ATTACHMENT A- Architectural Drawings.pdf
PDF 28 MB Posted
- Attached to
- Z1DA--Renovate Surgical Suite Phase II
- Solicitation number
- 36C24626R0039
About this file
This file is a comprehensive set of architectural drawings and design documents for the renovation of the Surgical Suite Phase II at Salem VA Medical Center. The project encompasses construction and renovation of eight operating rooms (including a hybrid OR, orthopedic OR, and six general ORs), pre-operative and post-anesthesia care unit (PACU) areas, and supporting facilities including clean core, corridors, equipment storage, and administrative spaces. The work includes selective demolition, new wall construction with fire-rated and smoke-rated partitions, installation of resinous and resilient flooring finishes, ceramic tile in wet areas, gypsum board ceilings with acoustical tile, and comprehensive interior finishes including casework, hardware, and wall protection systems. The project is organized into four sequential phases to maintain hospital operations, with Phase 1 focusing on construction of three new operating rooms and corridor work, Phase 2 on completing remaining ORs and the clean core, Phase 3 on pre-operative and recovery areas, and Phase 4 on final PACU work. Drawing details specify wall type schedules with fire ratings up to 2-hour barriers, smoke partitions, specialty coatings for infection control, electrical and data outlet locations, HVAC and medical gas coordination requirements, and accessibility features including grab bars and nurse call systems compliant with ICC A117.1-2009 standards. The architectural drawings indicate material selections such as Formica plastic laminates for countertops, Tarkett luxury vinyl tile and heat-welded sheet flooring, Daltile ceramic tile with epoxy grouting, Sherwin Williams paint finishes, and Inpro wall protection systems. Equipment schedules identify specialized medical devices including anesthesia machines, surgical tables, sterilization equipment, and IT infrastructure requiring coordination with contractors for power, data, and medical gas connections.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
TYPICAL TOILET ACCESSORY LOCATIONS
DEVICES MOUNTING HEIGHT
MISCELLANEOUS MOUNTING HEIGHTS
INTERIOR ELEVATIONS SYMBOL LEGEND
ABV.
AT
A.F.F.
ALUM.
ATH.
BD
BLKG
CC
CG
CLG
COL
CONC.
CONT.
CR
CT
DR
ELEC
EL
ELEV
ESRROI
ESRRCI
ESROI
ESRCI
ETR
EWC
EXIST.
EXST
FOF
F.O.S.
FIN
F.F.
FIN FL
FLR
GALV.
GL
GWB
GYP
HDW
HW
HCW
HM
HR
HT
ABOVE
ACOUSTICAL TILE
ABOVE FINISH FLOOR
ALUMINUM
ALUMINUM THRESHOLD
BOARD
BLOCKING
CUBICLE CURTAIN
CORNER GUARD
CEILING
COLUMN
CONCRETE
CONTINUOUS
CARD READER
CERAMIC TILE
DOOR
ELECTRIC(AL)
ELEVATION
ELEVATOR
EXISTING SALVAGED, RECONDITIONED,
RELOCATED, OWNER INSTALLED
EXISTING SALVAGED, RECONDITIONED,
RELOCATED, CONTRACTOR INSTALLED
EXISTING SALVAGED, RELOCATED,
OWNER INSTALLED
EXISTING SALVAGED, RELOCATED,
CONTRACTOR INSTALLED
EXISTING TO REMAIN
ELECTRIC WATER COOLER
EXISTING
EXISTING
FACE OF FINISH
FACE OF STUD
FINISH(ED)
FINISHED FACE
FINISHED FLOOR
FLOOR
GALVANIZED
GLAZING
GYSPUM WALLBOARD
GYPSUM
HARDWARE
HARDWARE
HOLLOW CORE WOOD
HOLLOW METAL
HOUR
HEIGHT
LAM.
L
LVT
MAX
MECH
MTG
MTL
NIC.
OFCI
OFOI
CFCI
CFOI
PL
P
PTD
R.
RA
RB
RES
SC
SG
SCW
S S.S.
WSF
SIM
STOR
SUSP.
TERR
TG
TME
T.O.G.
TP
TR.
TRTD
TYP
U.O.N.
VERT
VIF
VT
RWC
WIN
WAP
Ø
LAMINATED
LENGTH
LUXURY VINYL TILE
MAXIMUM
MECHANICAL
MOUNTING
METAL
NOT IN CONTRACT
OWNER FURNISHED CONTRACTOR INSTALLED
OWNER FURNISHED OWNER INSTALLED
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CONTRACTOR FURNISHED OWNER INSTALLED
PLASTIC LAMINATE
PAINT
PAINTED
RISER
RETURN AIR
RESILIENT BASE
RESINOUS FLOORING
SEALED CONCRETE
SAFETY GLASS
SOLID CORE WOOD
SOLID SURFACE
STAINLESS STEEL
WELDED SHEET VINYL
SIMILAR
STORAGE
SUSPENDED
TERRAZZO
TEMPERED GLASS
TO MATCH EXISTING
TOP OF GRADE
TEMPERED
TREAD
TREATED
TYPICAL
UNLESS OTHERWISE NOTED
VERTICAL
VERIFY IN FIELD
VINYL TILE
VINYL WALL COVERING
WINDOW
WAVE PLATE
AT
ANGLE
CENTER LINE
DIAMETER
CL
COLUMN GRID NUMBER
A120
BUILDING ELEVATION
MARKER
DOOR TAG101
M350_SP
WWW
EXISTING DOOR
NEW DOOR
DEMO DOOR
NEW WALL
EXISTING WALL
DEMO WALL OR ITEMS
ABOVE OR BELOW
WALL TAG
ROOM NUMBER
REVISION TAG
EQUIPMENT TAG
TOILET ACCESSORY TAG
DEMOLITION NOTE
NEW WORK NOTE
DEMO ROOM NUMBER
A101
SIM
CURTAIN WALL AND
WINDOW MARKER
1i
INTERIOR ELEVATION
MARKER
SECTION OR WALL
SECTION NUMBER
EXISTING COLUMN
GRID NUMBER
XXX
A810
DETAIL MARKER
1 FINISH NOTES
A101
MATCHLINE
SHEET INDEX LEGEND
P1 - A 1 3 0
PHASE (IF APPLICABLE)
DISCIPLINE
SERIES
FLOOR LEVEL
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
FLOOR PLANS
REFLECTED CEILING PLANS
ROOF PLANS
BUILDING ELEVATIONS
BUILDING & WALL SECTIONS / DETAILS
SCHEDULES
ENLARGED PLANS
INTERIOR ELEVATIONS
VERTICAL CIRCULATION
WALL TYPE LEGEND
M 3 50 _ SP
MATERIAL
STUD/CORE SIZE
STC RATING
FIRE/SMOKE RATING
SMOKE PARTITION
1 HR FIRE BARRIER
SMOKE BARRIER
1 HR FIRE BARRIER AND SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER AND SMOKE BARRIER
LEAD LINED
SP
SB
1SB
2SB
L
3' - 4" TYP.
SIDE WALL GRAB BARS
GB42 - 42" HORIZONTAL
GB18 - 18" VERTICAL
TPD
GB36
ELEVATION - SIDE WALL
PLAN
ELEVATION - REAR WALL
1' - 0"
NOTES:
1. REFER TO TOILET ACCESSORY SCHEDULE FOR MOUNTING HEIGHTS AND BLOCKING REQUIREMENTS.
2. DIMENSIONS TO BE FOLLOWED U.O.N. REQUIREMENTS BASED ON ICC A117.1-2009, SECTIONS 604.1-604.7 FOR GRAB BARS AND TOILET ACCESSORIES. NURSE CALL LOCATION BASED ON FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2018, SECTION 2.1-8.5.1.3.
3. CONTRACTOR TO COORDINATE FLUSH VALVES AND ACCESS PANELS TO AVOID CONFLICT WITH HORIZONTAL GRAB BAR.
4. MITERED GRAB BARS IDENTIFIED AS ONE ACCESSORY IN ARCHITECTURAL DRAWINGS. CONTRACTOR TO FURNISH AND INSTALL, AS WELL AS COORDINATE
INSTALLATION.
5. SOAP AND PAPER DISPENSER DIMENSIONED LOCATIONS ARE FOR REFERENCE. THEY CAN VARY, DEPENDING ON SPACE REQUIREMENTS, OUTLET LOCATIONS, ETC. COORDINATE ANY CHANGES OF DISPENSER LOCATIONS WITH ARCHITECT.
6. REFER TO ELEVATIONS FOR CASEWORK INFORMATION.
M
IN
/2
5' - 0" MIN.
M
IN
GB18
GB42
GB36
TPD
T Y
P
10" TYP.-
SIDE WALL GRAB BARS
GB36 - 36" HORIZONTAL*
TOILET PAPER DISPENSERS
TPD - SINGLE, OR DOUBLE ROLL
NC
CL
2' - 0" MIN.
3' - 6" MAX.
'-0
M
IN
'-0
M
A X
* 24" HORIZONTAL GRAB BARS PERMITTED WHERE WALL
SPACE DOES NOT PERMIT 36" GRAB BARS DUE TO THE
LOCATION OF A RECESSED FIXTURE, AS PER
EXCEPTION 2 OF SECTION 604.5.2 (ICC A117.1-2009)
ACCESSORIES AT TOILETS
NURSE CALL
NC - WHERE APPLICABLE
3'-3" MIN.- 3'-5" MAX.
CL
CL
12" MAX.
MAX.
1' - 0"
MAX.
GB42
GB18
ACCESSORIES AT SINK
10" 1' - 2"
CASEWORK
PTSD
OF WALL/CABINET, TYP.
MIN. 15" FROM EDGE
CL
CLCL
FRONT ELEVATION
1' - 2" 11"1' - 3"
CASEWORK APRON
WHERE APPLICABLE
PTSD MI
CL
FRONT ELEVATION SIDE ELEVATIONSIDE ELEVATION
CLCL
SOAP PAPER TOWEL
SD PT
SOAP MIRROR PAPER TOWEL
SD MI PT
ACCESSORIES AT LAVATORIES
1' - 5" TYP.
1'-4" MIN.- 1'-6" MAX.
CL
FIRE HOSE
CABINET
FIRE
EXTINGUISHER
CABINET
PUBLIC
TELEPHONES
COAT RODS
& ROBE
HOOKS
ANY WIDTH
4' -0
" M A
X
4' -0
" M A
X
2' -3
" M A
X
4' -6
" M A
X
4' -0
" M A
X
4' -6
" M A
X
10" MAX.
ELECTRICAL AND DATA AT CASEWORK
T/DE
DN
U .O
.N
1' -6
TY
P U .O
.N
3' -8
TY
P
NURSE CALL
EQ (B) EQ (B)
E Q
(A
E Q
(A
IL
CB DS NC SA
U .O
.N
3' -8
TY
P
ELECTRICAL & TELEPHONE/DATA
T/D D
WT
T
T/D
U .O
.N
1' -6
" T Y
P
U .O
.N
3' -8
" T Y
P
U .O
.N
5' -0
" T Y
P
PHY
GF N
LS
E
DSOSVS
DOOR HARDWARE
CR KP
HO
PW
U .O
.N
3' -8
TY
P
PP
U .O
.N
6' -8
" T Y
P
FIRE ALARM & MECHANICAL EQ (B) EQ (B)
E Q
(A
E Q
(A
RPS
T
U .O
.N
3' -8
TY
P
5' -0
1'-0"
PS
S SS
TY
P
. W A
LL
M
O U
N
TE
D D
E V
IC
E
S
6' -8
" U .N
.O
TB WS
3' -6
ELECTRICAL AND DATA SPECIAL CONDITIONS
N
REF*
D N D
COPIER
N D
MEDICATION
DIPENSER
TVE D
T101, T102
TV MONITOR**
U .N
.O
7' -0
" T Y
P
U .O
.N
2' -0
" T Y
P
JB
SCONCE
7' -2
EMERGENCY
LIGHT
CLOCKS
7' -2
" U .O
.N
NOTE:
ANY ELECTRICAL AND DATA DEVICE NEXT TO A DOOR NEEDS TO BE LOCATED AT A MINIMUM OF 8" FROM DOOR FRAME.
NURSE CALL
NC NURSE CALL
IFV INTERCOM WITH VIDEO
PB PANIC BUTTON
DR DOOR RELEASE
IF INTERCOM
TELEPHONE/DATA
D DATA
DOOR HARDWARE
CR CARD READER
HO MAGNETIC HOLD OPEN
FHO MAGNETIC HOLD OPEN (LOW TO FLOOR)
PP PUSH PLATE
ELECTRICAL
N DUPLEX POWER
N QUAD POWER
LS LIGHT SWITCH
LS LIGHT SWITCH 3-GANG
JB JUNCTION BOX
FIRE ALARM
PS PULL STATION
S STROBE
SS SPEAKER AND STROBE
TB TERMINAL BOX
MECHANICAL
RPM ROOM PRESSURE MONITOR
RPS ROOM PRESSURE SENSOR
T THERMOSTAT
RPM
U .O
.N
6' -0
" T O
C E
N
TE
R O
F
TV
6"
4' -0
" M A
X
4' -6
" M A
X
AED
6"
DOOR HARDWARE FOR CARD READERS
U.O.N.
5' - 0"
U.O.N.
8' - 0"
CR
AT SINGLE
DOOR*
CR
AT DOUBLE
EGRESS DOORS*
DOOR SWING
*THIS APPLIES TO PUSH
PLATES(PP)/ACTUATORS
U.O.N.
CRCR
M A
X T
O B
U T
T O
N
IFV
* S & SS DEVICES IN CEILING IN BH LOCATIONS AS NOTED
E D
T/DN
WT LS
CONDITIONS AT WAINSCOT
U .O
.N
1' -6
" T Y
P
U .O
.N
3' -4
" T Y
P
P R
O
TE
C
TI
O N
L E
G E
N D
R E
FE
R
T O
W A
LL
P R
O T
E C
T
IO
N L
E G
E N
D R
E F
E R
T O
W A
L L
E D WT LS
N D
T104, T105
WALL
MOUNTED
COMPUTER**
M/W
N
U .O
.N
T Y
P
6"
EQ EQ
TYPICAL DIMENSION AT
MONITOR ON A COUNTER
OR DESK. THE OUTLETS
ARE SHOWN CENTERED
BY CAN SHIFT AS
REQUIRED.
FHOT
Y
P
NOTE: REFER TO MEPT DRAWINGS FOR SPECIFIC TYPES
COORDINATE
LOCATIONS W
BRACKET
O F
W A
LL
M
O N
IT
O
R
3' -8
" T O
C E
N
TE
R
2' -0
T123
DOCUMENTATION STATION
(WALL MTD)**
2' -8
" T O
B A
S E
COORDINATE OUTLET
LOCATIONS WITH CUT
SHEET
N D
7' -2
IF
D E
V
IC
E , U
.O .N
3' -8
" T O
T O
P O
F
U .O
.N
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:5
A M
A-001
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
ABBREVIATIONS, SYMBOLS, LEGENDS, NOTES
& WALL TYPE SCHEDULE 658-19-103
2025−12−30
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
Revisions: Date:
A B C D E F G H I
J K L
PHASE 1
PHASE 3
PHASE 4PHASE 2
PHASE 3
PATIENT ROOM
D-143
OFFICE
D-124
DIRTY UTILITY RM
D-142
CORRIDOR
D-147
WORK RM
D-123
MECH RM
IC-132
CORRIDOR
D-120
SEMI-RESTRICED
CORRIDOR
D-C123
CORRIDOR
D-148
TOILET
D-144
TOILET
D-145
ELECTRICAL
D-110
CLEAN LINEN
D-115
CLEAN SUPPLY
D-C133A
OR 4
D-C133
ELECTRICAL
D-C1037
EQUIPMENT
D-C131
IRM
D-C1038
OR 3
D-C130
OR 2
D-C126
OFFICE
D-C144
ANESTHESIA
WORKROOM
D-C122
OFFICE
D-C120
CLEAN CORE
D-C126D
DEMO
D-C126F
DEMO
D-C126C
DEMO
D-C126A
OR 5
D-C138
OR 6
D-C145
OR 7
D-C146
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002A
TOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
TOILET
D-142D
TOILET
D-142E
TOILET / SHOWER
D-C191
LOUNGE
D-C192
TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
PHASING NARRATIVE
PHASE 1:
DEMOLISH AREAS IN EXISTING PATIENT WING AS INDICATED TO BUILD 3 NEW OPERATING
ROOMS CORRIDORS AND PART OF CLEAN CORE. EXISTING OPERATING ROOMS AND CLEAN
CORE TO REMAIN IN OPERATION THE ENTIRE TIME. THE EXISTING LOUNGE AND
BATHROOMS ARE TO BE DEMOLISHED SO THAT THE NEW CORRIDOR CAN BE
CONSTRUCTED TO ALLOW CLEAN SUPPLIES TO REACH THE NEWLY CONSTRUCTED
OPERATING ROOMS IN PHASE 2.
PHASE 2:
AT THE BEGINGING OF THE PHASE A NEW TEMPORARY CORRIDOR FROM THE CLEAN
ELEVATOR THRU THE CLEAN CORE, TO THE NEW CORRIDOR CREATED IN PHASE 1, SHALL
BE CONSTRUCTED PRIOR TO ANY DEMOLITION. ONCE THE CORRIDOR IS COMPLETE
DEMOLISION OF EXISTING OPERATING ROOMS 2, 3, 4, 5, 6 AND REMAINING PORTIONS OF
THE CLEAN CORE CAN PROCEED. THE HYBRID OR AND THE TWO NEW OR'S BECOME
OPERATIONAL. NEW OR'S 4, 5, 6, THE REMANING CLEAN CORE, AND SUPPORT ROOMS ARE
BUILT OUT.
PHASE 3:
WORK IN EXISTING OR PREP TAKES PLACE. EXISTING PACU IS USED FOR PRE OP PREP AND
RECOVERY DURING THIS PHASE. NEW OFFICES AND STORAGE ROOM ARE BUILT OUT.
EXISTING OFFICES ARE RENOVATED.
PHASE 4:
WORK IN EXISTING PACU TAKES PLACE. NEW OR PREP AREA IS USED FOR PRE OP PREP
AND PACU DURING THIS PHASE. OFFICES ARE BUILT OUT AT THIS TIME.
GENERAL NOTES
1. SEE INDIVIDUAL ICRA PLANS,A-011 THRU A-015, FOR DETAILED PHASING DIAGRAMS AND
NOTES PER EACH PHASE.
2. ALL TEMPORARY PARTIONS SHALL BE REMOVED AT THE END OF EACH PHASE UNLESS
INDICATED THAT THEY MAY REMAIN IN PLACE AS PART OF THE PERMANENT WORK.
3. EXITING SURGICAL SOILED UTILITY ROOM PLUMBING WORK CAN BE DONE IN ANY PHASE.
COORDINATE WORK IN THE AREA WITH THE COR.
4. NEW DOOR TO MED GAS ROOM CAN BE DONE IN ANY PHASE. COORDINATE WORK WITH
COR
5. FINISHES WORK IN CORRIDOR SHALL BE COMPLETED AT THE END OF THE PHASES AND
DONE AFTER HOURS. COORDINATE WORK WITH COR.
6. CONTRACTOR TO REFER TO EACH DISCIPLINE DRAWINGS FOR COMPLETE SCOPE AND
AREA OF WORK PER PHASE.
CORRIDOR
D-C12
WAITING
D-C107
LOCKERS
D-C107A TLT
D-C107B
OFFICE
D-C16
OFFICE
D-C109
OFFICE
D-C108
OR 8
D-C106
TLT
D-C106B STORAGE
D-C106A
OFFICE
D-C108A
OFFICE
D-C109A
NURSE STATION
D-C18
OFFICE
D-C115
OFFICE
D-C124
PACU
D-C11
ISOLATION ROOM
D-C117ANTE
D-C119
DIRTY UTILITY
D-C125
EQUIP STORAGE
D-C112
BIO HZRD
D-C111
WAITING
D-C110
ANEST OFFICE
D-C116
OFFICE
D-C118
BREAK RM
D-C113
NURSE STATION
D-C12 RECOVERY
D-C13TLT
D-C114
GENERAL
STORAGE
D-C125A
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:0
A M
A-010
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
PHASING PLANS
FIRST FLOOR - OVERALL 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 FIRST FLOOR PLAN - OVERALL PHASING
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
OVERALL PHASING NOTES
1 HATCHED AREA INDICATES LOCATIONS WHERE PHASES HAVE AN OVERLAP OF WORK.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
AO
AO
AO
AO
MIN
6' - 0"
6' - 0"
TYP.
TYP.
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT ROOM
D-D110
PATIENT ROOM
D-D109
PATIENT ROOM
D-D108
PCU ROOM
D-D1001
PCU ROOM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002A
TOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED
TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT
UNDER CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION
WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE
CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.
3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL
INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.
4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT
THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION
OPERATIONS.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF
THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.
6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN
INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO
FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO
PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.
7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE
OWNER PRIOR TO COMMENCEMENT OF THE WORK.
8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING
CONSTRUCTION.
9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO
PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD
OF DUST.
11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE
NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE
OWNER TO MOVE.
12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY
UNLESS OTHERWISE NOTED.
13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL
BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF
THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY
EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.
PHASING COORDINATION
OWNER, ARCHITECT AND CONTRACTOR SHALL
REVIEW AND COORDINATE PHASING REQUIREMENTS
WHEN CONTRACT IS AWARDED.
LEGEND
CLEAN SUPPLIES
SOILED SUPPLIES
PATIENT TO SURGERY
PATIENT TO PACU
STARTING POINT
DIRECTION OF TRAVEL
CONTRACTOR
ACCESS
1 HOUR RATED
TEMPORARY
CONSTRUCTION WALL
RESTRICTED ACCESS
CORRIDOR
PHASING NOTES
1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO
PUBLIC.
2. 3/4 HR RATED DOOR AND HARDWARE.
3. VESTIBULE WITH WALK OFF MATS.
4. MAINTAIN CORRIDOR ACCESS AT ALL TIMES.
5. INSTALL DOOR AND CONTROLS DURING EVENINGS AND/OR
WEEKENDS.
6. INSTALL WALL DURING EVENINGS AND/OR WEEKENDS.
7. REMOVE AND REPLACE THIS DOOR AT THE END OF PHASE 1 AND
SEAL TIGHT AT ALL TIME DURING PHASE 1
PATIENT ROOM
D-143
OFFICE
D-124
DIRTY UTILITY RM
D-142
CORRIDOR
D-147
WORK RM
D-123
MECH RM
IC-132
CORRIDOR
D-120
SEMI-RESTRICED
CORRIDOR
D-C123
CORRIDOR
D-148
TOILET
D-144
TOILET
D-145
ELECTRICAL
D-110
CLEAN LINEN
D-115
CLEAN SUPPLY
D-C133A
OR 4
D-C133
ELECTRICAL
D-C1037
EQUIPMENT
D-C131
IRM
D-C1038
OR 3
D-C130
OR 2
D-C126
OFFICE
D-C144
ANESTHESIA
WORKROOM
D-C122
OFFICE
D-C120
CLEAN CORE
D-C126D
DEMO
D-C126F
DEMO
D-C126C
DEMO
D-C126A
OR 5
D-C138
OR 6
D-C145
OR 7
D-C146
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
TOILET
D-142D
TOILET
D-142E
TOILET / SHOWER
D-C191
LOUNGE
D-C192
TOILET
D-C193
TOILET
D-C194
OR 8
D-D1050
TOILET
D-C106B
STORAGE
D-C106A
OFFICE
D-C109A
OFFICE
D-C109
ISOLATION ROOM
D-C117
ANTE
D-C119
OFFICE
D-C118
ANEST OFFICE
D-C116
OFFICE
D-C115
BREAK RM
D-C113
RECOVERY
D-C13A
STORAGE
D-C112
GENERAL STOR
D-C125A
DIRTY UTILITIY
D-C125
OFFICE
D-C124 BIOHAZARD
D-C111
WAITING ROOM
D-C110
NURSE STATION
DC-12
PACU
DC-11
OFFICE
D-C108
OFFICE
D-C108A
TOILET
D-C114
PATIENT ROOM
D-140
PATIENT ROOM
D-139
PATIENT ROOM
D-138
PATIENT ROOM
D-137
NURSE STATION
D-121
MEDS
D-134
STAFF WORK
D-130
CORRIDOR
D-146
OFFICE
D-125
CLEAN SUPPLY
D-126
PATIENT ROOM
D-133
PATIENT ROOM
D-132
STAFF LOUNGE
D-129
HSK
D-131
STAFF TLT
D-128
ISOLATION ANTE
D-136
NIGHT CALL
D-122
EQUIP. STORAGE
D-127
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:1
A M
A-011
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
ICRA PLAN
FIRST FLOOR - PHASE 1 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR PLAN - PHASE 1
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
CR
CR
6' - 0"
TYP.
TYP.
2 3
TYP.
9' - 10"
CONTROL ROOM
1D-124
HYBRID OR
1D-123
OR-2
1D-125
OR-3 ROBOTIC
1D-126
SCRUB
STRETCHER
ALCOVE
STRETCHER
ALCOVE
SCRUB
CLEAN CORE
1C-120
STRETCHER
ALCOVE
CORRIDOR
C1-19
IT
1D-120
PUMP ROOM
1D-122
EQUIPMENT
1D-121
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED
TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT
UNDER CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION
WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE
CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.
3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL
INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.
4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT
THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION
OPERATIONS.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF
THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.
6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN
INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO
FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO
PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.
7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE
OWNER PRIOR TO COMMENCEMENT OF THE WORK.
8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING
CONSTRUCTION.
9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO
PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD
OF DUST.
11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE
NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE
OWNER TO MOVE.
12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY
UNLESS OTHERWISE NOTED.
13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL
BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF
THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY
EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.
PHASING COORDINATION
OWNER, ARCHITECT AND CONTRACTOR SHALL
REVIEW AND COORDINATE PHASING REQUIREMENTS
WHEN CONTRACT IS AWARDED.
LEGEND
CLEAN SUPPLIES
SOILED SUPPLIES
PATIENT TO SURGERY
PATIENT TO PACU
STARTING POINT
DIRECTION OF TRAVEL
CONTRACTOR
ACCESS
1 HOUR RATED
TEMPORARY
CONSTRUCTION WALL
RESTRICTED ACCESS
CORRIDOR
PHASING NOTES
1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO
PUBLIC.
2. 3/4 HR RATED DOOR AND HARDWARE.
3. VESTIBULE WITH WALK OFF MATS.
4. INSTALL THIS DOOR PRIOR TO PHASE 2.
MECH RM
IC-132
CLEAN SUPPLY
D-C133A
OR 4
D-C133
ELECTRICAL
D-C1037
EQUIPMENT
D-C131
IRM
D-C1038
OR 3
D-C130
OR 2
D-C126
OFFICE
D-C144
ANESTHESIA
WORKROOM
D-C122
OFFICE
D-C120
CLEAN CORE
D-C126D
DEMO
D-C126F
DEMO
D-C126C
DEMO
D-C126A
OR 5
D-C138
OR 6
D-C145
OR 7
D-C146
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002A
TOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
TOILET
D-142D
TOILET / SHOWER
D-C191
LOUNGE
D-C192
TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
OR 8
D-D1050
TOILET
D-C106B
STORAGE
D-C106A
OFFICE
D-C109A
OFFICE
D-C109
ISOLATION ROOM
D-C117
ANTE
D-C119
OFFICE
D-C118
ANEST OFFICE
D-C116
OFFICE
D-C115
BREAK RM
D-C113
RECOVERY
D-C13A
STORAGE
D-C112
GENERAL STOR
D-C125A
DIRTY UTILITIY
D-C125
OFFICE
D-C124 BIOHAZARD
D-C111
WAITING ROOM
D-C110
NURSE STATION
DC-12
PACU
DC-11
OFFICE
D-C108
OFFICE
D-C108A
TOILET
D-C114
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:3
A M
A-012
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
ICRA PLAN
FIRST FLOOR - PHASE 2 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR PLAN - PHASE 2
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
CR
SL
CR
CR
CR
CR
AO
TYP.
TYP.
CLEAN CORE
1C-120
CORRIDOR
C1-24
SOILED
IC-1016 GAS
IC-1017
OR-6
1C-130
OR-7
1C-129
CONTROL ROOM
1D-124
HYBRID OR
1D-123
OR-2
1D-125
OR-3 ROBOTIC
1D-126
IT
1D-120
PUMP ROOM
1D-122
EQUIPMENT
1D-121
EQUIPMENT
STORAGE
1C-131
OR-4 ROBOTIC
1C-128
OR-5
1C-126
ORTHO STOR
C1-18
ANESTHESIA
WORKROOM
1C-127
HAC
1C-122
LINEN ALCOVE
1C-123
ELECTRICAL
1C-1037
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED
TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT
UNDER CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION
WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE
CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.
3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL
INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.
4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT
THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION
OPERATIONS.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF
THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.
6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN
INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO
FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO
PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.
7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE
OWNER PRIOR TO COMMENCEMENT OF THE WORK.
8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING
CONSTRUCTION.
9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO
PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD
OF DUST.
11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE
NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE
OWNER TO MOVE.
12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY
UNLESS OTHERWISE NOTED.
13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL
BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF
THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY
EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.
PHASING COORDINATION
OWNER, ARCHITECT AND CONTRACTOR SHALL
REVIEW AND COORDINATE PHASING REQUIREMENTS
WHEN CONTRACT IS AWARDED.
LEGEND
CLEAN SUPPLIES
SOILED SUPPLIES
PATIENT TO SURGERY
PATIENT TO PACU
STARTING POINT
DIRECTION OF TRAVEL
CONTRACTOR
ACCESS
1 HOUR RATED
TEMPORARY
CONSTRUCTION WALL
RESTRICTED ACCESS
CORRIDOR
PHASING NOTES
1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO
PUBLIC.
2. 3/4 HR RATED DOOR AND HARDWARE.
3. VESTIBULE WITH WALK OFF MATS.
4. REMOVE DOOR AND INFILL THE OPENING AFTER HOURS OR ON
WEEKEND.
5. TEMPORARY PARTITIONS MAY BECOME PERMANENT WALLS AT THE
END OF PHASE.
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002A
TOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
LOUNGE
D-C192
TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
OR 8
D-D1050
TOILET
D-C106B
STORAGE
D-C106A
OFFICE
D-C109A
OFFICE
D-C109
ISOLATION ROOM
D-C117
ANTE
D-C119
OFFICE
D-C118
ANEST OFFICE
D-C116
OFFICE
D-C115
BREAK RM
D-C113
RECOVERY
D-C13A
STORAGE
D-C112
GENERAL STOR
D-C125A
DIRTY UTILITIY
D-C125
OFFICE
D-C124 BIOHAZARD
D-C111
WAITING ROOM
D-C110
NURSE STATION
DC-12
PACU
DC-11
OFFICE
D-C108
OFFICE
D-C108A
TOILET
D-C114
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:4
A M
A-013
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
ICRA PLAN
FIRST FLOOR - PHASE 3 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 ICRA -FIRST FLOOR PLAN - PHASE 3
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
CR
CR
AO
AO
CR
AO
SL
CR
AO
CR
CR
CR
CR
AO
AO
CR
AO
TYP.
TYP.
SCRUB
SCRUB
SCRUB
OR-4 ROBOTIC
1C-128 OR-5
1C-131
ORTHO STOR
1C-132
ANESTHESIA
WORKROOM
1C-133
HAC
1C-134
LINEN ALCOVE
1C-135
ELECTRICAL
1C-1037
CLEAN CORE
1C-120
OR-1 HYBRID OR
1D-123
OR-2
1D-125
OR-3 ROBOTIC
1D-126
CONTROL ROOM
1D-124
SOILED
IC-1016 GAS
IC-1017
EQUIPMENT
STORAGE
1C-136
OR-6
1C-130
OR-7
1C-129
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED
TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT
UNDER CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION
WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE
CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING WEEKENDS, AND/OR DURING EVENINGS.
3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL
INTERRUPTIONS IN SERVICES REQUIRED BY THIS PROJECT.
4. THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT
THE CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION
OPERATIONS.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF
THE CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.
6. TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN
INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO
FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO
PROVIDE. DOORS SHALL BE PROVIDED IN PARTITIONS AS REQUIRED BY THE OWNER.
7. WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE
OWNER PRIOR TO COMMENCEMENT OF THE WORK.
8. THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING
CONSTRUCTION.
9. THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO
PREVENT THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
10. ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD
OF DUST.
11. EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE
NEXT PHASE. CONTRACTOR SHALL ALLOW SEVEN (7) DAYS BETWEEN PHASES TO ALLOW THE
OWNER TO MOVE.
12. ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY
UNLESS OTHERWISE NOTED.
13. ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL
BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF
THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY
EXISTING CONDITIONS TO DETERMINE SCOPE OF THIS WORK.
PHASING COORDINATION
OWNER, ARCHITECT AND CONTRACTOR SHALL
REVIEW AND COORDINATE PHASING REQUIREMENTS
WHEN CONTRACT IS AWARDED.
LEGEND
CLEAN SUPPLIES
SOILED SUPPLIES
PATIENT TO SURGERY
PATIENT TO PACU
STARTING POINT
DIRECTION OF TRAVEL
CONTRACTOR
ACCESS
1 HOUR RATED
TEMPORARY
CONSTRUCTION WALL
RESTRICTED ACCESS
CORRIDOR
PHASING NOTES
1. 1 HR RATED TEMPORARY PARTITION. FINISH SIDE EXPOSED TO
PUBLIC.
2. 3/4 HR RATED DOOR AND HARDWARE.
3. VESTIBULE WITH WALK OFF MATS.
4. PRIOR TO INSTALL ICRA WALL, REMOVE WALL AND DOOR COMPLETE.
WORK IN THIS AREA SHALL BE PERFORMED AFTER HOURS OR ON
WEEKENDS.
5. TEMPORARY PARTITIONS MAY BECOME PERMANENT WALLS AT THE
END OF PHASE.
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002A
TOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
LOUNGE
D-C192
TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
ISOLATION ROOM
D-C117
ANTE
D-C119
OFFICE
D-C118
ANEST OFFICE
D-C116
OFFICE
D-C115
BREAK RM
D-C113
RECOVERY
D-C13A
STORAGE
D-C112
GENERAL STOR
D-C125A
DIRTY UTILITIY
D-C125
OFFICE
D-C124 BIOHAZARD
D-C111
WAITING ROOM
D-C110
NURSE STATION
DC-12
PACU
DC-11
TOILET
D-C114
OFFICE
D-C190
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:0
A M
A-014
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
ICRA PLAN
FIRST FLOOR - PHASE 4 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 ICRA - FIRST FLOOR DEMOLITION PLAN - PHASE 4
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
J K L
SERVICE BAY
BD-123
SERVICE BAY
D-123A
STAIR
NO-7
TRANSFORMER
ROOM 2
BD-122
SWITCHBOARD
D-122A
DISPATCH AREA
D-117B
STORAGE
BD-117A
STERILE
BD-117C
HAC
BD-112
ST. PREP ROOM
BD-103A
CART WASH
BD-104
EQ. GAS CYL
STOR
BD-110
HAC
BD-105
EQUIP WASH
BD-106
TOILET
BD-116A
TOILET
BD-115A
LOCKERS
BD-116
CORRIDOR
BD-156
LOUNGE
BD-113
ELEV / MACHINE
BD-109
COMPUTER
BD-114A
LOCKERS
BD-115
CLERICAL
BD-114
CORRIDOR
CB-30
CHIEF
BD-114C
STERILE PACK
ROOM
BD-108
TOILET
BD-107A
SHOWER-M
BD-107
SHWR/LKR-F
BD-102A
TOILET
D-102
BATT RECHARGE
BD-101
ELEC
BD-100
CORRECT. THER
BC-113
EQUIP, STOR
BC-112
CLINIC ADMIN
BC-111
HUBBARD TANKS
BC-107A
SPEC.
TREATMENT
BC109
EQUIP STOR
D-181
TLT
BC-114
TELE
BC-110
EXAM
BC-115
BEDROOM
D-185
OCCUP. THERAPY
BC-116
TOILET
BC-117B
TLT
BC-118
SPLINTING
BC-120
CLINIC
D-190
CORRIDOR
CB-32
TREATMENT
BC-101A
PHYS THERAPY
BC-101
PHYS THERAPY
BC-104
EQUIP STOR
BC-106
TLT
BC-107
TLT
BC-103
DRESS
BC-103A
STAIR
NO-1
CORRIDOR
CB-24
STORAGE
D-202
CORRIDOR
CB-27OFFICE
BD-111
HALLWAY
CB-34
EQUIP. STORAGE
AND TEST
BD-117
CART DRY
IC-125
DECONTAMINATION
ROOM
BD-103
KITCHEN
BC-117
ELEC
BC-108
UTILITY
BC-102
HAC
BC-100
CORRIDOR
CB-35A
CHIEF
BD-114B
ENGINEER -
CONTRACTOR
CENTER
BD-124
TYP.
ARM & LEG
WHRLP
BD-107B
A.F.F.
GWB
7' - 10"
A.F.F.
TME
8' - 0"
AE500
TYP.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:0
A M
AD100
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
DEMOLITION PLAN
BASEMENT 658-19-103
2025−12−30
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
SCALE: 3/32" = 1'-0"1 BASEMENT CEILING DEMOLITION AND NEW WORK PLAN
GENERAL DEMOLITION NOTES
1 DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT.
ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A
DECISION.
2 THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
3 THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING
BUT NOT LIMITED TO PLUMBING, MECHANICAL, AND ELECTRICAL WORK.
4 THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW
FINISHES.
5 THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
6 IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON
THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
7 WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE
AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
8 ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE
OWNER.
9 ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY, UNLESS OTHERWISE NOTED. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
10 ALL NOTES, REMARKS, AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY, UNLESS OTHERWISE NOTED.
11 ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
12 EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY BY THE CONTRACTOR FOR NEW FINISHES PER THE FINISH SCHEDULE.
13 WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH
CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
14 THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
15 THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING
BUT NOT LIMITED TO PLUMBING, MECHANICAL, AND ELECTRICAL WORK.
16 THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC., AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE PAINTED OR
COVERED WITH WALL COVERING.
17 ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT, UNLESS OTHERWISE NOTED.
18 THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
19 THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW
FINISHES.
20 IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON
THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
21 WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE
AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
22 ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE
OWNER.
23 ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY, UNLESS OTHERWISE NOTED. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
24 ALL NOTES, REMARKS, AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY, UNLESS OTHERWISE NOTED.
25 ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
26 EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY BY THE CONTRACTOR FOR NEW FINISHES PER THE FINISH SCHEDULE.
27 THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC., AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE PAINTED OR
COVERED WITH WALL COVERING.
28 ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT, UNLESS OTHERWISE NOTED.
29 THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION WITH THE OWNER. MATERIALS AND EQUIPMENT TO BE MOVED INTO AND OUT OF THE CONSTRUCTION AREA PRIOR TO 8:00 AM, OR DURING EVENINGS AND/OR WEEKENDS.
DEMOLITION NOTES - BASEMENT CEILING
1 HATCHED AREA INDICATES APPROXIMATE AREA OF PLUMBING WORK ABOVE, REFER TO NEW WORK PLAN AND PLUMBING DRAWINGS. REWORK CEILING AS REQUIRED TO ACCOMMODATE NEW WORK. COORDINATE WITH COR FOR AREA ACCESS AND PERMITED WORK TIMES. CONTRACTOR IS
RESPONSIBLE FOR TEMPORARY ICRA BARRIERS FOR ISOLATED WORK AREAS.
2 HATCHED AREA INDICATES APPROXIMATE AREA OF STRUCTURAL WORK ABOVE, REFER TO NEW WORK PLAN AND STRUCTURAL DRAWINGS.
REWORK CEILING AS REQUIRED TO ACCOMMODATE NEW WORK. COORDINATE WITH COR FOR AREA ACCESS AND PERMITED WORK TIMES.
CONTRACTOR IS RESPONSIBLE FOR TEMPORARY ICRA BARRIERS FOR ISOLATED WORK AREAS.
3 PROVIDE ICRA BARRIER.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
J K L
OR-2
1D-125
OR-3 ROBOTIC
1D-126
OR-4 ROBOTIC
1C-128
ORTHO STOR
1C-125
OR-6
1C-130
CYLINDER
STORAGE
1C-143
SOILED
1C-142
CORRIDOR
C1-18
CORRIDOR
C1-19
CORRIDOR
C1-16
OFFICE
1C-155
OFFICE
1C-154
OFFICE
1C-153
OFFICE
1C-152
EXIST. WAITING
1C-150
SOILED
1C-119
CLEAN
1C-118
LOUNGE
1C-114A
ISOLATION
1C-116
NURSE STATION
1C-115A
EQUIPMENT
1C-111
MEDS
1C-113
PRE-OP
1C-105
HAC
1C-108
TOILET
1C-114B
CORRIDOR
C1-14
STORAGE
1C-110
ANTE
1C-117
EQUIPMENT
STORAGE
1C-136
CORRIDOR
C1-17
CONTROL ROOM
1D-124
IT
1D-120
EQUIPMENT
1D-121
PUMP
1D-122
OR-1 HYBRID
1D-123
NURSE
1C-105A
COMM CTR
1C-106
PACU
1C-115
EQUIPMENT
ALCOVE
TOILET
1C-109
STAIR
S-8
STORAGE
1C-124
OR-7
1C-129
HAC
1C-122
LINEN ALCOVE
1C-123
CORRIDOR
C1-9
CLEAN CORE
1C-120
ANESTHESIA
WORKROOM
1C-127
CORRIDOR
C1-15
CORRIDOR
C1-3
CORRIDOR
C1-12
CORRIDOR
C1-13
OR-5 ORTHO
1C-131
OFFICE
1C-151
CORRIDOR
C1-11
CORRIDOR
C1-10
LOCKERS
1C-114C
LINEN CLOSET
1C-107
NURSE/ COMM
CENTER
1C-156
C -1
.2
D
-1
D
-1 A
D
-1
C
-1
1D-123B
D
-1 B
D
-1 B
D
-1 A
D
-1 A
D
-1 A
D
-1 A
D
-1 B
S -8
C
-1 B
C
-1 A
C
-1 A
C
-1 A
C -9
A
1C-127G
C
-1 B
C
-1 B
C
-1
1C-122
C -1
1C-127J
C
-1 A
C
-1 A
1C-131
C
-1 B
C
-1 B
1C-120B
C -1
1C-127C
C1-9B
C
-1 B
C
-1
1C-105A
1C-127F
1C-107
1C-105B
1C-113
1C-108
C
-1 C
1C-109
1C-114C 1C-111A
1C-115A
1C-110
C
-1 B
C
-1
C
-1 B
1C-117A
C
-1
1C-115B
C
-1
C
-1
C
-1
C
-1
C
-1
C
-1
OFFICE
1C-157
PATIENT RM
PATIENT RM
PATIENT RM
PATIENT RM
NURSE
STATION
CLEAN
MED
HTM
ELECTSOILED
HOLDING
IRM
RECOVERY
CCLO
NOURISH
PCU LOUNGE
/ LOCKERS
WORK ROOM
PCU
EQUIPMENT
PCU OFFICE
PCU OFFICE
GROUP
OFFICE
HSK
IRM
DEC
OFFICE
OFFICE
OFFICE
LOGISTICS
TLT
PCU
ROOM
PCU
ANTE
STORAGE
HSK
E L
E C
T R
IC
A
L
C L
O S
E T
PATIENT RM PATIENT RM PATIENT RM
C -1
.1
C
-1
NOT IN
ARCHITECTURAL
SCOPE
NOT IN
ARCHITECTURAL
SCOPE
A
AE500
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:2
A M
AE100
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
NEW WORK PLAN
FIRST FLOOR - OVERALL 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 OVERALL NEW WORK PLAN - FIRST FLOOR
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
OVERALL NEW WORK PLAN
IS FOR REFERENCE ONLY.
SEE ENLARGED NEW WORK
PLANS FOR DETAILED
INFORMATION
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
J K L
1D-125
1D-126
1C-128
1C-125
C1-16
1C-142
1C-143
C1-18
C1-19
1C-115
1C-105
1C-111
1C-113
1C-116
1C-114A
1C-118
1C-117
1C-114B
1C-106
1C-109
1C-110
1C-1541C-155 1C-153 1C-152 1C-150
1C-119
C1-15
1D-120
1D-121
1D-122
1D-123
1D-124
1C-112
1C-108
1C-115A
1C-105A
1C-114C
1C-131
1C-122
1C-123
C1-10
C1-9
1C-124
1C-107
C1-12
C1-11
1C-130
1C-129
1C-120 1C-120
C1-11
1C-127
NOT IN
ARCHITECTURAL
SCOPE
1C-151 1C-156
1C-157
1C-120
1C-136
C1-17
NOT IN
ARCHITECTURAL
SCOPE
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASING LEGEND
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:3
A M
AC100
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP MAT / SKC
BID DOCUMENTS
FULLY SPRINKLERED
REFLECTED CEILING PLAN
FIRST FLOOR - OVERALL 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 OVERALL REFLECTED CEILING PLAN - FIRST FLOOR
BUILDING 143
KEY PLAN
PLAN
NORTH
PHASE 2
PHASE 1
PHASE 3
PHASE 3
PHASE 4
ACTUAL
NORTH
NOT IN SCOPE
NOT IN SCOPE
OVERALL REFLECTED CEILING
PLAN IS FOR REFERENCE
ONLY. SEE ENLARGED
REFLECTED CEILING PLANS
FOR DETAILED INFORMATION
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
OL
CR
CR
CR
AO
SL
CR
AO
OL OL OL
CR
AO
SL
OL
CR
CR
CR
CR
AO
A B C D E F G H I
J K L
OR-1 HYBRID
1D-123
RES-1
RES-1 (A)
SC-1/ RWC-1
OR-2
1D-125
RES-1
RES-1 (A)
SC-1/ RWC-1
OR-3 ROBOTIC
1D-126
RES-1
RES-1 (A)
SC-1/ RWC-1
CONTROL ROOM
1D-124
RES-1
RES-1
SC-1
CORRIDOR
C1-9
RB-1
LVT-1 (A)
P-1
PUMP
1D-122
RES-1
RES-1
SC-1, RWC-1
EQUIPMENT
1D-121
RES-1
RES-1
SC-1, RWC-1
IT
1D-120
RB-1
WSF-1
P-1
CLEAN CORE
1C-120
RES-1
RES-1
SC-1, RWC-1
CORRIDOR
C1-19
RB-1
LVT-1 (A)
P-1, WP-A
CORRIDOR
C1-18
RB-1
LVT-1 (A)
P-1, WP-A
OR-4 ROBOTIC
1C-128
RES-1
RES-1 (A)
SC-1/ RWC-1
ANESTHESIA
WORKROOM
1C-127
RES-1
RES-1
SC-1
OR-5 ORTHO
1C-131
RES-1
RES-1 (A)
SC-1/ RWC-1
CLEAN CORE
1C-120
RES-1
RES-1
SC-1, RWC-1
STORAGE
1C-124
WSF-1
WSF-1
P-1, RWC-1
OFFICE
1C-157
RB-1
LVT-1
P-1 (A)
NURSE/ COMM
CENTER
1C-156
RB-1
LVT-1
P-1
OFFICE
1C-155
RB-1
LVT-1
P-1 (A)
OFFICE
1C-154
RB-1
LVT-1
P-1 (A)
OFFICE
1C-153
RB-1
LVT-1
P-1 (A)
OFFICE
1C-152
RB-1
LVT-1
P-1 (A)
OFFICE
1C-151
RB-1
LVT-1
P-1 (A)
EXIST. WAITING
1C-150
RB-1
LVT-1
P-3
CORRIDOR
C1-10
RB-1
LVT-1 (A)
P-1
LINEN ALCOVE
1C-123
RB-1
LVT-3
P-1
HAC
1C-122
RES-1
RES-1
SC-1, PT-1
ORTHO STOR
1C-125
RES-1
RES-1
SC-1, RWC-1
EXIST IT
1C-121
ETR
ETR
ETR
CLEAN
1C-118
RB-1
WSF-1
SC-1. RWC-1
SOILED
1C-119
WSF-1
WSF-1
SC-1, RWC-1
PACU
1C-115
RB-1
WSF-1 (A)
SC-1 (A)
NURSE STATION
1C-115A
RB-1
WSF-3
SC-1 (A)
ANTE
1C-117
RB-1
WSF-1
SC-1
ISOLATION
1C-116
RB-1
WSF-2
SC-1 (A)
TOILET
1C-114B
CTB-1
CT-3
SC-1, CT-1, CT-2
LOUNGE
1C-114A
RB-1
LVT-2
P-1 (A)
EQUIPMENT
ALCOVE
1C-112
WSF-1
WFS-1
SC-2, RWC-3
CORRIDOR
C1-12
RB-1
LVT-1 (A)
P-1
COMM CTR
1C-106
RB-1
WSF-1
SC-1 (A)
LINEN CLOSET
1C-107
RB-1
WSF-1
P-1, RWC-1
MEDS
1C-113
WSF-1
WSF-1
SC-1
HAC
1C-108
RES-1
RES-1
SC-1, RWC-1
EQUIPMENT
1C-111
RB-1
WSF-1
SC-1, RWC-1
NURSE
1C-105A
RB-1
WSF-1
SC-1 (A)
PRE-OP
1C-105
RB-1
WSF-1 (A)
SC-1, RWC-2
TOILET
1C-109
CTB-1
CT-3
SC-1, CT-1, CT-2
CORRIDOR
C1-3
ETR
ETR
ETR
STORAGE
1C-110
RB-1
WSF-2
SC-1, RWC-1
EQUIPMENT
STORAGE
1C-136
WSF-1
WSF-1
RES-W2,RWC-1
CORRIDOR
C1-17
RB-1
LVT-1 (A)
P-1
OR-6
1C-130
RES-1
RES-1
SC-1/ RWC-1
OR-7
1C-129
RES-1
RES-1
SC-1/ RWC-1
OR-7
1C-129
RES-1
RES-1
SC-1/ RWC-1
CORRIDOR
C1-16
RB-1
LVT-1 (A)
P-1
SOILED
1C-142
ETR
ETR
ETR
CYLINDER
STORAGE
1C-143
ETR
ETR
ETR
CORRIDOR
C1-13
RB-1
WSF-1
RES-W2,RWC-1
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD PF&A DESIGN, P.C.
REGISTERED ARCHITECTCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
one eighth inch = one foot one quarter inch = one foot three eigths inch = one foot one half inch = one foot three quarter inch = one foot
6" 0 one inch = one foot
6" 0 one and one half inch = one foot
6" 0 three inch = one foot
6"
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
ARCHITECTURAL
M-R PROJECT NO:0499-0136
Jon Manninen, COR
VA Drawing Number
Project Number
Fire Protection:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:4
A M
AI100
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
2025-12-30 DJP HLJ
BID DOCUMENTS
FULLY SPRINKLERED
FINISH PLAN
FIRST FLOOR - OVERALL 658-19-103
2025−12−30
SCALE: 1/8" = 1'-0"1 OVERALL FINISH PLAN - FIRST FLOOR
OVERALL FINISH PLAN IS
FOR REFERENCE ONLY.
SEE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .