This document is an amendment to a previous combined solicitation (36C24724Q0680) issued by the Department of Veterans Affairs for the replacement of the gas monitoring system in the chiller/boiler plant at the Carl Vinson VA Medical Center in Dublin, Georgia.

The amendment provides responses to vendor questions regarding the communication protocol, power source, and installation requirements for the new gas monitoring system. Key details include that the new system will be a standalone system not integrated with the building automation system, and that there are existing 120V circuits available to power the new equipment. The amendment also outlines the applicable licensing and certification requirements for the installation work. The overall solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, with a response due date of May 30, 2024 and a 60-calendar day period of performance after award.

View the file

Other files

File Type Posted
Site Visit Map.pdf PDF
STATEMENT OF WORK.pdf PDF
Wage Determination No 2015-4505 Rev 27.docx DOCX document
SCHEDULE.docx DOCX document
36C24724Q0680_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

557-24-3-5443-0136 Replace Gas Monitoring System in the Chiller/Boiler Plant (VA-24-00074559)

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
29403-5799
SOLICITATION NUMBER*
36C24724Q0680
RESPONSE DATE/TIME/ZONE
05-30-2024 17:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J042
NAICS CODE*
561210

CONTRACTING OFFICE ADDRESS

Department of Veterans Affairs Ralph H. Johnson VA Medical Center 109 Bee Street Charleston SC 29403-5799

POINT OF CONTACT*

Contracting Officer David Parente David.Parente@va.gov 843-252-6747

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Carl Vinson VA Medical Center

1826 Veterans Blvd

Dublin GA

POSTAL CODE
31021
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
David.Parente@va.gov
EMAIL DESCRIPTION
Contracting Officer

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

DESCRIPTION

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05/24/2024 557-24-3-5443-0136 Department of Veterans Affairs Ralph H. Johnson VA Medical Center 109 Bee Street Charleston SC 29403-5799 Department of Veterans Affairs Ralph H. Johnson VA Medical Center 109 Bee Street Charleston SC 29403-5799 To all Offerors/Bidders

36C24724Q0680 05-24-2024

X X X

See CONTINUATION Page X Subject:

Replace Gas Monitoring System in the Chiller/Boiler Plant

The purpose of amendment 0001 is to post vendor RFI's.

1. See Vendor RFI's on continuation page.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED

David Parente Contracting Officer Page 1 of Page 1 of

CONTINUATION PAGE

VENDOR RFI’s 36C24724Q0680 Replace Gas Monitoring System in the Chiller/Boiler Plant

1. What is the communication protocol for the refrigerant monitor.

Audible and visual alarms (strobes). All gas sensors are hard wired into the Chill Guard monitoring system. This does not tie into any of the automated systems in the control room.

Power for monitors is fed from panel NLDP1A in the electrical room in the chiller plant.

2. Who is the BAS vendor/manufacturer?

Hamlin Air Conditioning and Sheet Metal Inc.

3. Is the refrigerant monitor being tied into the BAS?

No- it’s a stand-alone system.

4. If so, will we be expected to contract the BAS vendor, or will the VA get them to integrate the monitor?

Not fed into the BAS. The system is stand-alone. However, if questions arise about monitor installation (BAS vendor installed when plant was built), the contractor is responsible for reaching out to the BAS vendor.

5. Is the refrigerant monitor replacing the existing monitor or is it a new monitor installation?

We are replacing the current monitor. Unless contractor proposes a new location, the monitor will stay in the same location.

6. If new, is there an existing 120v circuit we can use to power it?

This will not be a new installation. The existing 120v circuit should be adequate.

7. How far from the new monitor is the existing / new circuit?

It’s about 100-150 ft to the electrical room.

8. Is there an existing 120v circuit we can use to power the new Gas Guard?

This is a replacement, so yes, there is an existing circuit. The only non-replacement piece of equipment is one CO and one Combustible gas sensor in the boiler plant. This new sensor pair will go on the wall with the roll up door in the boiler plant. It will need to be hard wired into the new Gas Guard. All other equipment is being replaced.

9. How far from the new gas guard is the existing / new circuit?

It’s about 150-200ft to the electrical room.

10. Is there any specific licensing requirements stipulated by the RFP? What are the licensing requirements, if any, for the monitor installation?

· All equipment needs to be commissioned.

· Installation must meet VHA HVAC Design Manual

· Installation must meet ASHRAE Standard 15

· Installation must meet VHA Directive 19810

· Installation must meet VHA Boiler and Associated Plant Safety Device Testing Manual Seventh Edition (page 53)