ATTACHMENT A- Architectural Drawings.pdf

PDF 28 MB Posted

Attached to
Z1DA--Renovate Surgical Suite Phase II
Solicitation number
36C24626R0039
Issued by

About this file

This file is a comprehensive set of architectural drawings and design documents for the renovation of the Surgical Suite Phase II at Salem VA Medical Center. The project encompasses construction and renovation of eight operating rooms (including a hybrid OR, orthopedic OR, and six general ORs), pre-operative and post-anesthesia care unit (PACU) areas, and supporting facilities including clean core, corridors, equipment storage, and administrative spaces. The work includes selective demolition, new wall construction with fire-rated and smoke-rated partitions, installation of resinous and resilient flooring finishes, ceramic tile in wet areas, gypsum board ceilings with acoustical tile, and comprehensive interior finishes including casework, hardware, and wall protection systems. The project is organized into four sequential phases to maintain hospital operations, with Phase 1 focusing on construction of three new operating rooms and corridor work, Phase 2 on completing remaining ORs and the clean core, Phase 3 on pre-operative and recovery areas, and Phase 4 on final PACU work. Drawing details specify wall type schedules with fire ratings up to 2-hour barriers, smoke partitions, specialty coatings for infection control, electrical and data outlet locations, HVAC and medical gas coordination requirements, and accessibility features including grab bars and nurse call systems compliant with ICC A117.1-2009 standards. The architectural drawings indicate material selections such as Formica plastic laminates for countertops, Tarkett luxury vinyl tile and heat-welded sheet flooring, Daltile ceramic tile with epoxy grouting, Sherwin Williams paint finishes, and Inpro wall protection systems. Equipment schedules identify specialized medical devices including anesthesia machines, surgical tables, sterilization equipment, and IT infrastructure requiring coordination with contractors for power, data, and medical gas connections.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

ARCHITECTURAL SYMBOL LEGEND

TYPICAL TOILET ACCESSORY LOCATIONS

DEVICES MOUNTING HEIGHT

MISCELLANEOUS MOUNTING HEIGHTS

INTERIOR ELEVATIONS SYMBOL LEGEND

ABV.

AT

A.F.F.

ALUM.

ATH.

BD

BLKG

CC

CG

CLG

COL

CONC.

CONT.

CR

CT

DR

ELEC

EL

ELEV

ESRROI

ESRRCI

ESROI

ESRCI

ETR

EWC

EXIST.

EXST

FOF

F.O.S.

FIN

F.F.

FIN FL

FLR

GALV.

GL

GWB

GYP

HDW

HW

HCW

HM

HR

HT

ABOVE

ACOUSTICAL TILE

ABOVE FINISH FLOOR

ALUMINUM

ALUMINUM THRESHOLD

BOARD

BLOCKING

CUBICLE CURTAIN

CORNER GUARD

CEILING

COLUMN

CONCRETE

CONTINUOUS

CARD READER

CERAMIC TILE

DOOR

ELECTRIC(AL)

ELEVATION

ELEVATOR

EXISTING SALVAGED, RECONDITIONED,

RELOCATED, OWNER INSTALLED

EXISTING SALVAGED, RECONDITIONED,

RELOCATED, CONTRACTOR INSTALLED

EXISTING SALVAGED, RELOCATED,

OWNER INSTALLED

EXISTING SALVAGED, RELOCATED,

CONTRACTOR INSTALLED

EXISTING TO REMAIN

ELECTRIC WATER COOLER

EXISTING

EXISTING

FACE OF FINISH

FACE OF STUD

FINISH(ED)

FINISHED FACE

FINISHED FLOOR

FLOOR

GALVANIZED

GLAZING

GYSPUM WALLBOARD

GYPSUM

HARDWARE

HARDWARE

HOLLOW CORE WOOD

HOLLOW METAL

HOUR

HEIGHT

LAM.

L

LVT

MAX

MECH

MTG

MTL

NIC.

OFCI

OFOI

CFCI

CFOI

PL

P

PTD

R.

RA

RB

RES

SC

SG

SCW

S S.S.

WSF

SIM

STOR

SUSP.

TERR

TG

TME

T.O.G.

TP

TR.

TRTD

TYP

U.O.N.

VERT

VIF

VT

RWC

WIN

WAP

Ø

LAMINATED

LENGTH

LUXURY VINYL TILE

MAXIMUM

MECHANICAL

MOUNTING

METAL

NOT IN CONTRACT

OWNER FURNISHED CONTRACTOR INSTALLED

OWNER FURNISHED OWNER INSTALLED

CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CONTRACTOR FURNISHED OWNER INSTALLED

PLASTIC LAMINATE

PAINT

PAINTED

RISER

RETURN AIR

RESILIENT BASE

RESINOUS FLOORING

SEALED CONCRETE

SAFETY GLASS

SOLID CORE WOOD

SOLID SURFACE

STAINLESS STEEL

WELDED SHEET VINYL

SIMILAR

STORAGE

SUSPENDED

TERRAZZO

TEMPERED GLASS

TO MATCH EXISTING

TOP OF GRADE

TEMPERED

TREAD

TREATED

TYPICAL

UNLESS OTHERWISE NOTED

VERTICAL

VERIFY IN FIELD

VINYL TILE

VINYL WALL COVERING

WINDOW

WAVE PLATE

AT

ANGLE

CENTER LINE

DIAMETER

CL

COLUMN GRID NUMBER

A120

BUILDING ELEVATION

MARKER

DOOR TAG101

M350_SP

WWW

EXISTING DOOR

NEW DOOR

DEMO DOOR

NEW WALL

EXISTING WALL

DEMO WALL OR ITEMS

ABOVE OR BELOW

WALL TAG

ROOM NUMBER

REVISION TAG

EQUIPMENT TAG

TOILET ACCESSORY TAG

DEMOLITION NOTE

NEW WORK NOTE

DEMO ROOM NUMBER

A101

SIM

CURTAIN WALL AND

WINDOW MARKER

1i

INTERIOR ELEVATION

MARKER

SECTION OR WALL

SECTION NUMBER

EXISTING COLUMN

GRID NUMBER

XXX

A810

DETAIL MARKER

1 FINISH NOTES

A101

MATCHLINE

SHEET INDEX LEGEND

P1 - A 1 3 0

PHASE (IF APPLICABLE)

DISCIPLINE

SERIES

FLOOR LEVEL

1 -

2 -

3 -

4 -

5 -

6 -

7 -

8 -

9 -

FLOOR PLANS

REFLECTED CEILING PLANS

ROOF PLANS

BUILDING ELEVATIONS

BUILDING & WALL SECTIONS / DETAILS

SCHEDULES

ENLARGED PLANS

INTERIOR ELEVATIONS

VERTICAL CIRCULATION

WALL TYPE LEGEND

M 3 50 _ SP

MATERIAL

STUD/CORE SIZE

STC RATING

FIRE/SMOKE RATING

SMOKE PARTITION

1 HR FIRE BARRIER

SMOKE BARRIER

1 HR FIRE BARRIER AND SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER AND SMOKE BARRIER

LEAD LINED

SP

SB

1SB

2SB

L

3' - 4" TYP.

SIDE WALL GRAB BARS

GB42 - 42" HORIZONTAL

GB18 - 18" VERTICAL

TPD

GB36

ELEVATION - SIDE WALL

PLAN

ELEVATION - REAR WALL

1' - 0"

NOTES:

1. REFER TO TOILET ACCESSORY SCHEDULE FOR MOUNTING HEIGHTS AND BLOCKING REQUIREMENTS.

2. DIMENSIONS TO BE FOLLOWED U.O.N. REQUIREMENTS BASED ON ICC A117.1-2009, SECTIONS 604.1-604.7 FOR GRAB BARS AND TOILET ACCESSORIES. NURSE CALL LOCATION BASED ON FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2018, SECTION 2.1-8.5.1.3.

3. CONTRACTOR TO COORDINATE FLUSH VALVES AND ACCESS PANELS TO AVOID CONFLICT WITH HORIZONTAL GRAB BAR.

4. MITERED GRAB BARS IDENTIFIED AS ONE ACCESSORY IN ARCHITECTURAL DRAWINGS. CONTRACTOR TO FURNISH AND INSTALL, AS WELL AS COORDINATE

INSTALLATION.

5. SOAP AND PAPER DISPENSER DIMENSIONED LOCATIONS ARE FOR REFERENCE. THEY CAN VARY, DEPENDING ON SPACE REQUIREMENTS, OUTLET LOCATIONS, ETC. COORDINATE ANY CHANGES OF DISPENSER LOCATIONS WITH ARCHITECT.

6. REFER TO ELEVATIONS FOR CASEWORK INFORMATION.

M

IN

/2

5' - 0" MIN.

M

IN

GB18

GB42

GB36

TPD

T Y

P

10" TYP.-

SIDE WALL GRAB BARS

GB36 - 36" HORIZONTAL*

TOILET PAPER DISPENSERS

TPD - SINGLE, OR DOUBLE ROLL

NC

CL

2' - 0" MIN.

3' - 6" MAX.

'-0

M

IN

'-0

M

A X

* 24" HORIZONTAL GRAB BARS PERMITTED WHERE WALL

SPACE DOES NOT PERMIT 36" GRAB BARS DUE TO THE

LOCATION OF A RECESSED FIXTURE, AS PER

EXCEPTION 2 OF SECTION 604.5.2 (ICC A117.1-2009)

ACCESSORIES AT TOILETS

NURSE CALL

NC - WHERE APPLICABLE

3'-3" MIN.- 3'-5" MAX.

CL

CL

12" MAX.

MAX.

1' - 0"

MAX.

GB42

GB18

ACCESSORIES AT SINK

10" 1' - 2"

CASEWORK

PTSD

OF WALL/CABINET, TYP.

MIN. 15" FROM EDGE

CL

CLCL

FRONT ELEVATION

1' - 2" 11"1' - 3"

CASEWORK APRON

WHERE APPLICABLE

PTSD MI

CL

FRONT ELEVATION SIDE ELEVATIONSIDE ELEVATION

CLCL

SOAP PAPER TOWEL

SD PT

SOAP MIRROR PAPER TOWEL

SD MI PT

ACCESSORIES AT LAVATORIES

1' - 5" TYP.

1'-4" MIN.- 1'-6" MAX.

CL

FIRE HOSE

CABINET

FIRE

EXTINGUISHER

CABINET

PUBLIC

TELEPHONES

COAT RODS

& ROBE

HOOKS

ANY WIDTH

4' -0

" M A

X

4' -0

" M A

X

2' -3

" M A

X

4' -6

" M A

X

4' -0

" M A

X

4' -6

" M A

X

10" MAX.

ELECTRICAL AND DATA AT CASEWORK

T/DE

DN

U .O

.N

1' -6

TY

P U .O

.N

3' -8

TY

P

NURSE CALL

EQ (B) EQ (B)

E Q

(A

E Q

(A

IL

CB DS NC SA

U .O

.N

3' -8

TY

P

ELECTRICAL & TELEPHONE/DATA

T/D D

WT

T

T/D

U .O

.N

1' -6

" T Y

P

U .O

.N

3' -8

" T Y

P

U .O

.N

5' -0

" T Y

P

PHY

GF N

LS

E

DSOSVS

DOOR HARDWARE

CR KP

HO

PW

U .O

.N

3' -8

TY

P

PP

U .O

.N

6' -8

" T Y

P

FIRE ALARM & MECHANICAL EQ (B) EQ (B)

E Q

(A

E Q

(A

RPS

T

U .O

.N

3' -8

TY

P

5' -0

1'-0"

PS

S SS

TY

P

. W A

LL

M

O U

N

TE

D D

E V

IC

E

S

6' -8

" U .N

.O

TB WS

3' -6

ELECTRICAL AND DATA SPECIAL CONDITIONS

N

REF*

D N D

COPIER

N D

MEDICATION

DIPENSER

TVE D

T101, T102

TV MONITOR**

U .N

.O

7' -0

" T Y

P

U .O

.N

2' -0

" T Y

P

JB

SCONCE

7' -2

EMERGENCY

LIGHT

CLOCKS

7' -2

" U .O

.N

NOTE:

ANY ELECTRICAL AND DATA DEVICE NEXT TO A DOOR NEEDS TO BE LOCATED AT A MINIMUM OF 8" FROM DOOR FRAME.

NURSE CALL

NC NURSE CALL

IFV INTERCOM WITH VIDEO

PB PANIC BUTTON

DR DOOR RELEASE

IF INTERCOM

TELEPHONE/DATA

D DATA

DOOR HARDWARE

CR CARD READER

HO MAGNETIC HOLD OPEN

FHO MAGNETIC HOLD OPEN (LOW TO FLOOR)

PP PUSH PLATE

ELECTRICAL

N DUPLEX POWER

N QUAD POWER

LS LIGHT SWITCH

LS LIGHT SWITCH 3-GANG

JB JUNCTION BOX

FIRE ALARM

PS PULL STATION

S STROBE

SS SPEAKER AND STROBE

TB TERMINAL BOX

MECHANICAL

RPM ROOM PRESSURE MONITOR

RPS ROOM PRESSURE SENSOR

T THERMOSTAT

RPM

U .O

.N

6' -0

" T O

C E

N

TE

R O

F

TV

6"

4' -0

" M A

X

4' -6

" M A

X

AED

6"

DOOR HARDWARE FOR CARD READERS

U.O.N.

5' - 0"

U.O.N.

8' - 0"

CR

AT SINGLE

DOOR*

CR

AT DOUBLE

EGRESS DOORS*

DOOR SWING

*THIS APPLIES TO PUSH

PLATES(PP)/ACTUATORS

U.O.N.

CRCR

M A

X T

O B

U T

T O

N

IFV

* S & SS DEVICES IN CEILING IN BH LOCATIONS AS NOTED

E D

T/DN

WT LS

CONDITIONS AT WAINSCOT

U .O

.N

1' -6

" T Y

P

U .O

.N

3' -4

" T Y

P

P R

O

TE

C

TI

O N

L E

G E

N D

R E

FE

R

T O

W A

LL

P R

O T

E C

T

IO

N L

E G

E N

D R

E F

E R

T O

W A

L L

E D WT LS

N D

T104, T105

WALL

MOUNTED

COMPUTER**

M/W

N

U .O

.N

T Y

P

6"

EQ EQ

TYPICAL DIMENSION AT

MONITOR ON A COUNTER

OR DESK. THE OUTLETS

ARE SHOWN CENTERED

BY CAN SHIFT AS

REQUIRED.

FHOT

Y

P

NOTE: REFER TO MEPT DRAWINGS FOR SPECIFIC TYPES

COORDINATE

LOCATIONS W

BRACKET

O F

W A

LL

M

O N

IT

O

R

3' -8

" T O

C E

N

TE

R

2' -0

T123

DOCUMENTATION STATION

(WALL MTD)**

2' -8

" T O

B A

S E

COORDINATE OUTLET

LOCATIONS WITH CUT

SHEET

N D

7' -2

IF

D E

V

IC

E , U

.O .N

3' -8

" T O

T O

P O

F

U .O

.N

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:5

A M

A-001

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

ABBREVIATIONS, SYMBOLS, LEGENDS, NOTES

& WALL TYPE SCHEDULE 658-19-103

2025−12−30

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

T

Revisions: Date:

A B C D E F G H I

J K L

PHASE 1

PHASE 3

PHASE 4PHASE 2

PHASE 3

PATIENT ROOM

D-143

OFFICE

D-124

DIRTY UTILITY RM

D-142

CORRIDOR

D-147

WORK RM

D-123

MECH RM

IC-132

CORRIDOR

D-120

SEMI-RESTRICED

CORRIDOR

D-C123

CORRIDOR

D-148

TOILET

D-144

TOILET

D-145

ELECTRICAL

D-110

CLEAN LINEN

D-115

CLEAN SUPPLY

D-C133A

OR 4

D-C133

ELECTRICAL

D-C1037

EQUIPMENT

D-C131

IRM

D-C1038

OR 3

D-C130

OR 2

D-C126

OFFICE

D-C144

ANESTHESIA

WORKROOM

D-C122

OFFICE

D-C120

CLEAN CORE

D-C126D

DEMO

D-C126F

DEMO

D-C126C

DEMO

D-C126A

OR 5

D-C138

OR 6

D-C145

OR 7

D-C146

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002A

TOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

TOILET

D-142D

TOILET

D-142E

TOILET / SHOWER

D-C191

LOUNGE

D-C192

TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

PHASING NARRATIVE

PHASE 1:

DEMOLISH AREAS IN EXISTING PATIENT WING AS INDICATED TO BUILD 3 NEW OPERATING

ROOMS CORRIDORS AND PART OF CLEAN CORE. EXISTING OPERATING ROOMS AND CLEAN

CORE TO REMAIN IN OPERATION THE ENTIRE TIME. THE EXISTING LOUNGE AND

BATHROOMS ARE TO BE DEMOLISHED SO THAT THE NEW CORRIDOR CAN BE

CONSTRUCTED TO ALLOW CLEAN SUPPLIES TO REACH THE NEWLY CONSTRUCTED

OPERATING ROOMS IN PHASE 2.

PHASE 2:

AT THE BEGINGING OF THE PHASE A NEW TEMPORARY CORRIDOR FROM THE CLEAN

ELEVATOR THRU THE CLEAN CORE, TO THE NEW CORRIDOR CREATED IN PHASE 1, SHALL

BE CONSTRUCTED PRIOR TO ANY DEMOLITION. ONCE THE CORRIDOR IS COMPLETE

DEMOLISION OF EXISTING OPERATING ROOMS 2, 3, 4, 5, 6 AND REMAINING PORTIONS OF

THE CLEAN CORE CAN PROCEED. THE HYBRID OR AND THE TWO NEW OR'S BECOME

OPERATIONAL. NEW OR'S 4, 5, 6, THE REMANING CLEAN CORE, AND SUPPORT ROOMS ARE

BUILT OUT.

PHASE 3:

WORK IN EXISTING OR PREP TAKES PLACE. EXISTING PACU IS USED FOR PRE OP PREP AND

RECOVERY DURING THIS PHASE. NEW OFFICES AND STORAGE ROOM ARE BUILT OUT.

EXISTING OFFICES ARE RENOVATED.

PHASE 4:

WORK IN EXISTING PACU TAKES PLACE. NEW OR PREP AREA IS USED FOR PRE OP PREP

AND PACU DURING THIS PHASE. OFFICES ARE BUILT OUT AT THIS TIME.

GENERAL NOTES

1. SEE INDIVIDUAL ICRA PLANS,A-011 THRU A-015, FOR DETAILED PHASING DIAGRAMS AND

NOTES PER EACH PHASE.

2. ALL TEMPORARY PARTIONS SHALL BE REMOVED AT THE END OF EACH PHASE UNLESS

INDICATED THAT THEY MAY REMAIN IN PLACE AS PART OF THE PERMANENT WORK.

3. EXITING SURGICAL SOILED UTILITY ROOM PLUMBING WORK CAN BE DONE IN ANY PHASE.

COORDINATE WORK IN THE AREA WITH THE COR.

4. NEW DOOR TO MED GAS ROOM CAN BE DONE IN ANY PHASE. COORDINATE WORK WITH

COR

5. FINISHES WORK IN CORRIDOR SHALL BE COMPLETED AT THE END OF THE PHASES AND

DONE AFTER HOURS. COORDINATE WORK WITH COR.

6. CONTRACTOR TO REFER TO EACH DISCIPLINE DRAWINGS FOR COMPLETE SCOPE AND

AREA OF WORK PER PHASE.

CORRIDOR

D-C12

WAITING

D-C107

LOCKERS

D-C107A TLT

D-C107B

OFFICE

D-C16

OFFICE

D-C109

OFFICE

D-C108

OR 8

D-C106

TLT

D-C106B STORAGE

D-C106A

OFFICE

D-C108A

OFFICE

D-C109A

NURSE STATION

D-C18

OFFICE

D-C115

OFFICE

D-C124

PACU

D-C11

ISOLATION ROOM

D-C117ANTE

D-C119

DIRTY UTILITY

D-C125

EQUIP STORAGE

D-C112

BIO HZRD

D-C111

WAITING

D-C110

ANEST OFFICE

D-C116

OFFICE

D-C118

BREAK RM

D-C113

NURSE STATION

D-C12 RECOVERY

D-C13TLT

D-C114

GENERAL

STORAGE

D-C125A

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:0

A M

A-010

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

PHASING PLANS

FIRST FLOOR - OVERALL 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 FIRST FLOOR PLAN - OVERALL PHASING

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

OVERALL PHASING NOTES

1 HATCHED AREA INDICATES LOCATIONS WHERE PHASES HAVE AN OVERLAP OF WORK.

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

AO

AO

AO

AO

MIN

6' - 0"

6' - 0"

TYP.

TYP.

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT ROOM

D-D110

PATIENT ROOM

D-D109

PATIENT ROOM

D-D108

PCU ROOM

D-D1001

PCU ROOM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002A

TOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

GENERAL PHASING NOTES

1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED

TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT

UNDER CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION

WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE

CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.

3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL

INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.

4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT

THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION

OPERATIONS.

5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF

THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.

6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN

INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO

FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO

PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.

7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE

OWNER PRIOR TO COMMENCEMENT OF THE WORK.

8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING

CONSTRUCTION.

9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO

PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD

OF DUST.

11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE

NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE

OWNER TO MOVE.

12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY

UNLESS OTHERWISE NOTED.

13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL

BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF

THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY

EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.

PHASING COORDINATION

OWNER, ARCHITECT AND CONTRACTOR SHALL

REVIEW AND COORDINATE PHASING REQUIREMENTS

WHEN CONTRACT IS AWARDED.

LEGEND

CLEAN SUPPLIES

SOILED SUPPLIES

PATIENT TO SURGERY

PATIENT TO PACU

STARTING POINT

DIRECTION OF TRAVEL

CONTRACTOR

ACCESS

1 HOUR RATED

TEMPORARY

CONSTRUCTION WALL

RESTRICTED ACCESS

CORRIDOR

PHASING NOTES

1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO

PUBLIC.

2. 3/4 HR RATED DOOR AND HARDWARE.

3. VESTIBULE WITH WALK OFF MATS.

4. MAINTAIN CORRIDOR ACCESS AT ALL TIMES.

5. INSTALL DOOR AND CONTROLS DURING EVENINGS AND/OR

WEEKENDS.

6. INSTALL WALL DURING EVENINGS AND/OR WEEKENDS.

7. REMOVE AND REPLACE THIS DOOR AT THE END OF PHASE 1 AND

SEAL TIGHT AT ALL TIME DURING PHASE 1

PATIENT ROOM

D-143

OFFICE

D-124

DIRTY UTILITY RM

D-142

CORRIDOR

D-147

WORK RM

D-123

MECH RM

IC-132

CORRIDOR

D-120

SEMI-RESTRICED

CORRIDOR

D-C123

CORRIDOR

D-148

TOILET

D-144

TOILET

D-145

ELECTRICAL

D-110

CLEAN LINEN

D-115

CLEAN SUPPLY

D-C133A

OR 4

D-C133

ELECTRICAL

D-C1037

EQUIPMENT

D-C131

IRM

D-C1038

OR 3

D-C130

OR 2

D-C126

OFFICE

D-C144

ANESTHESIA

WORKROOM

D-C122

OFFICE

D-C120

CLEAN CORE

D-C126D

DEMO

D-C126F

DEMO

D-C126C

DEMO

D-C126A

OR 5

D-C138

OR 6

D-C145

OR 7

D-C146

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

TOILET

D-142D

TOILET

D-142E

TOILET / SHOWER

D-C191

LOUNGE

D-C192

TOILET

D-C193

TOILET

D-C194

OR 8

D-D1050

TOILET

D-C106B

STORAGE

D-C106A

OFFICE

D-C109A

OFFICE

D-C109

ISOLATION ROOM

D-C117

ANTE

D-C119

OFFICE

D-C118

ANEST OFFICE

D-C116

OFFICE

D-C115

BREAK RM

D-C113

RECOVERY

D-C13A

STORAGE

D-C112

GENERAL STOR

D-C125A

DIRTY UTILITIY

D-C125

OFFICE

D-C124 BIOHAZARD

D-C111

WAITING ROOM

D-C110

NURSE STATION

DC-12

PACU

DC-11

OFFICE

D-C108

OFFICE

D-C108A

TOILET

D-C114

PATIENT ROOM

D-140

PATIENT ROOM

D-139

PATIENT ROOM

D-138

PATIENT ROOM

D-137

NURSE STATION

D-121

MEDS

D-134

STAFF WORK

D-130

CORRIDOR

D-146

OFFICE

D-125

CLEAN SUPPLY

D-126

PATIENT ROOM

D-133

PATIENT ROOM

D-132

STAFF LOUNGE

D-129

HSK

D-131

STAFF TLT

D-128

ISOLATION ANTE

D-136

NIGHT CALL

D-122

EQUIP. STORAGE

D-127

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:1

A M

A-011

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

ICRA PLAN

FIRST FLOOR - PHASE 1 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR PLAN - PHASE 1

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

CR

CR

6' - 0"

TYP.

TYP.

2 3

TYP.

9' - 10"

CONTROL ROOM

1D-124

HYBRID OR

1D-123

OR-2

1D-125

OR-3 ROBOTIC

1D-126

SCRUB

STRETCHER

ALCOVE

STRETCHER

ALCOVE

SCRUB

CLEAN CORE

1C-120

STRETCHER

ALCOVE

CORRIDOR

C1-19

IT

1D-120

PUMP ROOM

1D-122

EQUIPMENT

1D-121

GENERAL PHASING NOTES

1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED

TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT

UNDER CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION

WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE

CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.

3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL

INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.

4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT

THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION

OPERATIONS.

5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF

THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.

6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN

INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO

FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO

PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.

7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE

OWNER PRIOR TO COMMENCEMENT OF THE WORK.

8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING

CONSTRUCTION.

9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO

PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD

OF DUST.

11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE

NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE

OWNER TO MOVE.

12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY

UNLESS OTHERWISE NOTED.

13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL

BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF

THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY

EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.

PHASING COORDINATION

OWNER, ARCHITECT AND CONTRACTOR SHALL

REVIEW AND COORDINATE PHASING REQUIREMENTS

WHEN CONTRACT IS AWARDED.

LEGEND

CLEAN SUPPLIES

SOILED SUPPLIES

PATIENT TO SURGERY

PATIENT TO PACU

STARTING POINT

DIRECTION OF TRAVEL

CONTRACTOR

ACCESS

1 HOUR RATED

TEMPORARY

CONSTRUCTION WALL

RESTRICTED ACCESS

CORRIDOR

PHASING NOTES

1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO

PUBLIC.

2. 3/4 HR RATED DOOR AND HARDWARE.

3. VESTIBULE WITH WALK OFF MATS.

4. INSTALL THIS DOOR PRIOR TO PHASE 2.

MECH RM

IC-132

CLEAN SUPPLY

D-C133A

OR 4

D-C133

ELECTRICAL

D-C1037

EQUIPMENT

D-C131

IRM

D-C1038

OR 3

D-C130

OR 2

D-C126

OFFICE

D-C144

ANESTHESIA

WORKROOM

D-C122

OFFICE

D-C120

CLEAN CORE

D-C126D

DEMO

D-C126F

DEMO

D-C126C

DEMO

D-C126A

OR 5

D-C138

OR 6

D-C145

OR 7

D-C146

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002A

TOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

TOILET

D-142D

TOILET / SHOWER

D-C191

LOUNGE

D-C192

TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

OR 8

D-D1050

TOILET

D-C106B

STORAGE

D-C106A

OFFICE

D-C109A

OFFICE

D-C109

ISOLATION ROOM

D-C117

ANTE

D-C119

OFFICE

D-C118

ANEST OFFICE

D-C116

OFFICE

D-C115

BREAK RM

D-C113

RECOVERY

D-C13A

STORAGE

D-C112

GENERAL STOR

D-C125A

DIRTY UTILITIY

D-C125

OFFICE

D-C124 BIOHAZARD

D-C111

WAITING ROOM

D-C110

NURSE STATION

DC-12

PACU

DC-11

OFFICE

D-C108

OFFICE

D-C108A

TOILET

D-C114

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:3

A M

A-012

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

ICRA PLAN

FIRST FLOOR - PHASE 2 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR PLAN - PHASE 2

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

CR

SL

CR

CR

CR

CR

AO

TYP.

TYP.

CLEAN CORE

1C-120

CORRIDOR

C1-24

SOILED

IC-1016 GAS

IC-1017

OR-6

1C-130

OR-7

1C-129

CONTROL ROOM

1D-124

HYBRID OR

1D-123

OR-2

1D-125

OR-3 ROBOTIC

1D-126

IT

1D-120

PUMP ROOM

1D-122

EQUIPMENT

1D-121

EQUIPMENT

STORAGE

1C-131

OR-4 ROBOTIC

1C-128

OR-5

1C-126

ORTHO STOR

C1-18

ANESTHESIA

WORKROOM

1C-127

HAC

1C-122

LINEN ALCOVE

1C-123

ELECTRICAL

1C-1037

GENERAL PHASING NOTES

1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED

TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT

UNDER CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION

WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE

CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.

3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL

INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.

4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT

THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION

OPERATIONS.

5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF

THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.

6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN

INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO

FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO

PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.

7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE

OWNER PRIOR TO COMMENCEMENT OF THE WORK.

8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING

CONSTRUCTION.

9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO

PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD

OF DUST.

11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE

NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE

OWNER TO MOVE.

12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY

UNLESS OTHERWISE NOTED.

13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL

BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF

THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY

EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.

PHASING COORDINATION

OWNER, ARCHITECT AND CONTRACTOR SHALL

REVIEW AND COORDINATE PHASING REQUIREMENTS

WHEN CONTRACT IS AWARDED.

LEGEND

CLEAN SUPPLIES

SOILED SUPPLIES

PATIENT TO SURGERY

PATIENT TO PACU

STARTING POINT

DIRECTION OF TRAVEL

CONTRACTOR

ACCESS

1 HOUR RATED

TEMPORARY

CONSTRUCTION WALL

RESTRICTED ACCESS

CORRIDOR

PHASING NOTES

1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO

PUBLIC.

2. 3/4 HR RATED DOOR AND HARDWARE.

3. VESTIBULE WITH WALK OFF MATS.

4. REMOVE DOOR AND INFILL THE OPENING AFTER HOURS OR ON

WEEKEND.

5. TEMPORARY PARTITIONS MAY BECOME PERMANENT WALLS AT THE

END OF PHASE.

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002A

TOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

LOUNGE

D-C192

TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

OR 8

D-D1050

TOILET

D-C106B

STORAGE

D-C106A

OFFICE

D-C109A

OFFICE

D-C109

ISOLATION ROOM

D-C117

ANTE

D-C119

OFFICE

D-C118

ANEST OFFICE

D-C116

OFFICE

D-C115

BREAK RM

D-C113

RECOVERY

D-C13A

STORAGE

D-C112

GENERAL STOR

D-C125A

DIRTY UTILITIY

D-C125

OFFICE

D-C124 BIOHAZARD

D-C111

WAITING ROOM

D-C110

NURSE STATION

DC-12

PACU

DC-11

OFFICE

D-C108

OFFICE

D-C108A

TOILET

D-C114

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:4

A M

A-013

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

ICRA PLAN

FIRST FLOOR - PHASE 3 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 ICRA -FIRST FLOOR PLAN - PHASE 3

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

CR

CR

AO

AO

CR

AO

SL

CR

AO

CR

CR

CR

CR

AO

AO

CR

AO

TYP.

TYP.

SCRUB

SCRUB

SCRUB

OR-4 ROBOTIC

1C-128 OR-5

1C-131

ORTHO STOR

1C-132

ANESTHESIA

WORKROOM

1C-133

HAC

1C-134

LINEN ALCOVE

1C-135

ELECTRICAL

1C-1037

CLEAN CORE

1C-120

OR-1 HYBRID OR

1D-123

OR-2

1D-125

OR-3 ROBOTIC

1D-126

CONTROL ROOM

1D-124

SOILED

IC-1016 GAS

IC-1017

EQUIPMENT

STORAGE

1C-136

OR-6

1C-130

OR-7

1C-129

GENERAL PHASING NOTES

1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED

TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT

UNDER CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION

WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE

CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.

3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL

INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.

4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT

THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION

OPERATIONS.

5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF

THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.

6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN

INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO

FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO

PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.

7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE

OWNER PRIOR TO COMMENCEMENT OF THE WORK.

8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING

CONSTRUCTION.

9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO

PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD

OF DUST.

11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE

NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE

OWNER TO MOVE.

12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY

UNLESS OTHERWISE NOTED.

13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL

BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF

THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY

EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.

PHASING COORDINATION

OWNER, ARCHITECT AND CONTRACTOR SHALL

REVIEW AND COORDINATE PHASING REQUIREMENTS

WHEN CONTRACT IS AWARDED.

LEGEND

CLEAN SUPPLIES

SOILED SUPPLIES

PATIENT TO SURGERY

PATIENT TO PACU

STARTING POINT

DIRECTION OF TRAVEL

CONTRACTOR

ACCESS

1 HOUR RATED

TEMPORARY

CONSTRUCTION WALL

RESTRICTED ACCESS

CORRIDOR

PHASING NOTES

1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO

PUBLIC.

2. 3/4 HR RATED DOOR AND HARDWARE.

3. VESTIBULE WITH WALK OFF MATS.

4. PRIOR TO INSTALL ICRA WALL, REMOVE WALL AND DOOR COMPLETE.

WORK IN THIS AREA SHALL BE PERFORMED AFTER HOURS OR ON

WEEKENDS.

5. TEMPORARY PARTITIONS MAY BECOME PERMANENT WALLS AT THE

END OF PHASE.

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002A

TOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

LOUNGE

D-C192

TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

ISOLATION ROOM

D-C117

ANTE

D-C119

OFFICE

D-C118

ANEST OFFICE

D-C116

OFFICE

D-C115

BREAK RM

D-C113

RECOVERY

D-C13A

STORAGE

D-C112

GENERAL STOR

D-C125A

DIRTY UTILITIY

D-C125

OFFICE

D-C124 BIOHAZARD

D-C111

WAITING ROOM

D-C110

NURSE STATION

DC-12

PACU

DC-11

TOILET

D-C114

OFFICE

D-C190

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:0

A M

A-014

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

ICRA PLAN

FIRST FLOOR - PHASE 4 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR DEMOLITION PLAN - PHASE 4

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

J K L

SERVICE BAY

BD-123

SERVICE BAY

D-123A

STAIR

NO-7

TRANSFORMER

ROOM 2

BD-122

SWITCHBOARD

D-122A

DISPATCH AREA

D-117B

STORAGE

BD-117A

STERILE

BD-117C

HAC

BD-112

ST. PREP ROOM

BD-103A

CART WASH

BD-104

EQ. GAS CYL

STOR

BD-110

HAC

BD-105

EQUIP WASH

BD-106

TOILET

BD-116A

TOILET

BD-115A

LOCKERS

BD-116

CORRIDOR

BD-156

LOUNGE

BD-113

ELEV / MACHINE

BD-109

COMPUTER

BD-114A

LOCKERS

BD-115

CLERICAL

BD-114

CORRIDOR

CB-30

CHIEF

BD-114C

STERILE PACK

ROOM

BD-108

TOILET

BD-107A

SHOWER-M

BD-107

SHWR/LKR-F

BD-102A

TOILET

D-102

BATT RECHARGE

BD-101

ELEC

BD-100

CORRECT. THER

BC-113

EQUIP, STOR

BC-112

CLINIC ADMIN

BC-111

HUBBARD TANKS

BC-107A

SPEC.

TREATMENT

BC109

EQUIP STOR

D-181

TLT

BC-114

TELE

BC-110

EXAM

BC-115

BEDROOM

D-185

OCCUP. THERAPY

BC-116

TOILET

BC-117B

TLT

BC-118

SPLINTING

BC-120

CLINIC

D-190

CORRIDOR

CB-32

TREATMENT

BC-101A

PHYS THERAPY

BC-101

PHYS THERAPY

BC-104

EQUIP STOR

BC-106

TLT

BC-107

TLT

BC-103

DRESS

BC-103A

STAIR

NO-1

CORRIDOR

CB-24

STORAGE

D-202

CORRIDOR

CB-27OFFICE

BD-111

HALLWAY

CB-34

EQUIP. STORAGE

AND TEST

BD-117

CART DRY

IC-125

DECONTAMINATION

ROOM

BD-103

KITCHEN

BC-117

ELEC

BC-108

UTILITY

BC-102

HAC

BC-100

CORRIDOR

CB-35A

CHIEF

BD-114B

ENGINEER -

CONTRACTOR

CENTER

BD-124

TYP.

ARM & LEG

WHRLP

BD-107B

A.F.F.

GWB

7' - 10"

A.F.F.

TME

8' - 0"

AE500

TYP.

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:0

A M

AD100

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

DEMOLITION PLAN

BASEMENT 658-19-103

2025−12−30

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

SCALE: 3/32" = 1'-0"1 BASEMENT CEILING DEMOLITION AND NEW WORK PLAN

GENERAL DEMOLITION NOTES

1 DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT.

ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A

DECISION.

2 THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.

3 THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING

BUT NOT LIMITED TO PLUMBING, MECHANICAL, AND ELECTRICAL WORK.

4 THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW

FINISHES.

5 THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.

6 IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON

THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.

7 WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE

AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.

8 ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE

OWNER.

9 ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY, UNLESS OTHERWISE NOTED. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.

10 ALL NOTES, REMARKS, AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY, UNLESS OTHERWISE NOTED.

11 ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.

12 EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY BY THE CONTRACTOR FOR NEW FINISHES PER THE FINISH SCHEDULE.

13 WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH

CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.

14 THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.

15 THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING

BUT NOT LIMITED TO PLUMBING, MECHANICAL, AND ELECTRICAL WORK.

16 THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC., AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE PAINTED OR

COVERED WITH WALL COVERING.

17 ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT, UNLESS OTHERWISE NOTED.

18 THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.

19 THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW

FINISHES.

20 IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON

THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.

21 WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE

AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.

22 ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE

OWNER.

23 ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY, UNLESS OTHERWISE NOTED. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.

24 ALL NOTES, REMARKS, AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY, UNLESS OTHERWISE NOTED.

25 ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.

26 EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY BY THE CONTRACTOR FOR NEW FINISHES PER THE FINISH SCHEDULE.

27 THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC., AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE PAINTED OR

COVERED WITH WALL COVERING.

28 ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT, UNLESS OTHERWISE NOTED.

29 THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING EVENINGS AND/OR WEEKENDS.

DEMOLITION NOTES - BASEMENT CEILING

1 HATCHED AREA INDICATES APPROXIMATE AREA OF PLUMBING WORK ABOVE, REFER TO NEW WORK PLAN AND PLUMBING DRAWINGS. REWORK CEILING AS REQUIRED TO ACCOMMODATE NEW WORK. COORDINATE WITH COR FOR AREA ACCESS AND PERMITED WORK TIMES. CONTRACTOR IS

RESPONSIBLE FOR TEMPORARY ICRA BARRIERS FOR ISOLATED WORK AREAS.

2 HATCHED AREA INDICATES APPROXIMATE AREA OF STRUCTURAL WORK ABOVE, REFER TO NEW WORK PLAN AND STRUCTURAL DRAWINGS.

REWORK CEILING AS REQUIRED TO ACCOMMODATE NEW WORK. COORDINATE WITH COR FOR AREA ACCESS AND PERMITED WORK TIMES.

CONTRACTOR IS RESPONSIBLE FOR TEMPORARY ICRA BARRIERS FOR ISOLATED WORK AREAS.

3 PROVIDE ICRA BARRIER.

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

J K L

OR-2

1D-125

OR-3 ROBOTIC

1D-126

OR-4 ROBOTIC

1C-128

ORTHO STOR

1C-125

OR-6

1C-130

CYLINDER

STORAGE

1C-143

SOILED

1C-142

CORRIDOR

C1-18

CORRIDOR

C1-19

CORRIDOR

C1-16

OFFICE

1C-155

OFFICE

1C-154

OFFICE

1C-153

OFFICE

1C-152

EXIST. WAITING

1C-150

SOILED

1C-119

CLEAN

1C-118

LOUNGE

1C-114A

ISOLATION

1C-116

NURSE STATION

1C-115A

EQUIPMENT

1C-111

MEDS

1C-113

PRE-OP

1C-105

HAC

1C-108

TOILET

1C-114B

CORRIDOR

C1-14

STORAGE

1C-110

ANTE

1C-117

EQUIPMENT

STORAGE

1C-136

CORRIDOR

C1-17

CONTROL ROOM

1D-124

IT

1D-120

EQUIPMENT

1D-121

PUMP

1D-122

OR-1 HYBRID

1D-123

NURSE

1C-105A

COMM CTR

1C-106

PACU

1C-115

EQUIPMENT

ALCOVE

TOILET

1C-109

STAIR

S-8

STORAGE

1C-124

OR-7

1C-129

HAC

1C-122

LINEN ALCOVE

1C-123

CORRIDOR

C1-9

CLEAN CORE

1C-120

ANESTHESIA

WORKROOM

1C-127

CORRIDOR

C1-15

CORRIDOR

C1-3

CORRIDOR

C1-12

CORRIDOR

C1-13

OR-5 ORTHO

1C-131

OFFICE

1C-151

CORRIDOR

C1-11

CORRIDOR

C1-10

LOCKERS

1C-114C

LINEN CLOSET

1C-107

NURSE/ COMM

CENTER

1C-156

C -1

.2

D

-1

D

-1 A

D

-1

C

-1

1D-123B

D

-1 B

D

-1 B

D

-1 A

D

-1 A

D

-1 A

D

-1 A

D

-1 B

S -8

C

-1 B

C

-1 A

C

-1 A

C

-1 A

C -9

A

1C-127G

C

-1 B

C

-1 B

C

-1

1C-122

C -1

1C-127J

C

-1 A

C

-1 A

1C-131

C

-1 B

C

-1 B

1C-120B

C -1

1C-127C

C1-9B

C

-1 B

C

-1

1C-105A

1C-127F

1C-107

1C-105B

1C-113

1C-108

C

-1 C

1C-109

1C-114C 1C-111A

1C-115A

1C-110

C

-1 B

C

-1

C

-1 B

1C-117A

C

-1

1C-115B

C

-1

C

-1

C

-1

C

-1

C

-1

C

-1

OFFICE

1C-157

PATIENT RM

PATIENT RM

PATIENT RM

PATIENT RM

NURSE

STATION

CLEAN

MED

HTM

ELECTSOILED

HOLDING

IRM

RECOVERY

CCLO

NOURISH

PCU LOUNGE

/ LOCKERS

WORK ROOM

PCU

EQUIPMENT

PCU OFFICE

PCU OFFICE

GROUP

OFFICE

HSK

IRM

DEC

OFFICE

OFFICE

OFFICE

LOGISTICS

TLT

PCU

ROOM

PCU

ANTE

STORAGE

HSK

E L

E C

T R

IC

A

L

C L

O S

E T

PATIENT RM PATIENT RM PATIENT RM

C -1

.1

C

-1

NOT IN

ARCHITECTURAL

SCOPE

NOT IN

ARCHITECTURAL

SCOPE

A

AE500

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:2

A M

AE100

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

NEW WORK PLAN

FIRST FLOOR - OVERALL 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 OVERALL NEW WORK PLAN - FIRST FLOOR

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

OVERALL NEW WORK PLAN

IS FOR REFERENCE ONLY.

SEE ENLARGED NEW WORK

PLANS FOR DETAILED

INFORMATION

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

J K L

1D-125

1D-126

1C-128

1C-125

C1-16

1C-142

1C-143

C1-18

C1-19

1C-115

1C-105

1C-111

1C-113

1C-116

1C-114A

1C-118

1C-117

1C-114B

1C-106

1C-109

1C-110

1C-1541C-155 1C-153 1C-152 1C-150

1C-119

C1-15

1D-120

1D-121

1D-122

1D-123

1D-124

1C-112

1C-108

1C-115A

1C-105A

1C-114C

1C-131

1C-122

1C-123

C1-10

C1-9

1C-124

1C-107

C1-12

C1-11

1C-130

1C-129

1C-120 1C-120

C1-11

1C-127

NOT IN

ARCHITECTURAL

SCOPE

1C-151 1C-156

1C-157

1C-120

1C-136

C1-17

NOT IN

ARCHITECTURAL

SCOPE

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASING LEGEND

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:3

A M

AC100

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP MAT / SKC

BID DOCUMENTS

FULLY SPRINKLERED

REFLECTED CEILING PLAN

FIRST FLOOR - OVERALL 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 OVERALL REFLECTED CEILING PLAN - FIRST FLOOR

BUILDING 143

KEY PLAN

PLAN

NORTH

PHASE 2

PHASE 1

PHASE 3

PHASE 3

PHASE 4

ACTUAL

NORTH

NOT IN SCOPE

NOT IN SCOPE

OVERALL REFLECTED CEILING

PLAN IS FOR REFERENCE

ONLY. SEE ENLARGED

REFLECTED CEILING PLANS

FOR DETAILED INFORMATION

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

OL

CR

CR

CR

AO

SL

CR

AO

OL OL OL

CR

AO

SL

OL

CR

CR

CR

CR

AO

A B C D E F G H I

J K L

OR-1 HYBRID

1D-123

RES-1

RES-1 (A)

SC-1/ RWC-1

OR-2

1D-125

RES-1

RES-1 (A)

SC-1/ RWC-1

OR-3 ROBOTIC

1D-126

RES-1

RES-1 (A)

SC-1/ RWC-1

CONTROL ROOM

1D-124

RES-1

RES-1

SC-1

CORRIDOR

C1-9

RB-1

LVT-1 (A)

P-1

PUMP

1D-122

RES-1

RES-1

SC-1, RWC-1

EQUIPMENT

1D-121

RES-1

RES-1

SC-1, RWC-1

IT

1D-120

RB-1

WSF-1

P-1

CLEAN CORE

1C-120

RES-1

RES-1

SC-1, RWC-1

CORRIDOR

C1-19

RB-1

LVT-1 (A)

P-1, WP-A

CORRIDOR

C1-18

RB-1

LVT-1 (A)

P-1, WP-A

OR-4 ROBOTIC

1C-128

RES-1

RES-1 (A)

SC-1/ RWC-1

ANESTHESIA

WORKROOM

1C-127

RES-1

RES-1

SC-1

OR-5 ORTHO

1C-131

RES-1

RES-1 (A)

SC-1/ RWC-1

CLEAN CORE

1C-120

RES-1

RES-1

SC-1, RWC-1

STORAGE

1C-124

WSF-1

WSF-1

P-1, RWC-1

OFFICE

1C-157

RB-1

LVT-1

P-1 (A)

NURSE/ COMM

CENTER

1C-156

RB-1

LVT-1

P-1

OFFICE

1C-155

RB-1

LVT-1

P-1 (A)

OFFICE

1C-154

RB-1

LVT-1

P-1 (A)

OFFICE

1C-153

RB-1

LVT-1

P-1 (A)

OFFICE

1C-152

RB-1

LVT-1

P-1 (A)

OFFICE

1C-151

RB-1

LVT-1

P-1 (A)

EXIST. WAITING

1C-150

RB-1

LVT-1

P-3

CORRIDOR

C1-10

RB-1

LVT-1 (A)

P-1

LINEN ALCOVE

1C-123

RB-1

LVT-3

P-1

HAC

1C-122

RES-1

RES-1

SC-1, PT-1

ORTHO STOR

1C-125

RES-1

RES-1

SC-1, RWC-1

EXIST IT

1C-121

ETR

ETR

ETR

CLEAN

1C-118

RB-1

WSF-1

SC-1. RWC-1

SOILED

1C-119

WSF-1

WSF-1

SC-1, RWC-1

PACU

1C-115

RB-1

WSF-1 (A)

SC-1 (A)

NURSE STATION

1C-115A

RB-1

WSF-3

SC-1 (A)

ANTE

1C-117

RB-1

WSF-1

SC-1

ISOLATION

1C-116

RB-1

WSF-2

SC-1 (A)

TOILET

1C-114B

CTB-1

CT-3

SC-1, CT-1, CT-2

LOUNGE

1C-114A

RB-1

LVT-2

P-1 (A)

EQUIPMENT

ALCOVE

1C-112

WSF-1

WFS-1

SC-2, RWC-3

CORRIDOR

C1-12

RB-1

LVT-1 (A)

P-1

COMM CTR

1C-106

RB-1

WSF-1

SC-1 (A)

LINEN CLOSET

1C-107

RB-1

WSF-1

P-1, RWC-1

MEDS

1C-113

WSF-1

WSF-1

SC-1

HAC

1C-108

RES-1

RES-1

SC-1, RWC-1

EQUIPMENT

1C-111

RB-1

WSF-1

SC-1, RWC-1

NURSE

1C-105A

RB-1

WSF-1

SC-1 (A)

PRE-OP

1C-105

RB-1

WSF-1 (A)

SC-1, RWC-2

TOILET

1C-109

CTB-1

CT-3

SC-1, CT-1, CT-2

CORRIDOR

C1-3

ETR

ETR

ETR

STORAGE

1C-110

RB-1

WSF-2

SC-1, RWC-1

EQUIPMENT

STORAGE

1C-136

WSF-1

WSF-1

RES-W2,RWC-1

CORRIDOR

C1-17

RB-1

LVT-1 (A)

P-1

OR-6

1C-130

RES-1

RES-1

SC-1/ RWC-1

OR-7

1C-129

RES-1

RES-1

SC-1/ RWC-1

OR-7

1C-129

RES-1

RES-1

SC-1/ RWC-1

CORRIDOR

C1-16

RB-1

LVT-1 (A)

P-1

SOILED

1C-142

ETR

ETR

ETR

CYLINDER

STORAGE

1C-143

ETR

ETR

ETR

CORRIDOR

C1-13

RB-1

WSF-1

RES-W2,RWC-1

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD PF&A DESIGN, P.C.

REGISTERED ARCHITECTCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot

6" 0 one inch = one foot

6" 0 one and one half inch = one foot

6" 0 three inch = one foot

6"

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

ARCHITECTURAL

M-R PROJECT NO:0499-0136

Jon Manninen, COR

VA Drawing Number

Project Number

Fire Protection:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:4

A M

AI100

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

2025-12-30 DJP HLJ

BID DOCUMENTS

FULLY SPRINKLERED

FINISH PLAN

FIRST FLOOR - OVERALL 658-19-103

2025−12−30

SCALE: 1/8" = 1'-0"1 OVERALL FINISH PLAN - FIRST FLOOR

OVERALL FINISH PLAN IS

FOR REFERENCE ONLY.

SEE…