2) Can you please provide the equipment that requires OEM authorization, typically water treatment does not have equipment manufacturing requirements. None requires OEM authorization.
In regards to Cooling Water Treatment:
3) Can you please provide the number of chillers with tonnage for each chiller? 5 Chillers 3 750 tons and 2 500 tons
4) Can you please provide the number of cooling towers, with gallons volume for each? Two towers. 2 Cell each.
5) Can you please provide the number of separate cooling tower systems, with gallon volumes for each? Two towers. 2 Cell each.
6) Can you please provide the size of the chilled water system in gallons? 30,000
In regards to the Boiler water Treatment:
7) Can you please please provide the number of boilers with horsepower ratings for each? Main Plant 4 Boilers 3 600 HP, 1 400 HP, out building 3 low pressure water heaters that are listed as boilers.
8) Can you please provide the annual steam production in million lbs of steam? FY23 1/1000 LB 82,492,000
9) Is all steam and chilled water produced in one location, or in multiple steam/chilled water plants? No. 1 Boiler Plant and 1 Chiller Plant
10) Is the Legionella testing done only in the central plant(s) or in multiple buildings and campuses? Only on Cooling Towers.
File details come from the government source that posted it. Updated .