36C24718B0121-012.pdf
PDF 22 MB Posted
- Solicitation number
- 36C24718B0121
About this file
36C24718B0121 Drawings - 55714101.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24718B0121-00001000.docx | DOCX document | |
| 36C24718B0121-00001001.xlsx | XLSX spreadsheet | |
| 36C24718B0121-011.docx | DOCX document | |
| 36C24718B0121-009.docx | DOCX document | |
| 36C24718B0121-010.txt | TXT text file | |
| 36C24718B0121-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o n e q u a r t e r i n c h e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
N
NOT TO SCALE
e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
MATERIALS LEGEND
02200 SAND
03000 CONCRETE
040500 GROUT
04210 BRICK MASONRY
04220 CONCRETE MASONRY UNIT -
SMALL SCALE
04220 CONCRETE MASONRY UNIT -
LARGE SCALE
04400 ROUGH STONE
04720 CAST STONE MASONRY
05000 ALUMINUM
05000 BRASS - BRONZE
05000 STEEL
05530 GRATINGS, SECTION
06105 ORIENTED STRAND BOARD
(O.S.B.)
06105 PARTICLE BOARD
06105 PLYWOOD OR EXTERIOR
SHEATHING
06105 WOOD BLOCKING OR SHIM
06105 WOOD FRAMING - CONTINUOUS
06200 FINISHED WOOD
07210 BATT INSULATION
07210 SEMI-RIGID INSULATION -
FIRE SAFING
07210 RIGID INSULATION
08800 GLASS
09000 CERAMIC TILE
09200 PLASTER WITH METAL LATH
09250 GYPSUM BOARD FINISH
09640 WOOD FLOORING
09400 TERRAZZO FINISH
09680 CARPET & PAD
DESCRIPTION SYMBOLSECTION
09000 SPRAY-ON FIRE SAFING
OR INSULATION
09000 COMPRESSIBLE FILLER
HW HARDWARE
HW HOT WATER
I.D. INSIDE DIAMETER
IN INCH, INCHES
INSUL INSULATED, INSULATION
INT INTERIOR
JB JUNCTION BOX
JCT JUNCTION
JT JOINT
LB POUNDS
LP LIGHTING PANEL
LTG LIGHTING
MAINT MAINTAIN, MAINTENANCE
MAX MAXIMUM
MECH MECHANCIAL
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MT METAL THRESHOLD
MTD MOUNTED
MTG MOUNTING
MTL METAL
N.A. NOT APPLICABLE
N.I.C. NOT IN CONTRACT
NO, NUM NUMBER
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OH OVERHEAD
OPNG OPENING
P PAINT
PAF POWDER ACTUATED FASTENER
PART PARTIAL
PEMB PRE-ENGINEERED METAL BUILDING
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PRESS PRESSURE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTN, PTNS PARTITION, PARTITIONS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROUND
REC,
REC'D
RECEIVED
RECP RECEPTACLE
REINF REINFORCED, REINFORCING
REQ REQUIRED
RM ROOM
S.J. SCORE JOINT
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SCH,
SCHD
SCHEDULE, SCHEDULED
SD SOAP DISPENSER
SECT SECTION
SF, SQ. FT. SQUARE FEET, SQUARE FOOT
SHT SHEET
SPEC,
SPECS
SPECIFICATIONS, SPECIFIED
STL STEEL
STOR STORE, STORAGE
STR,
STRUCT
STRUCTURE, STRUCTURAL
SUSP SUSPENDED
T, TLT,
TOIL
TOILET
TELE TELEPHONE
TELECOM
M
TELECOMMUNICATIONS
THD THRESHOLD
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
w/ WITH
WD WOOD
CC CONTRACTOR FURNISHED, CONTRACTOR
INSTALLED
VC GOVERNMENT FURNISHED, CONTRACTOR
INSTALLED
VV GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
A.O. ACCESS OPENING
AC AIR CONDITIONING
ACMU ARCHITECTURAL CONCRETE MASONRY
UNITS
ACT SUSPENDED ACOUSTICAL CEILING TILE
AHU AIR HANDLING UNIT
ALT ALTERNATE, ALTERNATIVE
ALUM ALUMINUM
AP CEILING ACCESS PANEL
APPROX APPROXIMATE, APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AV AUDIO-VISUAL
BD BOARD
BLDG BUILDING
BM BEAM
BOT, BTM BOTTOM
BRG BEARING
CAB, CABT CABINET
CAP CAPACITY
CCTV CLOSED CIRCUIT TELEVISION
CEM CEMENT, CEMENTITIOUS
CIRC CIRCULATING, CIRCULAR
CJ CONTROL JOINT
CLG CEILING
CLM, COL COLUMN
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CT CERAMIC / PORCELAIN TILE
CTB CERAMIC / PORCELAIN TILE BASE
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIFF DIFFERENCE
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
EA EACH
EF EXHAUST FAN
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATION
EQUIP EQUIPMENT
EVTR ELEVATOR
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP JT EXPANSION JOINT
EXT EXTERIOR
F.O. FACE OF
FA FIRE ALARM
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL,FLR FLOOR
FR FROM
FT FEET, FOOT
FTG FOOTING
G.P.H. GALLONS PER HOUR
G.P.M. GALLONS PER MINUTE
GA GAGE
GAL GALLON, GALLONS
GALV GALVANIZED
GL, GLAZ GLAZED, GLAZING
GND GROUND
GOV'T GOVERNMENT
GR GRILLE
GYP BD,
GYP, GWB
GYPSUM WALL BOARD
HB HOSE BIBB
HC HANDICAP
HEWC HANDICAP ELECTRIC WATER COOLER
HGT HEIGHT
HM HOLLOW METAL
HR HOUR
HT HEIGHT
HTG HEATING
HTR HEATER
NOT ALL ABBREVIATIONS SHOWN ARE USED
STANDARD OF ABBREVIATIONS
1F157B
D2 / AE512
AE501
AE201
AE201
AE211
0'-0" = 93.25
FIRST FLOOR
P-01
DRAWING TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES TRUE NORTH
EXISTING
INDICATES COLUMN
LINE DESIGNATION
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
NEW PARTITION - UNRATED
PARTITION / BARRIER - 1 HOUR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT FURNISHED /
CONTRACTOR INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
View Name
SALE: 1/8" = 1'-0"
A101
PARTITION / BARRIER - 1 HOUR SMOKE
PARTITION / BARRIER - 2 HOUR
A
DRAWING SYMBOLS PARTITION INDICATORS SCOPE INDICATORS
GENERAL PLAN NOTES
A. UNLESS NOTED OTHERWISE, ALL WORK SHOWN IS
FURNISHED AND INSTALLED BY CONTRACTOR.
B. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO
FINISHED FACE OF PARTITIONS (EXCLUDING
APPLIED FINISHES SUCH AS TILE) AND TO COLUMN
CENTER LINES.
C. EQUIPMENT AND FURNITURE IS SHOWN FOR
REFERENCE ONLY - REFER TO EQUIPMENT
SCHEDULE FOR LIST OF ITEMS INCLUDED IN THIS
CONTRACT.
D. REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL WORK.
E. ALL PENETRATIONS THROUGH CEILING/FLOOR
ASSEMBLIES OR THROUGH RATED OR SMOKE
BARRIER ASSEMBLIES - EITHER CREATED BY
REMOVAL OF DEMOLISHED ITEMS OR DISCOVERED
DURING CONSTRUCTION - MUST BE SEALED AS
PART OF THE CONTRACT. ALL RATED
SEPARATIONS MUST MEET CURRENT CODE
REQUIREMENTS.
F. CONTRACTOR TO PROTECT ROOF DURING THE
DURATION OF THE PROJECT. CONTRACTOR TO
MAKE ANY REPAIRS TO ROOFING DAMAGED
DURING CONSTRUCTION. A QUALIFIED ROOFING
SUBCONTRACTOR IS REQUIRED TO MAKE THE
REPAIRS AND MAINTAIN THE WARRANTY.
G. PROVIDE TEMPORARY CONDITIONED AIR FOR
ZONES FED BY PARTICULAR UNIT. PROVIDE
THROUGH EXISTING FLOOR DUCTING FROM UNIT
SUPPLY OPENING. CONSTRUCT TEMPORARY
PLENUM TO TRANSFER CONDITIONED AIR FROM
GC-SUPPLIED GROUND-MOUNTED UNIT TO ZONED
SUPPLY DUCTS.
H. CONTRACTOR SHALL ACCESS ROOF FROM OUTSIDE
/ GRADE AND NOT THROUGH INSIDE VAMC SPACES.
COORDINATE LOCATION WITH COR.
I. PROVIDE TEMPORARY COOLING FOR PHARMACY AT
PHASE 1.
J. GC SHALL PROVIDE ALL POWER AND EQUIPMENT
NECESSARY FOR TEMPORARY AIR CONDITIONING.
POWER SHALL BE SUPPLIED BY GC PROVIDED
GENERATOR(S) OR AS OTHERWISE DEEMED BY THE
COR.
PHASING NOTES
PHASING:
THE GENERAL CONTRACTOR SHALL REVIEW THIS PROPOSED PHASING PLAN AND DEVELOP A JOINT PHASING PLAN WITH
THE VAMC TO MINIMIZE DISRUPTION TO VAMC-OCCUPIED SPACES.
THE FOLLOWING INFORMATION, WHICH IS A NON-INCLUSIVE LIST, SUGGESTS A GENERAL ORDER OF ACTIVITIES TO PHASE
THE PROJECT WHILE MINIMIZING DISRUPTION TO VAMC-OCCUPIED SPACES. THIS LIST OF ACTIVITIES IN NO WAY
INSTRUCTS THE CONTRACTOR IN TERMS OF WAYS, MEANS, AND METHODS OF CONSTRUCTION.
PHASE-1: UNIT/MECHANICAL ROOM 5.4:
1-1. INSTALL GC-SUPPLIED TEMPORARY COOLING UNIT AND ASSOCIATED TEMPORARY DUCTWORK FOR PHARMACY.
5 DAYS
1-2. REMOVE EXISTING SUPPLY SECTION OF THE AHU AND CONSTRUCT TEMPORARY PLENUM CONNECTED TO
GC-PROVIDED AHU ON GRADE TO SUPPLY ZONE WITH CONDITIONED AIR DURING WORK FOR THIS PHASE.
OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME
1-3. DEMOLITION LOUVERS, ASSOCIATED MASONRY, AND STUD/GWB PARTITION TO PROVIDE DEMOLITION REMOVAL
PATH OUT THE ENLARGED OPENING. PROVIDE TEMPORARY SHORING. 3 DAYS
1-4. DEMOLISH AHU AND ASSOCIATED DUCTWORK, ETC. 7 DAYS
1-5. INSTALL STRUCTURAL SUPPORTS FOR MASONRY VENEER. (CONCURRENT WITH 4 OR 6) 7 DAYS
1-6. INSTALL NEW AHU IN SECTIONS AND ASSOCIATED DUCTWORK. LEAVE SUPPLY SECTION UNINSTALLED UNTIL
SYSTEM IS NEARLY OPERATIONAL. 7 DAYS
1-7. REFRAME OPENINGS IN EXTERIOR BRICK-VENEER WALL. (PARTLY CONCURRENT WITH 6) 7 DAYS
1-8. INSTALL NEW LOUVER. 1 DAY
1-9. REMOVE TEMPORARY PLENUM AND TEMPORARY CONDITIONING. INSTALL AHU SUPPLY SECTION, CONNECT TO
LOUVER, AND ACTIVATE UNIT. OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME
1-10. REMOVE TEMPORARY COOLING UNIT FOR PHARMACY, AND REPAIR ALL FINISHES. 3 DAYS
1-11. TEST AND BALANCE OF NEW AHU SYSTEM. 5 DAYS
PHASE-2: UNIT/MECHANICAL ROOM 5.2:
2-1. REMOVE EXISTING SUPPLY SECTION OF THE AHU AND CONSTRUCT TEMPORARY PLENUM CONNECTED TO
GC-PROVIDED AHU ON GRADE TO SUPPLY ZONE WITH CONDITIONED AIR DURING WORK FOR THIS PHASE.
OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME
2-2. DEMOLITION LOUVERS, ASSOCIATED MASONRY, AND STUD/GWB PARTITIONS TO PROVIDE DEMOLITION REMOVAL
PATH OUT THE ENLARGED OPENING AND FOR NEW, ENLARGED OPENING FOR COILING DOOR. PROVIDE
TEMPORARY SHORING. 4 DAYS
2-3. DEMOLISH AHU AND ASSOCIATED DUCTWORK, ETC. 7 DAYS
2-4. INSTALL STRUCTURAL SUPPORTS FOR MASONRY VENEER. (CONCURRENT WITH 3 OR 5) 7 DAYS
2-5. INSTALL NEW AHU IN SECTIONS AND ASSOCIATED DUCTWORK. LEAVE SUPPLY SECTION UNINSTALLED UNTIL
SYSTEM IS NEARLY OPERATIONAL. 7 DAYS
2-6. REFRAME OPENINGS IN EXTERIOR BRICK-VENEER WALL. (PARTLY CONCURRENT WITH 5) 7 DAYS
2-7. INSTALL NEW LOUVER AND OVERHEAD COILING DOOR. 2 DAYS
2-8. REMOVE TEMPORARY PLENUM AND TEMPORARY CONDITIONING. INSTALL AHU SUPPLY SECTION, CONNECT TO
LOUVER, AND ACTIVATE UNIT. OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME
2-9. TEST AND BALANCE OF NEW AHU SYSTEM. 5 DAYS
PHASE-3: UNIT/MECHANICAL ROOM 5.1:
3-1. REMOVE EXISTING SUPPLY SECTION OF THE AHU AND CONSTRUCT TEMPORARY PLENUM CONNECTED TO
GC-PROVIDED AHU ON GRADE TO SUPPLY ZONE WITH CONDITIONED AIR DURING WORK FOR THIS PHASE.
OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME.
3-2. DEMOLITION LOUVERS, ASSOCIATED MASONRY, AND STUD/GWB PARTITION TO PROVIDE DEMOLITION REMOVAL
PATH OUT THE ENLARGED OPENING. PROVIDE TEMPORARY SHORING. 3 DAYS
3-3. DEMOLISH AHU AND ASSOCIATED DUCTWORK, ETC. 7 DAYS
3-4. INSTALL STRUCTURAL SUPPORTS FOR MASONRY VENEER. (CONCURRENT WITH 3 OR 5) 7 DAYS
3-5. INSTALL NEW AHU IN SECTIONS AND ASSOCIATED DUCTWORK. LEAVE SUPPLY SECTION UNINSTALLED UNTIL
SYSTEM IS NEARLY OPERATIONAL. 7 DAYS
3-6. REFRAME OPENINGS IN EXTERIOR BRICK-VENEER WALL. (PARTLY CONCURRENT WITH 5) 7 DAYS
3-7. INSTALL NEW LOUVER. 1 DAY
3-8. REMOVE TEMPORARY PLENUM AND TEMPORARY CONDITIONING. INSTALL AHU SUPPLY SECTION, CONNECT TO
LOUVER, AND ACTIVATE UNIT. OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME.
3-9. TEST AND BALANCE OF NEW AHU SYSTEM. 5 DAYS
PHASE-4: UNIT/MECHANICAL ROOM 5.3 (DEDUCT ALTERNATE):
4-1. REMOVE EXISTING SUPPLY SECTION OF THE AHU AND CONSTRUCT TEMPORARY PLENUM CONNECTED TO
GC-PROVIDED AHU ON GRADE TO SUPPLY ZONE WITH CONDITIONED AIR DURING WORK FOR THIS PHASE.
OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME.
4-2. DEMOLISH AHU AND ASSOCIATED DUCTWORK, ETC. 7 DAYS
4-3. INSTALL NEW AHU IN SECTIONS AND ASSOCIATED DUCTWORK. LEAVE SUPPLY SECTION UNINSTALLED UNTIL
SYSTEM IS NEARLY OPERATIONAL. 7 DAYS
4-4. REMOVE TEMPORARY PLENUM AND TEMPORARY CONDITIONING. INSTALL AHU SUPPLY SECTION, CONNECT TO
LOUVER, AND ACTIVATE UNIT. OVER THE COURSE OF A WEEKEND - MINIMAL DOWN-TIME.
4-5. TEST AND BALANCE OF NEW AHU SYSTEM. 5 DAYS
76X40
76X40
36"
A
A
'-0
36"
FIELD VERIFY EXISTING
SUPPLY DUCT SIZE.
MODIFY SUPPLY PLENUM
AS REQUIRED TO
CONNECT TO EXISTING
DUCTWORK.
FIELD VERIFY EXISTING
SUPPLY DUCT SIZE. MODIFY
SUPPLY PLENUM AS REQUIRED
TO CONNECT TO EXISTING
DUCTWORK.
CONNECT TO EXISTING
CONNECT TO EXISTING
36" ROUND DUCT TO TEMPORARY
COOLING UNIT LOCATED BELOW ON
GROUND. ROUTE DUCT THROUGH
EXISTING TEMPORARY DEMOLITION
OPENINGS AND CONNECT TO TEMPORARY
UNIT. REFER TO PHASING PLAN FOR
LOCATION OF TEMPORARY COOLING UNIT.
36" ROUND DUCT TO TEMPORARY COOLING UNIT
LOCATED BELOW ON GROUND. ROUTE DUCT
THROUGH EXISTING TEMPORARY DEMOLITION
OPENINGS AND CONNECT TO TEMPORARY UNIT.
REFER TO PHASING PLAN FOR LOCATION OF
TEMPORARY COOLING UNIT.
1 PHASING PLAN
SCALE: 1/16" = 1' - 0"
5-T3
UNIT/MECH.
ROOM 5.4
ABOVE
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
UNIT/MECH.
ROOM 5.2
ABOVE
UNIT/MECH. ROOM 5.1 ABOVE
UNIT/MECH.
ROOM
5.3
ABOVE
PHASE 2PHASE 3
PHASE 1PHASE 4
SCAFFOLD ACCESS STAIR TO ROOF.
CONTRACTOR SHALL ACCESS ROOF FROM
OUTSIDE / GRADE AND NOT THROUGH
INSIDE VAMC SPACES. COORDINATE
LOCATION WITH COR.
2 TEMPORARY COOLING SUPPLY PLENUM
SCALE: N.T.S.
5-T3
TEMPORARY COOLING OF
PHARMACY (PHASE - 1)
S U
E
T
D H L
C
GENERAL PLAN NOTES
A. UNLESS NOTED OTHERWISE, ALL WORK SHOWN IS
FURNISHED AND INSTALLED BY CONTRACTOR.
B. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO
FINISHED FACE OF PARTITIONS (EXCLUDING
APPLIED FINISHES SUCH AS TILE) AND TO COLUMN
CENTER LINES.
C. EQUIPMENT AND FURNITURE IS SHOWN FOR
REFERENCE ONLY - REFER TO EQUIPMENT
SCHEDULE FOR LIST OF ITEMS INCLUDED IN THIS
CONTRACT.
D. REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL WORK.
E. ALL PENETRATIONS THROUGH CEILING/FLOOR
ASSEMBLIES OR THROUGH RATED OR SMOKE
BARRIER ASSEMBLIES - EITHER CREATED BY
REMOVAL OF DEMOLISHED ITEMS OR DISCOVERED
DURING CONSTRUCTION - MUST BE SEALED AS
PART OF THE CONTRACT. ALL RATED
SEPARATIONS MUST MEET CURRENT CODE
REQUIREMENTS.
F. CONTRACTOR TO PROTECT ROOF DURING THE
DURATION OF THE PROJECT. CONTRACTOR TO
MAKE ANY REPAIRS TO DAMAGED OCCURRED
DURING CONSTRUCTION. A QUALIFIED ROOFING
SUBCONTRACTOR IS REQUIRED TO MAKE THE
REPAIRS AND MAINTAIN THE WARRANTY.
G. SCAFFOLD ACCESS STAIR TO ROOF. CONTRACTOR
SHALL ACCESS ROOF FROM OUTSIDE / GRADE AND
NOT THROUGH INSIDE VAMC SPACES. COORDINATE
LOCATION WITH COR.
1 EXISTING ROOF PLAN
SCALE: 1/16" = 1' - 0"
5-A1
EXISTING SKYLIGHT
5-A3
5-A5
5-A3
5-A5
5-A2
5-A4
5-A2
5-A4
5-A2
5-A4
5-A2
5-A4
5-A3
5-A5
CONTRACTOR TO BE AWARE AND TAKE CAUTION
AROUND GUIDE WIRE THAT IS ATTACHED TO
CHEMOTHERAPY EXHAUST PIPE.
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
EXISTING AIR INTAKE ON
ROOF OF 5.3 MECH.
SCAFFOLD ACCESS
EXISTING WALKING MATS
A SEPARATE MEANS OF EGRESS
TO GRADE SHALL BE PROVIDED
BY THE GC. COORDINATE MEANS
AND LOCATION(S) WITH COR.
MECHANICAL
ROOM 5.4
MECHANICAL
ROOM 5.2
MECHANICAL
ROOM 5.3
MECHANICAL
ROOM 5.1
M
A S
O N
R Y
O
P E
N I N
G
S U
TS UT
D H L
DC
M
A S
O N
E
N I N
G
M
A S
O N
E
N I N
G
12'-2" MASONRY OPENING
F I E
L D
V
R
I F
Y
E
X T
E N
T
O
F
D
E M
O L
I T
I
Q
U I R
F
W
E
N I N
G
F I E
R
I F
Y
E
X T
E N
T
O
F
D
E M
O L
I T
I
Q
U I R
E
N I N
G
F I E
R
I F
Y
E
X T
E N
T
O
F
D
E M
O L
I T
I
Q
U I R
E
N I N
G
FIELD VERIFY EXTENT OF DEMOLITION
REQUIRED FOR NEW OPENING.
GENERAL DEMOLITION NOTES
A. ALL ITEMS SHOWN DASHED INDICATE ITEMS TO BE
DEMOLISHED OR SALVAGED. SEE SPECIFIC PLAN
NOTES FOR ADDITIONAL INFORMATION. REFER TO
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS
FOR ADDITIONAL DEMOLITION NOTES.
B. DEPICTION OF EXISTING CONDITIONS BASED ON
OWNER- FURNISHED DOCUMENTS AND LIMITED FIELD
OBSERVATIONS. EXISTING ELEMENTS AND
CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT
AND FINISHES WERE NOT OBSERVED OR
INVESTIGATED. FIELD VERIFY EXTENT OF DEMOLITION
REQUIRED FOR NEW OPENING. ONCE CUTTING AND
SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT
ANY CONFLICTS TO DESIGNER. THE CONTRACTOR
SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS
NECESSARY TO INSTALL COMPLETE AND OPERABLE
SYSTEMS IN ACCORDANCE WITH THE CODES HAVING
JURISDICTION AT NO ADDITIONAL COST TO THE
GOVERNMENT.
C. ALL OPENINGS AND SURFACES MADE BARE BY
DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL
BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT
FINISH. PREPARE SURFACES TO RECEIVE NEW
FINISH(S).
D. CONTRACTOR TO DEVELOP AND PUBLISH INFECTION
CONTROL PLAN AND SAFETY PLAN FOR APPROVAL BY
COR PRIOR TO BEGINNING THEIR WORK.
E. INSTALL TEMPORARY DUST AND DEBRIS BARRIERS
AND VESTIBULES IN ACCORDANCE WITH AND AS
APPROVED IN THE INFECTION CONTROL PLAN.
TEMPORARY BARRIERS ARE NOT TO RESTRICT
REQUIRED MEANS OF EGRESS PATHS AND WIDTHS.
F. PROTECT AND MAINTAIN EXISTING FIRE STOPPING
AND EXISTING APPLIED FIREPROOFING. RESTORE TO
EXISTING RATING WHERE DAMAGED OR REMOVED AS
PART OF WORK.
G. PROVIDE TEMPORARY CONDITIONED AIR FOR ZONES
FED BY PARTICULAR UNIT. PROVIDE THROUGH
EXISTING FLOOR DUCTING FROM UNIT SUPPLY
OPENING. CONSTRUCT TEMPORARY PLENUM TO
TRANSFER CONDITIONED AIR FROM GC-SUPPLIED
GROUND-MOUNTED UNIT TO ZONED SUPPLY DUCTS.
DEMOLITION PLAN NOTES
1 EXISTING AHU TO BE REMOVED. REFER TO
MECHANICAL DRAWINGS FOR DETAILS. CONCRETE
MECHANICAL PAD TO REMAIN.
2 REMOVE EXISTING LOUVERS.
3 REMOVE EXISTING MASONRY, STUDS AND GYP.
BOARD AROUND STRUCTURAL COLUMNS .
4 REMOVE EXISTING MASONRY, STUDS, GYP. BOARD,
METAL DOOR AND FRAME FOR A NEW OPENING
FOR A COILING DOOR.
5 CONTRACTOR TO PROVIDE TEMPORARY SHORING
FOR EXISTING MASONRY ABOVE AREAS WHERE
LOUVERS, DOORS AND MASONRY ARE BEING
REMOVED.
6 PROVIDE OPENING IN ROOF FOR NEW HVAC INAKE.
REFER TO STRUCTURAL AND MECHANICAL. SEE
DETAIL 7/5-A6
X
LEGEND
DEMOLITION
EXISTING TO REMAIN
UT
F I E
R
I F
Y
F I E
R
I F
Y
FIELD VERIFY
FIELD
VERIFY
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
ENLARGED MECHANICAL ROOM 5.3
DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A2
ENLARGED MECHANICAL ROOM 5.2
DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A2
ENLARGED MECHANICAL ROOM 5.1
DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A2
ENLARGED MECHANICAL ROOM 5.4
DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A2
1 11
DEMO
REMOVAL
PATH
DEMO REMOVAL
PATH
DEMO REMOVAL
PATH
ALTERNATE
DEMO
REMOVAL
PATH
5.2 5.4
5.3
5.1
3 5
3 5
3 5
3 5
PARTIAL ROOF DEMOLITION PLAN
MECHANICAL ROOM 5.2
SCALE: 1/4" = 1' - 0"
5-A2
NOTE: FIELD VERIFY LOCATION OF
NEW OPENING AND COORDINATE
SIZE AND LOCATION WITH
MECHANICAL DUCTWORK.
GENERAL DEMOLITION NOTES
A. ALL ITEMS SHOWN DASHED INDICATE ITEMS TO BE
DEMOLISHED OR SALVAGED. SEE SPECIFIC NOTES
BELOW FOR ADDITIONAL INFORMATION. REFER TO
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS
FOR ADDITIONAL DEMOLITION NOTES.
B. DEPICTION OF EXISTING CONDITIONS BASED ON
OWNER- FURNISHED DOCUMENTS AND LIMITED FIELD
OBSERVATIONS. EXISTING ELEMENTS AND
CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT
AND FINISHES WERE NOT OBSERVED OR
INVESTIGATED. ONCE CUTTING AND SELECTIVE
DEMOLITION WORK IS COMPLETE, REPORT ANY
CONFLICTS TO DESIGNER. THE CONTRACTOR SHALL
MAKE ADJUSTMENTS AND/OR ALTERATIONS AS
NECESSARY TO INSTALL COMPLETE AND OPERABLE
SYSTEMS IN ACCORDANCE WITH THE CODES HAVING
JURISDICTION AT NO ADDITIONAL COST TO THE
GOVERNMENT.
C. ALL OPENINGS AND SURFACES MADE BARE BY
DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL
BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT
FINISH. PREPARE SURFACES TO RECEIVE NEW
FINISH(S).
D. CONTRACTOR TO DEVELOP AND PUBLISH INFECTION
CONTROL PLAN AND SAFETY PLAN FOR APPROVAL BY
COR PRIOR TO BEGINNING THEIR WORK.
E. INSTALL TEMPORARY DUST AND DEBRIS BARRIERS
AND VESTIBULES IN ACCORDANCE WITH INFECTION
CONTROL PLAN. TEMPORARY BARRIERS ARE NOT TO
RESTRICT REQUIRED MEANS OF EGRESS PATHS AND
WIDTHS.
F. PROTECT AND MAINTAIN EXISTING FIRE STOPPING AND
EXISTING APPLIED FIREPROOFING. RESTORE TO
EXISTING RATING WHERE DAMAGED OR REMOVED AS
PART OF WORK.
DEMOLITION NOTES
1 CONTRACTOR TO PROVIDE TEMPORARY SHORING
FOR EXISTING MASONRY WHERE LOUVER, DOORS,
AND MASONRY ARE BEING REMOVED.
2 REMOVE EXISTING LOUVERS.
3 REMOVE EXISTING METAL DOOR AND FRAME.
4 REMOVE EXISTING MASONRY, STUDS AND GYP.
BOARD. SALVAGE BRICK TO MAKE NEEDED
MODIFICATIONS TO OPENING. FIELD VERIFY EXTENT
OF DEMOLITION TO PERFORM WORK.
5 CAREFULLY REMOVE EXISTING MASONRY AND
RETAIN FOR REUSE. FIELD VERIFY EXTENT OF
DEMOLITION TO PERFORM WORK.
X o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
PARTIAL EXISTING EAST ELEVATION MECH. ROOM 5.4 AND 5.2
SCALE: 1/4" = 1' - 0"
5-A3
PARTIAL EXISTING NORTH ELEVATION MECH. ROOM 5.1
SCALE: 1/4" = 1' - 0"
5-A3
274.00
SECOND
FLOOR
260.5
FIRST
FLOOR
274.00
SECOND
FLOOR
260.5
FIRST
FLOOR
EXISTING PENTHOUSE ELEVATION AT ROOM 5.3
SCALE: 1/4" = 1' - 0"
5-A3
274.00
PENTHOUSE
FLOOR
2 2 2 2
4 4
MECH. ROOM 5.4 MECH. ROOM 5.2
S U
TS UT
D H L
DC
H
S S
H
S S
H
S S
H
S S
H
S S
H
S S
℄ HSS ℄ HSS
A. UNLESS NOTED OTHERWISE, ALL WORK SHOWN IS
FURNISHED AND INSTALLED BY CONTRACTOR.
B. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO
FINISHED FACE OF PARTITIONS (EXCLUDING
APPLIED FINISHES SUCH AS TILE) AND TO COLUMN
CENTER LINES.
C. EQUIPMENT AND FURNITURE IS SHOWN FOR
REFERENCE ONLY - REFER TO EQUIPMENT
SCHEDULE FOR LIST OF ITEMS INCLUDED IN THIS
CONTRACT.
D. REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL WORK.
E. ALL PENETRATIONS THROUGH CEILING/FLOOR
ASSEMBLIES OR THROUGH RATED OR SMOKE
BARRIER ASSEMBLIES - EITHER CREATED BY
REMOVAL OF DEMOLISHED ITEMS OR DISCOVERED
DURING CONSTRUCTION - MUST BE SEALED AS
PART OF THE CONTRACT. ALL RATED
SEPARATIONS MUST MEET CURRENT CODE
REQUIREMENTS.
F. CONTRACTOR TO PROTECT ROOF DURING THE
DURATION OF THE PROJECT. CONTRACTOR TO
MAKE ANY REPAIRS TO DAMAGED OCCURRED
DURING CONSTRUCTION. A QUALIFIED ROOFING
SUBCONTRACTOR IS TO MAKE THE REPAIRS AND
MAINTAIN THE WARRANTY.
G. SHADED AREAS SUGGEST APPROXIMATE AREA OF
WORK. FIELD VERIFY.
1 NEW AHU EQUIPMENT. REFER TO MECHANICAL
DRAWINGS FOR DETAILS.
2 PROVIDE OPENING FOR NEW ROOF HOOD. REFER
TO STRUCTURAL DRAWINGS FOR DETAILS.
COORDINATE WITH MECH. FOR SIZE.
3 PROVIDE 10' WIDE X 7' HIGH OPENING FOR NEW
COILING DOOR.
4 EXTEND CONCRETE STEP FOR NEW OPENING.
MATCH EXISTING.
5 INSTALL NEW METAL LOUVER TO FIT NEW
OPENING.
6 INSTALL METAL FRAMING AND GYP BOARD
AROUND EXISTING STRUCTURAL COLUMN TO
PROVIDE A ONE HOUR RATING. REPAIR ANY
DAMAGED SPRAY-ON FIRE-PROOFING.
X o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
ENLARGED MECHANICAL ROOM 5.3
FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A4
ENLARGED MECHANICAL ROOM 5.2
FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A4
ENLARGED MECHANICAL ROOM 5-4
FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A4
ENLARGED MECHANICAL ROOM 5.1
FLOOR PLAN
SCALE: 1/4" = 1' - 0"
5-A4
5-A6
PARTIAL ROOF PLAN ROOM 5.2
SCALE: 1/4" = 1' - 0"
5-A4
5-A6
5-A6
5-A6
5-A6
NOTE: FIELD VERIFY LOCATION OF
NEW OPENING AND COORDINATE
SIZE AND LOCATION WITH
MECHANICAL DUCTWORK.
TYP.
TYP.
5-A6
HEAD SILL
GENERAL DRAWING NOTES
A. UNLESS NOTED OTHERWISE, ALL WORK SHOWN IS
FURNISHED AND INSTALLED BY CONTRACTOR.
B. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO
FINISHED FACE OF PARTITIONS (EXCLUDING
APPLIED FINISHES SUCH AS TILE) AND TO COLUMN
CENTER LINES.
C. EQUIPMENT AND FURNITURE IS SHOWN FOR
REFERENCE ONLY - REFER TO EQUIPMENT
SCHEDULE FOR LIST OF ITEMS INCLUDED IN THIS
CONTRACT.
D. REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL WORK.
E. ALL PENETRATIONS THROUGH CEILING/FLOOR
ASSEMBLIES OR THROUGH RATED OR SMOKE
BARRIER ASSEMBLIES - EITHER CREATED BY
REMOVAL OF DEMOLISHED ITEMS OR
DISCOVERED DURING CONSTRUCTION - MUST BE
SEALED AS PART OF THE CONTRACT. ALL RATED
SEPARATIONS MUST MEET CURRENT CODE
REQUIREMENTS.
F. CONTRACTOR TO PROTECT ROOF DURING THE
DURATION OF THE PROJECT. CONTRACTOR TO
MAKE ANY REPAIRS TO DAMAGED OCCURRED
DURING CONSTRUCTION. A QUALIFIED ROOFING
SUBCONTRACTOR IS TO MAKE THE REPAIRS AND
MAINTAIN THE WARRANTY.
ELEVATION NOTES
1 INSTALL NEW 10' WIDE X 7' HIGH METAL COILING
DOOR IN NEW OPENING.
2 REPAIR/TUCKPOINT BRICK MASONRY AT
OPENING. MATCH EXISTING BRICK AND MORTAR
IN COLOR AND PROFILE.
3 INSTALL NEW 4" METAL LOUVER IN NEW
OPENING. VERIFY SIZE IN FIELD.
4 REFER TO STRUCTURAL DRAWINGS FOR
FRAMING DETAILS AND LINTEL DETAILS.
5 INSTALL SALVAGED BRICK AT LINTEL. MATCH
EXISTING MORTAR SIZE AND COLOR.
X o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
PARTIAL EAST ELEVATION MECH. ROOM 5.2 AND 5.4
SCALE: 1/4" = 1' - 0"
5-A5
PARTIAL NORTH ELEVATION MECH ROOM 5.1
SCALE: 1/4" = 1' - 0"
5-A5
274.00
SECOND
FLOOR
260.50
FIRST
FLOOR
274.00
SECOND
FLOOR
260.50
FIRST
FLOOR
274.00
PENTHOUSE
FLOOR
PENTHOUSE ELEVATION AT ROOM 5.3
SCALE: 1/4" = 1' - 0"
5-A5
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
5-A6
NEW PVC ROOF MEMBRANE
SEAL
EXISTING PVC
EXISTING STEEL BEAM
EXISTING METAL DECK
ATTACH PER MANUFACTURER
INTAKE HOOD
1 1/2" MIN WELD
MEMBRANE
METAL BAR
ANCHOR
ROOF MEMBRANE
METAL FLASHING
8"
ATTACHED IN FIELD
CONTINUOUS ANGLE
SHIM
LOUVER
BIRD SCREEN
N E
W
CONTINUOUS
SEALANT
E X
I S
T I N
G
M A
S O
N R
Y
O
P E
N I N
G
T
M
A T
C H
X I S
T I N
G
WEEPS
N E
W E
X I S
T I N
G
℄ HSS℄ COL
GWB (TYPE-X)
HSS BEAM
SELF SEALING
MEMBRANE
FLASHING
METAL
FLASHING
SEALANT
BACKER ROD
TERMINATION
BAR
℄ BEAM
(PT) WOOD BLOCKING
LOUVER
BIRD SCREEN
ATTACHED IN FIELD
CONTINUOUS ANGLE
MEMBRANE FLASHING
TURN UP FLASHING AT ENDS
MTL STUD
GWB (TYPE-X)
℄ COL
METAL FLASHING PAN OR DRIP AND
TURN UP AT ENDS TO CREATE END DAMS
WEEPS
LOUVER SILL PAN
SEALANT AND BACKER ROD
CAST STONE SILL
SELF SEALING
TO CREATE END DAMS
SOLDER AND SEAL (TYP AT ALL END DAMS)
℄ BEAM
℄ HSS
PRESSURE TREATED
HM FRAME
ANCHORS
GWB (TYPE-X)
S
℄ HSS BEAM
E X
I S
T I N
G
N E
W
E X
I S
T I N
G N
E W
METAL FLASHING
TERMINATION
BAR
SEAM
WEEPS
COILING DOOR HEAD
SELF SEALING
MEMBRANE FLASHING
℄ HSS POST
CONTINUOUS
SEALANT
EXISTING SLAB
NEW CONCRETE STEP
S
EXISTING PVC
HM DOOR SILL
CMU SILL
FULLY GROUTED
TO MATCH EXISTING
NEW PVC ROOF MEMBRANE
BEYOND
HM JAMB
ASSEMBLY
EXISTING ROOF
FRAME BEYOND
COILING DOOR
COILING DOOR WITH
WITH WEATHER SEAL
1 2
1 2
F V
3 8
1"
1"
1 4
2"
MATCH JAMB DIMENSION
METAL FLASHING PAN WITH DRIP
ROOF MEMBRANE
1 1/2" MIN WELD
8"
SEALANT W/ BACKER ROD
SELF SEALING MEMBRANE FLASHING
AROUND OPENING. TURN UP AT ENDS
TO CREATE END DAMS.
℄ HSS POST
℄ HSS BEAM
NEW METAL STUD FRAMING
SEALANT AND BACKER ROD
8" NOMINAL
EXISTING
℄ HSS
℄ HSS
MASONRY OPENING
SEAM
NEW
F E
I
R
I F
Y
EXISTINGNEW
EXISTING
GWB (TYPE-X)
LOUVER
SEALANT AND
BACKER ROD
CAST MASONRY SILL BELOW
BIRD SCREEN
HSS POST
SELF SEALING
MEMBRANE
FLASHING ALL
AROUND OPENING
NEW SHEATHING
AND AIR INFILTRATION
BARRIER (TYP ALL DTLS)
EXISTING SHEATHING
AND AIR INFILTRATION
BARRIER (TYP ALL DTLS)
EXISTING THERMAL INSULATION
W/ VAPOR BARRIER
℄ COL
1 2
GWB (TYPE-X)
CAST STONE SILL WITHIN
WALL (SHOWN DASHED)
PT WOOD
BLOCKING
S L O
P E
5"
℄ BEAM
EXISTING WALL ASSEMBLY
GENERAL NOTES
A. ENSURE VAPOR BARRIER AND AIR INFILTRATION
BARRIER ARE CONTINUOUS AND FULLY CONTINUOUS
FROM NEW TO EXISTING WALL ASSEMBLY.
B. FIELD VERIFY EXTENT OF DEMOLITION AND
RECONSTRUCTION NECESSARY TO PERFORM WORK.
C. SEE STRUCTURAL DRAWINGS FOR STEEL SIZE.
HM FRAME
SEALANT AND BACKER ROD
COILING DOOR JAMB
JAMB ANCHORS
FIELD VERIFY EXTENT OF WORK
EXISTING
S
SELF SEALING MEMBRANE
FLASHING ALL AROUND OPENING
℄ HSS
MASONRY OPENING
SEAM
PER MANUFACTURER
NEW
F I E
R
I F
Y
EXISTING NEW
S L O
P E
D O
W N
S L O
P E
D O
W N
T H
I C
K N
E S
S
O
F
E
X I S
T I N
G
F R
A M
E
D
E P
M
A T
C H
5 8
3 8
EXISTING THERMAL
INSULATION W/
VAPOR BARRIER
GWB (TYPE-X)
℄ COL
B
E A
M
EXISTING COLUMN
WITH SPRAY-ON
FIRE PROOFING
2"
5"
FIELD VERIFY
HM SILL BELOW
P A
R T
I T
I O
N
F
I E
R
I F
Y
NEW GWB (TYP-X) AND
METAL FRAMING
PT WOOD BLOCKING
H
S
S
T
1 2
COORDINATE DIM
W/ COILING DOOR
OFFSET
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
7 ROOF CURB DETAIL
SCALE: 1 1/2" = 1' - 0"
5-A6
4 COILING DOOR HEAD
5-A6
SCALE: 3" = 1' - 0"
LOUVER HEAD DETAIL
SCALE: 3" = 1' - 0"
5-A6
LOUVER SILL DETAIL
SCALE: 3" = 1' - 0"
5-A6
COILING DOOR JAMB DETAIL
SCALE: 3" = 1' - 0"
5-A6
LOUVER JAMB DETAIL
SCALE: 3" = 1' - 0"
5-A6
COILING DOOR SILL
SCALE: 3" = 1' - 0"
5-A6
MAINTAIN INTEGRITY OF WALL
ASSEMBLY AND WEATHER BARRIER
FIELD VERIFY EXISTING CONDITIONS
AND CONSULT WITH ARCHITECT ON
DETAILING SILL
GENERAL REQUIREMENTS
1. WHERE A SECTION OR DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL APPLY TO ALL SIMILAR
CONDITIONS.
2. COORDINATE ALL LIMITS AND DEPTHS OF DEPRESSIONS FOR FLOOR FINISHES WITH ARCHITECTURAL
DRAWINGS AND SCHEDULES. LIMITS SHOWN ON STRUCTURAL DRAWINGS ARE SCHEMATIC.
3. THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC.
SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
4. DO NOT SCALE DRAWINGS. FOLLOW DIMENSIONS SHOWN ON PLANS.
5. CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS AND ELEVATIONS SHOWN HEREIN
WITH ARCHITECTURAL PLANS, SECTIONS, AND DETAILS PRIOR TO CONSTRUCTION OR MATERIAL
PURCHASE AND SHALL NOTIFY ARCHITECT IN WRITING OF DISCREPANCIES. SEE ARCHITECTURAL
DRAWINGS FOR ALL DIMENSIONS AND ELEVATIONS NOT SHOWN HEREIN.
6. WHERE SPECIFIED, SIMPSON OR HILTI ANCHORING SYSTEMS SHALL BE INSTALLED IN STRICT
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. SPECIAL ATTENTION SHALL BE GIVEN
TO THE DRILLING, CLEANING, AND PREPARATION OF HOLES. WHERE ADHESIVE ANCHORS ARE SHOWN, SPECIAL ATTENTION SHALL BE GIVEN TO THE REQUIRED MIXING, APPLICATION, AND CURING TIME OF
ADHESIVE TYPE SPECIFIED.
7. DIMENSIONS INDICATED RELATIVE TO EXISTING STRUCTURE ARE APPROXIMATE AND SHALL BE FIELD
VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION OR MATERIALS PURCHASE. CONTRACTOR
SHALL NOTIFY ARCHITECT IN WRITING OF DISCREPANCIES.
STRUCTURAL STEEL
1. APPLICABLE STRUCTURAL STEEL CODES:
A. AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 14TH EDITION
B. AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES
2. MATERIALS:
"W" SHAPES ASTM A992, GRADE 50
STEEL TUBING ASTM A500, GRADE B, Fy = 46 KSI
STEEL PIPE ASTM A500, GRADE B, Fy = 42 KSI
ALL OTHER ASTM A36
ANCHOR BOLTS ASTM A307
HIGH STRENGTH BOLTS ASTM A325
ANCHOR RODS ASTM F1554, GRADE 36
WELDING ELECTRODES E70 SERIES
3. ALL STEEL FABRICATION AND ERECTION SHALL BE PERFORMED BY AN APPROVED FABRICATOR OR
ERECTOR SUCH THAT QUALITY ASSURANCE INSPECTIONS MAY BE WAIVED AS STATED IN AISC 360
CHAPTER N7.
4. ALL SHEAR AND TENSION TYPE BOLTED CONNECTIONS SHALL BE MADE WITH 3/4" DIAMETER ASTM
A325X HIGH STRENGTH BOLTS. DESIGN TORQUE TO BE DEVELOPED USING LOAD INDICATOR WASHERS
OR LOAD INDICATOR TYPE BOLTS. INSTALL AS PER MANUFACTURER'S PUBLISHED INSTRUCTIONS. ALL
OTHER BOLTED CONNECTIONS MAY BE MADE WITH ASTM A307 BOLTS AND WASHERS.
5. STEEL FRAMING ERECTION INCLUDING ALL BOLTED AND WELDED CONNECTIONS, BRACING, AND
ANCHORAGES SHALL BE COMPLETED AND PLUMB PRIOR TO PLACEMENT OF DECK.
6. TOP OF STEEL ELEVATION MEASURED FROM MAIN FINISHED FLOOR UNLESS NOTED AS (-2 1/2") ETC.
7. NON-SHRINK, NON-METALLIC GROUT WITH A 28 DAY COMPRESSIVE STRENGTH OF 5000 PSI SHALL BE
USED UNDER BASE PLATES.
8. ENGINEER SHALL BE CONTACTED FOR APPROVAL OF ANY FIELD MODIFICATIONS OF ANCHOR BOLTS OR
RODS AND COLUMN BASE PLATES.
9. TEMPORARY BRACING OF STEEL STRUCTURAL ELEMENTS IS THE RESPONSIBILITY OF THE
CONTRACTOR. STRUCTURAL STABILITY SHALL BE MAINTAINED AT ALL TIMES DURING THE ERECTION
PROCESS.
10. FRAMING CONNECTIONS NOT DETAILED, OR CONNECTIONS THAT ARE MODIFIED FROM THOSE DETAILED
SHALL BE DESIGNED BY SUPPLIER FOR THE END REACTION SHOWN ON THE PLAN. IF NO REACTION IS
PROVIDED, CONNECTIONS SHALL BE DESIGNED FOR 1/2 THE BEAM MAXIMUM UNIFORM LOAD PER AISC
MANUAL FOR STEEL CONSTRUCTION.
11. SHOP CONNECTIONS SHALL BE WELDED OR HIGH STRENGTH BOLTED. USE 3/16" FILLET WELD MINIMUM.
12. FIELD CONNECTIONS SHALL BE WELDED OR HIGH STRENGTH BOLTED AS DETAILED. NO FIELD WELDING
OF HOT-DIPPED GALVANIZED MEMBERS IS ALLOWED. USE 3/16" FILLET WELD MINIMUM.
13. SUBMIT FOR REVIEW SHOP DRAWINGS OF STEEL DETAILS PRIOR TO FABRICATING STRUCTURAL STEEL.
14. ALL BRICK SHELF ANGLES SHALL BE HOT-DIPPED GALVANIZED.
15. ALL EXTERIOR ELEMENTS AND THOSE ELEMENTS NOTED TO BE GALVANIZED SHALL BE HOT-DIPPED
GALVANIZED IN ACCORDANCE WITH ASTM A123 AFTER SANDBLAST CLEANING PER SSPC-SP10. USE
ASTM A325 BOLTS HOT DIPPED GALVANIZED WITH GALVANIZED HARDENED WASHERS AND GALVANIZED
HEAVY HEX NUTS FOR BOLTING OF GALVANIZED ITEMS.
16. STEEL COLUMNS, BASE PLATES, AND ALL STEEL BELOW GRADE SHALL HAVE A MINIMUM 3" CONCRETE
COVER PROTECTION.
BUILDING CODE
2012 INTERNATIONAL BUILDING CODE
GRAVITY LOADS (ASCE 7-10)
1. ROOF LIVE LOADS:
A. UNIFORMLY DISTRIBUTED LIVE LOADS:
TYPICAL ROOF.............................................. 20 PSF
3. SUPERIMPOSED DEAD LOADS:
A. UNIFORMLY DISTRIBUTED DEAD LOADS:
ROOF............................................................. 50 PSF
MECHANICAL ROOF HOOD WEIGHT:
F A B R A H O O D - G R A V I T Y I N T A K E
MODEL FGI.................................................. 252 LBS
SNOW LOADS (ASCE 7-10)
GROUND SNOW LOAD, Pg = 5 PSF (Ct=1.0)
WIND LOADS (ASCE 7-10)
BASIC WIND SPEED = 120 MPH
RISK CATEGORY = IV
MWFRS EXPOSURE = B
GCp = ± 0.18
SEISMIC CRITERIA (IBC 2012/ASCE 7-10)
RISK CATEGORY = IV
IMPORTANCE FACTOR = 1.50
DESIGN CATEGORY = C
SITE CLASS = D
Ss = 0.170 g
S1 = 0.084 g
SDS = 0.181 g
SD1 = 0.134 g
SEISMIC FORCE RESISTING SYSTEM:
EXISTING STRUCTURE - NOT MODIFIED
STRUCTURAL DESIGN CRITERIA
STRUCTURAL ABBREVIATIONS
GENERAL STRUCTURAL NOTES
R O
O F
W A
L L
S
40.3
28.9
25.4 27.7
23.9 26.2
35.7
33.4
30.2
22.1
COMPONENTS & CLADDING
WIND PRESSURES (PSF)
16.0
16.0 24.4
25.1
26.0
26.7
ZONE
AREA (SF)
+P -P
100 27.7
100 22.7 24.9
500 19.9 22.1
66.2
33.2
19.0
52.0
67.4
40.5
28.9
55.8
16.0
16.0 28.9
33.7
40.0
44.8
39.6
38.6
37.9
16.0
16.0
26.7
OVERHANG
OVERHANG
(#) QUANTITY
AB ANCHOR BOLT
ABV. ABOVE
ADD'L ADDITIONAL
AFF ABOVE FINISHED FLOOR
ARCH. ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BP BASE PLATE
BRG. BEARING
C CHANNEL
CJ CONTROL JOINT
CL CENTER LINE/ COLUMN
GRID LINE
CLR. CLEAR
CONC. CONCRETE
COL COLUMN
DIA. or Ø DIAMETER
DIAG. DIAGONAL
DL DEAD LOAD
E.F. EACH FACE
ELEV. ELEVATION
E.S. EACH SIDE
E.W. EACH WAY
EXIST. EXISTING
FFE FINISH FLOOR ELEVATION
FIN. FLR. FINISHED FLOOR
FT. or ' FEET
FTG. FOOTING
GALV. GALVANIZED
GA. GAUGE
GB GRADE BEAM
HORIZ. HORIZONTAL
HSS HOLLOW STRUCTURAL
SECTION
IN. or " INCH
JST. JOIST
K KIPS
KSI KIPS PER SQUARE INCH
L ANGLE
LBS. POUNDS
LG. LONG
LL LIVE LOAD
LLV LONG LEG VERTICAL
LLH LONG LEG HORIZONTAL
LSL LAMINATED STRAND LUMBER
LVL LAMINATED VENEER LUMBER
MAX MAXIMUM
MIN. MINIMUM
M.O. MASONRY OPENING
O.C. ON CENTER
PC. PIECE
PL. PLATE
PLF POUNDS PER LINEAR FOOT
PSF POUNDS PER SQUARE FOOT
PSL PARALLEL STRAND LUMBER
P.T. PRESSURE TREATED
REINF. REINFORCEMENT
SJ SAW JOINT
SPF SPRUCE/PINE/FIR
SYP SOUTHERN YELLOW PINE
T&B TOP & BOTTOM
TBR TO BE REMOVED
TJI iLEVEL TRUS JOIST
T.O.S. TOP OF STEEL
T.O.F. TOP OF FOOTING
TR TO REMAIN
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
W.P. WORK POINT
WF WIDE FLANGE
WL WIND LOAD
WWF WELDED WIRE FABRIC
W/ WITH
16.0
16.0
16.0
16.0
16.0
16.0
ZONE 2
ZONE 5
ZONE 3
a = 2.6 FT
FLAT ROOF:
ZONE 1
ZONE 4
25.4
23.9
22.7
19.9
26.7
STRUCTURAL SPECIAL INSPECTIONS
1. SPECIAL STRUCTURAL TESTS AND INSPECTIONS SHALL BE PERFORMED ON THIS PROJECT IN
ACCORDANCE WITH THE REQUIREMENTS OF CHAPTER 17 OF THE 2012 INTERNATIONAL BUILDING CODE
(IBC). THE FOLLOWING DOCUMENTS HAVE BEEN PREPARED FOR THIS PROJECT AS A PART OF THESE
CONSTRUCTION DOCUMENTS:
A. STATEMENT OF SPECIAL INSPECTIONS
B. SCHEDULE OF SPECIAL INSPECTIONS
C. STATEMENT OF SPECIAL INSPECTIONS REQUIREMENTS FOR WIND RESISTANCE
D. STATEMENT OF SPECIAL INSPECTIONS REQUIREMENTS FOR SEISMIC RESISTANCE
2. SPECIAL STRUCTURAL TESTS AND INSPECTIONS SHALL BE PERFORMED BY AN AGENCY SELECTED BY
THE CONTRACTOR AND APPROVED BY THE ENGINEER OF RECORD. THE AGENCY SHALL MEET ALL OF
THE REQUIREMENTS FOR APPROVAL INDICATED IN 2012 IBC SECTION 1703.1. SPECIAL INSPECTORS
SHALL BE QUALIFIED PERSONS WHO SHALL DEMONSTRATE COMPETENCE TO THE SATISFACTION OF THE
BUILDING OFFICIAL FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION
REQUIRING SPECIAL INSPECTION.
3. THE CONTRACTOR SHALL COORDINATE THE INSPECTION SERVICES IN ACCORDANCE WITH THE
PROGRESS OF THE WORK. THE CONTRACTOR SHALL PROVIDE SUFFICIENT NOTICE TO THE INSPECTOR
TO ALLOW PROPER SCHEDULING OF PERSONNEL.
4. ALL REPORTS AND SHOP CERTIFICATION OF SPECIAL INSPECTIONS TO BE PERFORMED ON THE PREMISES
OF A FABRICATOR'S SHOP SHALL BE SUBMITTED TO THE CONTRACTOR. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DISTRIBUTING THESE REPORTS TO THE SPECIAL INSPECTOR, THE ARCHITECT, AND
THE ENGINEER OF RECORD IN A TIMELY MANNER.
5. THE COSTS OF THE SPECIAL INSPECTOR'S SERVICES SHALL BE PAID FOR BY THE OWNER.
6. SPECIAL INSPECTORS SHALL KEEP A RECORD OF ALL INSPECTIONS PERFORMED. COPIES OF ALL
INSPECTIONS SHALL BE FURNISHED TO THE BUILDING OFFICIAL, THE ARCHITECT, AND THE ENGINEER OF
RECORD WITHIN 48 HOURS OF THE INSPECTION.
7. REPORTS SHALL INDICATE THAT THE WORK WAS PERFORMED AND CONSTRUCTED IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS. WORK NOT IN CONFORMANCE SHALL BE IDENTIFIED IN THE REPORT AND
SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR.
8. A FINAL REPORT OF INSPECTIONS DOCUMENTING REQUIRED SPECIAL INSPECTIONS, INCLUDING ANY
DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL, THE
ARCHITECT, AND THE ENGINEER OF RECORD PRIOR TO COMPLETION OF THE STRUCTURAL SYSTEMS BUT
AT A FREQUENCY NOT TO EXCEED 60 DAYS.
GENERAL NOTES
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved:
Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
5-S1
1 3
GENERAL
STRUCTURAL NOTES
T US
T US
DC
LHD
L5x5x
LINTEL
L x x
I N
T E
L
TYP.
TYP.
TYP.
MECHANICAL ROOF HOOD,
COORDINATE W/ MEP FOR
EXACT DIMENSIONS
H S
S x x
A
D E
R
H S
S x x
A
D E
R
HSS 6x4x
HEADER
HSS 6x6x
, TYP.
HSS 6x6x
, TYP.
HSS 6x6x
, TYP.
W x
TYP.
W x
ENLARGED MECHANICAL
ROOM 5.1 PLAN
SCALE: 1/4" = 1'-0"
ENLARGED MECHANICAL
ROOM 5.3 PLAN
SCALE: 1/4" = 1'-0"
ENLARGED MECHANICAL
ROOM 5.2 PLAN
SCALE: 1/4" = 1'-0"
ENLARGED MECHANICAL
ROOM 5.4 PLAN
SCALE: 1/4" = 1'-0"
A
5-S3
A
5-S3
A
5-S3
TYP.
B
5-S3
L6x6x
L6x6x
SIM.
L x x
N
T E
L
HSS 6x6x
, TYP.
NEW O.H. DOOR, COORD.
EXTENTS W/ ARCH.;
ATTACHMENTS BY DOOR MFR.
A
5-S3
H S
S x x
A
D E
R
5.4
5.2
5.1
5.3
5-S2
5-S2
5-S2
5-S2
3'-0"
+/- 24'-0" (V.I.F.) +/- 24'-0" (V.I.F.)
V
I F
V
I F
+/- 24'-0" (V.I.F.)+/- 5'-5" (V.I.F.)
B
V
I F
V
I F
V
I F
V
I F
V
I F
V
I F
+/- 11'-11" (V.I.F.) +/- 12'-0" (V.I.F.)
V
I F
V
I F
+/- 12'-2" (V.I.F.) +/- 11'-10" (V.I.F.)
V
I F
V
I F
EQ.EQ.
L x x
N
T E
L
EQ.EQ.
EQ.EQ.
6'-6" 6'-6"
E Q
E
Q
NO STRUCTURAL
SCOPE THIS BLDG.
GENERAL NOTES
A. OPENING DIMENSIONS SHALL BE COORDINATED WITH
ARCHITECTURAL DRAWINGS.
B. ALL DIMENSIONS RELATIVE TO THE EXISTING
STRUCTURE SHALL BE FIELD VERIFIED.
C. NEW COLUMNS SHALL BE CENTERED IN EXISTING
WALL STRUCTURE.
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
5-S2
2 3
FRAMING PLANS
L5x5x
, SEE PLAN
HSS 6x4x
, SEE PLAN
" PL.
COLUMN, SEE PLAN
8"x
"x6
" PL.
TYP.
3/16 4/12
TYP.
T/LOUVER
SEE ARCH.
T/BRICK
SEE ARCH.
T/STEEL
SEE ARCH.
A
5-S3
TYPICAL WALL SECTION @
LINTEL & HEADER
SCALE: 1
" = 1'-0"
EXIST. BEAM
1"
C
L
COL.
C
L
BEAM
W8x15
W8x15
PLAN
SECTION
EXIST.
BEAM
W8x15
C
L
EXIST.
BEAM
C
L
C
5-S3
B
5-S3
TYPICAL ROOF OPENING DETAIL
L x x
L V
L x x
L V
NOT TO SCALE
E X
I S
T
B
E A
M
E X
I S
T
B
E A
M
BEAM SIZE
# ROWS OF BOLTS, 'n'
" OFFSET
FROM WEB
STEEL BEAM,
SEE PLAN
C
O P
E
"1
L4x4 EA. SIDE, SEE SCHED. FOR
MIN. THICKNESS
M
I N
M
I N
W8, W10, C8, C9
W12, W14, C12
W16,W18
W21, W24
W27, W30, W33
MIN. L THICKNESS
BOLTED CONNECTION
M
I N
F A
C
W
E B
NOTES:
1. NUMBER OF BOLTS AND ANGLE SIZE AND THICKNESS SHOWN ARE MINIMUMS. FABRICATOR SHALL
DESIGN CONNECTIONS FOR THE REACTIONS SHOWN ON THE PLANS. WHERE REACTIONS ARE NOT
PROVIDED, FABRICATOR SHALL DESIGN SIMPLE SHEAR CONNECTIONS TO RESIST
THE MAXIMUM
TOTAL UNIFORM LOAD PER AISC PART 3.
2. DOUBLE ANGLES MAY BE SHOP WELDED OR SHOP BOLTED TO BEAM AT SUPPLIER'S OPTION.
C
5-S3
TYPICAL BEAM TO BEAM SHEAR CONNECTION
SCALE: 1
" = 1'-0"
PL.
" x 8" x 6
COLUMN, SEE PLAN
BEAM, SEE PLAN
TYP.
D
5-S3
TYPICAL BEAM TO COLUMN CONNECTION
SCALE: 1
" = 1'-0"
G
R O
U T
M
I N
E M
B E
D
" Ø HILTI-HY 150 MAX
EPOXY ANCHORS
M
I N
10"
" 1
CL.
COL. &
PL.
CL.
COL. &
PL.
" THICK PL.
HSS 6x6x
, SEE PLAN
E
5-S3
TYPICAL BASE PL. @ EXIST. CONC. SLAB
SCALE: 1
" = 1'-0"
GENERAL NOTES
o n e q u a r t e r i n c e f o o t o n e e i g h t h i n c e f o o t t h r e e e i g h t h s i n c e f o o t
F o n e h a l f i n c e f o o t
E o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t
D
C
B t h r e e i n c h e e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked
DRAWING NO.
Project No.
Drawn
Date
Dwg. of Date
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety Manager
Operations Service Line
General Engineer
Service Line Manager
Manager
COTR
Service Line
BES DESIGN/BUILD, LLC
766 Middle Street
Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
NORTH
PROJECT LOCATION
KEY PLAN
PROJECT LOCATION
BUILDING 5 KEY
PLAN
5.1
5.2
5.4
5.3
5-S3
3 3
SECTIONS &
DETAILS
LEGENDS AND ABBREVIATIONS
SNS SNS
5-H1 1 10
GENERAL NOTES
LEGEND & ABBREVIATIONS
ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION
ABOVE FINISHED FLOOR AFF
A/C ABOVE CEILING
AIR HANDLING UNIT AHU
AP
BTUH
ACCESS PANEL
BRITISH THERMAL UNITS PER HOUR
CUBIC FEET PER MINUTE CFM
CLG CEILING
DOWN DN
DWGS DRAWINGS
EXHAUST AIR EA
EF EXHAUST FAN
ELECTRIC ELEC
EX. EXISTING
GALLONS PER MINUTE GPM
HVAC HEATING VENTILATING & AIR CONDITIONING
MAXIMUM MAX
MIN MINIMUM
TRANSFER GRILLE TG
TYP TYPICAL
VARIABLE AIR VOLUME UNIT VAV
CTE CONNECT TO EXISTING
HWS
HWR
MBV
GV
CV
CHS
CHR
MOV
FD
MLD/MD
HOT WATER SUPPLY
HOT WATER RETURN
METERED BALANCING VALVE
GATE VALVE
CHECK VALVE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MOTOR OPERATED (2-WAY) VALVE
STRAINER
UNION
FIRE DAMPER
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
DIRECTION OF FLOW
MANUAL DAMPER
ROUND DUCT
FLAT OVAL WIDTH X DEPTH
RECTANGULAR DUCT WIDTH X DEPTH
MISSING)
RECTANGULAR ELBOWS WITH VANES EVEN IF SYMBOL IS
VANED ELBOW ( PROVIDE ALL SQUARE OR
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
HWS
HWR
CHS
CHR
OR
WXD"
WXD
MITERED ELBOWS.
E. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE
SPIN-IN COLLAR WITH SCOOP AND DAMPER.
TO RECTANGULAR OR SQUARE DUCT WITH A
D. FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED
DIMENSIONS.
C. DUCT SIZES SHOWN ARE ACTUAL INSIDE
SENSORS 54 INCHES ABOVE FINISHED FLOOR.
SPACE THERMOSTATS, HUMIDISTATS AND
B. UNLESS OTHERWISE INDICATED, INSTALL ALL
PRIOR TO INSTALLATION.
A. COORDINATE ALL WORK WITH OTHER TRADES
DESIGN CONDITIONS
UNIT AREA
INSIDE OUTSIDE
HEAT. COOLING HEAT. COOLING
DB F WB F DB F DB F WB F
79.0 96.0 21.0 64.0 78.0 72.0 BUILDING 5 AHU-5.1 THRU AHU-5.4
DB F
MPS
MPR
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM RETURN
MPS
MPR
DUCT MOUNTED SMOKE DETECTOR
SKD SKD
ETR EXISTING TO REMAIN
UH
STH STEAM HUMIDIFIER
ROOF HOOD
UNIT HEATER
RH
o n e -q u a rt e r in c h o n e f o o t o n e -e ig h th i n c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t
F o n e -h a lf i n c h o n e f o o t
E o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t
D
C
B th re e i n c h e s o n e f o o t
A
1 2 3 4
F E
5 6 7 8
D C
B
A F
E D
F E
F E
Revisions
Date:
Date:
Date:
Date:
Approved:
Approved:
Approved:
Approved:
Approved:
Approved:
Drawing Title
Approved:
Approved:
Approved:
Approved: Date:
Date:
Date:
Date:
Date:
Date:
Location
Building Number
Project Title
Checked DRAWING NO.
Project No.
Drawn
Date
Dwg. ofDate
Seal: Medical Center Director
Associate Medical Center
Chief of Staff
Infection Control
Director
Safety…