36C24625Q0933.docx
DOCX document 97 KB Posted
- Attached to
- J063--Lenel Software Update for the Salem VAMC
- Solicitation number
- 36C24625Q0933
About this file
This is a Request for Quote (RFQ) for a Lenel Software Update at the Salem VA Medical Center. The solicitation (36C24625Q0933) is issued by the Department of Veterans Affairs Network Contracting Office 6, seeking a software upgrade for the existing LENEL OnGuard Access Control System. The contract is set aside for small businesses, with a size standard of $25 Million under NAICS code 561621.
The Performance Work Statement outlines a comprehensive software update project with key objectives including updating to the latest stable software version, maintaining system integrity, and improving security and performance. The contract includes three primary line items: a Lenel SUSP Support Plan for 257-512 Readers, an HID PIV Check Support Registration Engine Maintenance & Support Annual Subscription, and 80 hours of labor for implementation and troubleshooting. The base period of performance is from 08-18-2025 to 08-17-2026, with a total project duration not to exceed 60 calendar days. Quotes are due by 07-29-2025 at 2 PM EDT, with an anticipated award date of 07-22-2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24625Q0933 0004.docx | DOCX document | |
| 36C24625Q0933 0003.docx | DOCX document | |
| 36C24625Q0933 0002.docx | DOCX document | |
| 36C24625Q0933 0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24625Q0933
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C24625Q0933 07-22-2025 Emily Donahue 757-315-3983 07-29-2025
2PM
EDT
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 X X 561621 $25 Million N/A X Salem VA Medical Center 1970 Roanoke Boulevard Salem
VA
24153 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667
Department of Veterans Affairs Financial Services Center
PO BOX 149971
Austin
TX
78714-9971 512-460-5049 512-460-5221 X See CONTINUATION Page Lenel Software Update for the Salem VA Medical Center located in Salem, VA.
See CONTINUATION Page X X Emily Donahue Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| B.3 PERFORMANCE WORK STATEMENT | 5 |
| SECTION C - CONTRACT CLAUSES | 11 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 11 |
| C.2 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 11 |
| C.3 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 13 |
| C.4 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025) | 13 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 22 |
| D.1 WAGE DETERMINATION | 22 |
| D.2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) | 23 |
| SECTION E - SOLICITATION PROVISIONS | 33 |
| E.1 INSTRUCTION TO OFFERORS | 33 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 37 |
| E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 37 |
| E.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 40 |
| E.5 52.216-1 TYPE OF CONTRACT (APR 1984) | 41 |
| E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) (DEVIATION FEB 2025) | 42 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C246 Emily Donahue
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly in Arrears |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
VA Financial Service Center (FSC) Electronic Invoice Presentment and Payment System https://www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 5.00 |
| EA |
| __________________ |
| __________________ |
Lenel SUSP Support Plan PRO SUSP Plan - Tier 2; 257-512 Readers.
Covers PRO/PROI Systems.
Contract Period: Base POP Begin: 08-18-2025 POP End: 08-17-2026 PRINCIPAL NAICS CODE: 561621 - Security Systems Services (except Locksmiths) PRODUCT/SERVICE CODE: J063 - Maintenance, Repair, and Rebuilding of Equipment - Alarm, Signal, and Security Detection Systems
| 6.00 |
| EA |
| __________________ |
| __________________ |
HID PIV Check Support Registration Engine Maintenance & Support Annual Subscription Service.
Contract Period: Base POP Begin: 08-18-2025 POP End: 08-17-2026
PRODUCT/SERVICE CODE: J063 - Maintenance, Repair, and Rebuilding of Equipment - Alarm, Signal, and Security Detection Systems
| 80.00 |
| HR |
| __________________ |
| __________________ |
Labor to implement upgraded versions of software, troubleshoot PIV Enrollment Issues, Attempt to remedy day to day system nuisances. Not to Exceed 80 hours. Does not include defective hardware or battery replacement.
Contract Period: Base POP Begin: 08-18-2025 POP End: 08-17-2026
PRODUCT/SERVICE CODE: J063 - Maintenance, Repair, and Rebuilding of Equipment - Alarm, Signal, and Security Detection Systems
| GRAND TOTAL |
| __________________ |
Page 1 of Page 1 of
B.3 PERFORMANCE WORK STATEMENT
1. Introduction
This Performance Work Statement (PWS) outlines the requirements and expectations for providing a software update for the LENEL Access Control System at the Salem Veterans Affairs Medical Center (VAMC) located at 1970 Roanoke Boulevard, Salem, Virginia 24153. The objective is to update the existing LENEL OnGuard Access Control System to the latest available software version to ensure enhanced security, system reliability, and compliance with industry standards.
2. Scope of Work
The contractor shall provide all necessary labor, materials, equipment, software, and technical support to update the LENEL Access Control System at the Salem VAMC to the latest software version. This includes system assessment, software installation, configuration, testing, user training, and post-installation support.
2.1 Location of Work:
Salem Veterans Affairs Medical Center 1970 Roanoke Boulevard, Salem, Virginia 24153
2.2 System Details
a. Current System: LENEL OnGuard Access Control System
b. Existing Hardware and Software Compatibility: The Contractor shall assess the compatibility of the new software with the existing infrastructure.
c. Number of Access Control Points: Approximately [Insert number of doors/readers]
3. Objectives
The primary objectives of this project are to:
a. Ensure the LENEL OnGuard Access Control System is updated to the latest stable software version.
b. Maintain system integrity and functionality during and after the update process.
c. Improve security, performance, and system responsiveness.
d. Provide staff training on new features and changes.
4. Specific Tasks
4.1 Pre-Installation Assessment
a. Conduct a full system assessment to evaluate the current hardware and software configuration.
b. Identify any hardware or firmware upgrades required to support the new software version.
c. Verify system backups are performed and stored securely prior to the upgrade.
d. Develop an implementation plan and risk mitigation strategy.
4.2 Software Update Installation
a. Download and install the latest LENEL OnGuard software version.
b. Perform necessary hardware and firmware updates to ensure compatibility.
c. Migrate existing configurations and user data to the updated platform.
d. Ensure integration with existing security infrastructure, including cameras, alarms, and badge readers.
4.3 Testing and Validation
Conduct full system testing, including:
a) Door access control functionality
b) Badge reader response and authentication
c) Alarm triggering and notification
d) System communication with servers and client workstations
e) Identify and resolve any post-installation issues.
f) Ensure the system operates without disruptions or security vulnerabilities.
4.4 Training and Documentation
a. Provide training to Salem VAMC personnel on new features and system modifications.
b. Deliver system documentation, including:
c. Updated software and system configuration details
d. Troubleshooting guide
e. User manuals and quick reference guides
4.5 Post-Installation Support
a. Provide 30 days of post-installation support to address issues and ensure system stability.
b. Ensure remote and on-site technical support availability during this period.
5. Deliverables
The contractor shall provide the following deliverables:
| Deliverable |
| Description |
| Due Date |
| Pre-Installation Report |
| System assessment and upgrade plan |
| Within 10 business days of award |
| Software installation |
| Complete installation and configuration of the new software |
| Within 30 business days of award |
| System Testing Report |
| Results of functionality and integration tests |
| Within 5 business days of installation |
| Training Completion Report |
| Summary of training sessions and attendee sign-in sheets |
| Within 5 business days of training |
| Final Project Report |
| Summary of work performed, including post-installation status |
| Within 10 business days of project completion |
6. Period of Performance
a. The total period of performance for this project shall not exceed 60 calendar days from the date of contract award.
b. Any schedule adjustments shall be coordinated with and approved by the Contracting Officer’s Representative (COR).
7. Place of Performance
All work will be performed on-site at the Salem Veterans Affairs Medical Center, located at 1970 Roanoke Boulevard, Salem, Virginia 24153
8. Government-Furnished Equipment (GFE)
a. The government will provide access to the existing LENEL OnGuard system and any necessary documentation.
b. The contractor is responsible for safeguarding all government-furnished equipment and information.
9. Security and Access Requirements
a. All contractor personnel must comply with VA security protocols and requirements.
b. Background checks are required for all contractor personnel working on-site.
c. The contractor shall coordinate with the Salem VAMC Veterans Affairs Police for access to secured areas.
10. Performance Requirements
The contractor shall ensure that:
a. The system update does not disrupt hospital operations.
b. All access control points remain functional post-update.
c. The updated system meets or exceeds all manufacturer specifications and VA security requirements.
11. Quality Assurance and Acceptance
a. The contractor shall submit a Quality Assurance Plan (QAP) outlining testing and validation procedures.
b. The COR will evaluate all deliverables for accuracy, completeness, and compliance with contract requirements.
c. Final acceptance will be based on successful system testing, operational functionality, and user satisfaction.
12. Compliance and Standards
a. The contractor shall comply with all applicable VA policies, federal regulations, and LENEL manufacturer guidelines.
b. All work shall adhere to the latest National Institute of Standards and Technology (NIST) guidelines for cybersecurity and access control.
13. Warranty
a. The contractor shall provide a 12-month warranty on all software updates and configuration changes.
b. Any issues related to the update during this period shall be corrected at no additional cost to the government.
14. Invoicing and Payment
a. The contractor shall submit invoices in accordance with VA invoicing guidelines.
b. Payment will be processed upon completion and acceptance of all deliverables.
15. Additional Considerations
a. The contractor shall provide a detailed project schedule within 10 business days of contract award.
b. Any delays or issues must be reported to the COR immediately.
c. The contractor shall ensure that all work complies with Occupational Safety and Health Administration (OSHA) standards.
End of Performance Work Statement
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS |
| NOV 2023 |
| 52.204-9 |
| PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL |
| JAN 2011 |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| OCT 2018 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| AUG 2020 |
| 52.222-42 |
| STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES |
| MAY 2014 |
| 852.203-70 |
| COMMERCIAL ADVERTISING |
| MAY 2018 |
| 852.204-70 |
| PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL |
| MAY 2020 |
| 852.215-70 |
| SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (DEVIATION) |
| JAN 2023 |
| 852.215-71 |
| EVALUATION FACTOR COMMITMENTS |
| OCT 2019 |
C.2 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001;
(2) Designated agency office means the office designated by the purchase order, agreement, or contract to first receive and review invoices. This office can be contractually designated as the receiving entity. This office may be different from the office issuing the payment;
(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests;
(4) Invoice payment has the meaning given in FAR 32.001; and
(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:
(1) VA’s Electronic Invoice Presentment and Payment System at the current website address provided in the contract.
(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI).
(d) Invoice requirements. Invoices shall comply with FAR 32.905.
(e) Exceptions. If, based on one of the circumstances in this paragraph (e), the Contracting Officer directs that payment requests be made by mail, the Contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for—
(1) Awards made to foreign vendors for work performed outside the United States;
(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;
(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;
(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or
(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.
(End of Clause)
C.3 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
The Contracting Officer reserves the right to designate an Administrative Contracting Officer (ACO) for the purpose of performing certain tasks/duties in the administration of the contract. Such designation will be in writing through an ACO Letter of Delegation and will identify the responsibilities and limitations of the ACO. A copy of the ACO Letter of Delegation will be furnished to the Contractor.
(End of Clause) (End of Addendum to 52.212-4)
C.4 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115–91).
(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232–40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[] (4) 52.203–17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
[X] (5) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (6) [Reserved] [] (7) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[] (8) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[X] (9) 52.204–27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117–328).
[] (10) 52.204–28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115–390, title II).
[X] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) (Pub. L. 115–390, title II).
[] (ii) Alternate I (DEC 2023) of 52.204–30.
[X] (12) 52.209–6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).
[] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
[] (14) [Reserved] [] (15) 52.219–3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).
[] (16) 52.219–4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[] (17) [Reserved] [X] (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020) of 52.219-6.
[] (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020) of 52.219-7.
[] (20) 52.219-8, Utilization of Small Business Concerns (JAN 2025) (15 U.S.C. 637(d)(2) and (3)).
[] (21)(i) 52.219–9, Small Business Subcontracting Plan (JAN 2025) (15 U.S.C. 637(d)(4)).
[] (ii) Alternate I (NOV 2016) of 52.219-9.
[] (iii) Alternate II (NOV 2016) of 52.219-9.
[] (iv) Alternate III (JAN 2025) of 52.219–9.
[] (v) Alternate IV (JAN 2025) of 52.219–9.
[] (22)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
[] (ii) Alternate I (MAR 2020) of 52.219-13.
[] (23) 52.219–14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).
[] (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
[] (25) 52.219–27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).
[X] (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).
[] (ii) Alternate I (MAR 2020) of 52.219–28.
[] (27) 52.219–29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
[] (28) 52.219–30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
[] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
[] (30) 52.219–33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 637(a)(17)).
[X] (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
[] (32) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2025) (E.O. 13126).
[] (33) [Reserved] [] (34) [Reserved] [] (35)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
[] (ii) Alternate I (JUL 2014) of 52.222-35.
[X] (36)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
[] (ii) Alternate I (JUL 2014) of 52.222-36.
[] (37) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
[] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[] (40) 52.222-54, Employment Eligibility Verification (JAN 2025). (E.O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
[] (41)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) (42 U.S.C. 7671, et seq.).
[] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) (42 U.S.C. 7671, et seq.).
[] (44) 52.223-20, Aerosols. (MAY 2024) (42 U.S.C. 7671, et seq.).
[] (45) 52.223-21, Foams (MAY 2024). (42 U.S.C. 7671, et seq.).
[X] (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671I).
[] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
[] (ii) Alternate I (JAN 2017) of 52.224-3.
[] (48)(i) 52.225-1, Buy American—Supplies (OCT 2022) (41 U.S.C. chapter 83).
[] (ii) Alternate I (OCT 2022) of 52.225-1.
[] (49)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (NOV 2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
[] (ii) Alternate I [Reserved].
[] (iii) Alternate II (JAN 2025) of 52.225-3.
[] (iv) Alternate III (FEB 2024) of 52.225-3.
[] (v) Alternate IV (OCT 2022) of 52.225-3.
[] (50) 52.225–5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note [X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[] (52) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
[] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).
[] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).
[X] (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) (E.O. 13513) [X] (56) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).
[] (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
[] (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
[X] (59) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).
[] (60) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
[] (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
[] (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[X] (63) 52.240–1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act—Covered Foreign Entities (NOV 2024) (Sections 1821–1826, Pub. L. 118–31, 41 U.S.C. 3901 note prec.).
[] (64) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
[] (65)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
[] (ii) Alternate I (APR 2003) of 52.247-64.
[] (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[X] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
[X] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
| Employee Class |
| Monetary Wage-Fringe Benefits |
[] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
[] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).
[] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).
[X] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).
[X] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
[] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
[] (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (JAN 2025) (49 U.S.C. 40118(g)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
(ii) 52.203–17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712).
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iv) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115–91).
(v) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).
(vi) 52.204–27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117–328).
(vii) (A) 52.204–30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) (Pub. L. 115–390, title II).
(B) Alternate I (DEC 2023) of 52.204–30.
(viii) 52.219–8, Utilization of Small Business Concerns (JAN 2025) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219–8 in lower tier subcontracts that offer subcontracting opportunities.
(ix) [Reserved]
(x) [Reserved]
(xi) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(xii) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(xiii) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
(xvi)(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).
(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).
(xix) 52.222-54, Employment Eligibility Verification (JAN 2025) (E.O. 12989).
(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).
(xxi) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
(xxii)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xxiii) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226–6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxv) 52.232–40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232–40.
(xxvi) 52.240–1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act—Covered Foreign Entities (NOV 2024) (Sections 1821–1826, Pub. L. 118–31, 41 U.S.C.3901 note prec.).
(xxvii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of Clause)
Page 1 of
Page 1 of
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
D.1 WAGE DETERMINATION
Attachment A. Service Contract Labor Standards Wage Determination No. 2015-4315, Revision No. 30, Date of Last Revision: 7/8/2025 is hereby incorporated (attached) into this solicitation.
D.2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Emily Donahue Organization or Agency: Network Contracting Office 6
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: TBD
Organization or Agency: Salem Veteran Affairs Medical Center
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary: TBD Quality Assurance Surveillance Plan (QASP)
Page 24 of 59 version 0003 Dated 11/6/2014
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS
The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards (Inclusion of any monetary incentives requires approval through the Department’s Senior Procurement Executive (SPE) – there will be no monetary incentives.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: Action required via daily reporting.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. Customer complaint data will be obtained via Customer feedback and will be compiled weekly and reviewed by Service Chief. Any validated complaints against the Contractor which are not resolved within seven business days will be further investigated.
d. RANDOM SAMPLING. Patient treatment files will be quarterly randomly and or periodically selected for review. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
e. Verification and/or documentation provided by Contractor. Contractor provided documentation will be reviewed via required daily action reporting.
| Measures |
| PWS |
Reference Performance Requirement
| Standard |
| Acceptable Quality Level |
| Surveillance |
Method Met AQL/DID NOT MEET AQL- CPAR Rating / Add Comments
| 1- Updates |
| Pg. 1 |
| Ensure the LENEL OnGuard Access Control System is updated to the latest stable software version. |
| latest stable software version. |
| 100% |
Direct Observation, periodic inspection, and validated user/customer complaints
| 2 – Functionality |
| Pg. 1 |
| Maintain system integrity and functionality during and after the update process. |
| 100% |
| Direct Observation, periodic inspection, and validated user/customer complaints |
| 3 – Training |
| Pg. 2 |
| Provide staff training on new features and changes. |
| 100% |
| Direct Observation, periodic inspection, and validated user/customer complaints |
The table below is a sample that can be tailored – note that the table must identify where in the PWS the standards are found for monitoring performance. Check the MSO Customer Resource Center for approved mandatory QASPs.
7. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
| MARGINAL: | |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. | |
| Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the | contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter). |
| UNSATISFACTORY: | |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. | |
| Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or | Environmental Deficiency Reports, or letters). |
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.
CONTRACT DISCREPANCY REPORT
| 1. CONTRACT NUMBER |
| 2. REPORT NUMBER FOR THIS DISCREPANCY |
| 3. TO: (Contracting Officer) |
| 4. FROM: (Name of COR) |
5. DATES
a. CDR PREPARED
| b. RETURNED BY CONTRACTOR: |
| c. ACTION COMPLETE |
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
| 7. SIGNATURE OF COR |
| Date: |
| 8. SIGNATURE OF CONTRACTING OFFICER |
| Date: |
| 9a. TO (Contracting Officer) |
| 9a. FROM (Contractor) |
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
| 11. SIGNATURE OF CONTRACTOR REPRESENTATIVE |
| Date: |
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
| NAME |
| TITLE |
| SIGNATURE |
| DATE |
CONTRACTOR NOTIFIED
COR
CONTRACTING OFFICER
9. FREQUENCY OF MEASUREMENT
| a. | Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed. |
| b. | Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance. |
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
SECTION E - SOLICITATION PROVISIONS
E.1 INSTRUCTION TO OFFERORS
Note that FAR Part 13 Simplified Acquisitions Procedures will be used. This authorizes the use of simplified procedures for the acquisition of supplies and services including options, if the contracting officer…
This is the start of the file's text. The full file is on GovTribe.