This document is an amendment to a solicitation for a window replacement project at Building 509 of the Richmond VA Medical Center. The key details are:
The purpose of this amendment is to extend the due date for offers to November 4, 2024 at 3:00 PM EST, provide responses to Requests for Information (RFIs), and include updated drawings, photos, and a revised Statement of Work (SOW). The SOW describes the requirements for the contractor to provide personnel, equipment, materials, and services to complete the window replacement, including sealing frames, cleaning/preparing frames, and removing/replacing 25 existing window panels. The contractor must follow all applicable VA specifications, regulations, and safety requirements. The work must be scheduled to minimize disruption to the 3D Print Lab operations, and the contractor will be responsible for maintaining a clean, dust-free work area. The government will provide an estimate of material quantities, but the contractor is responsible for verifying measurements and providing all required materials to complete the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 509 Window Replacement Sign-in Sheet 36C24624Q1207.docx | DOCX document | |
| 509 Window Replacement Photos 36C24624Q1207.docx | DOCX document | |
| UPDATED Bldg 509 FLOOR PLAN - LEVEL 2-Model.pdf | ||
| UPDATED Bldg 509 FLOOR PLAN - LEVEL 1-Model.pdf | ||
| P09 SOW.docx | DOCX document | |
| P07 Wage Determination.pdf | ||
| Renovate Bldg 509 3D Printing Lab_ARCH-Sheet - AE102 - FLOOR PLAN - LEVEL 2-Model.pdf | ||
| Renovate Bldg 509 3D Printing Lab_ARCH-Sheet - AE101 - FLOOR PLAN - LEVEL 1-Model.pdf | ||
| 36C24624Q1207_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 652-24-200 36C246 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 36C246 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24624Q1207
X X HOUR & DATE for Receipt of Offers is EXTENDED to: Monday, November 4,2024 by 3:00PM
EST
The purpose of this amendment is to do the following:
1. To extend the due date to November 4, 3PM EST.
2. To answer RFI’s.
3. To provide the Revised SOW.
4. To provide the update drawings to include measurements.
5. To provide photos of the windows.
6. To provide Sign-in Sheet
Madeline Lucena-Pulst Contracting Officer The purpose of this amendment is to do the following:
1. To extend the due date to November 4, 2024 3PM EST.
1. To answer RFI’s.
1. To provide the Revised SOW.
1. To provide the update drawings to include measurements.
1. To provide photos of the windows.
1. To provide Sign-in Sheet
RFI
1. Does the end user require Low-e Tinted Glass or Window Film? If they want window film, we would require Elevations and not just floor plans. If they can provide quantity and sizes (width by height of each pane) that would work too.
0. Low E would be preferred but a quote for both would be acceptable.
0. Attached are the windows and sizes of windows, again these sizes are approximate and should be verified by the contractor, 25 windows in all.
1. Is a tripartite escrow agreement acceptable if the cost of the job were to be over the threshold?
1. In accordance with FAR Part 28.101-2(b) for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives.
1. Work placed on which floor?
2. 1st and 2nd floor front and back of building as shown in the attachment.
1. Contractor asked about indication of water damage in the rear windows.
3. COR did not see any at this time.
1. The Customer expressed concerns with humidity getting in the lab during performance of window replacement.
4. Contractor should be prepared to mitigate exposure to humidity to prevent damage to lab equipment.
SCOPE OF WORK
Project Name – Building 509 Window Replacement Project # 652-24-200
Project Introduction:
The window replacement project in building 509 is designed to meet the needs of Veteran Patients receiving care and providers in the 3D print Lab. The construction requirements of this project include but may not be limited to the following- sealing of window frames, clean/prep window frames, with the removal and replacement of 25 existing window panels to meet the services specific needs. The contractor shall provide all personnel, equipment, tools, material, transportation, supervision, and related services necessary to complete the tasks and functions as defined within this scope and all included drawings/specifications for the windows in Building 509 in the 3D Print Lab Building Area at the Richmond VA Medical Center.
The Contractor shall complete the window replacement within the Richmond VA facility in accordance with the SOW, drawings, VA Specifications, and any other documents that have been provided. The Contractor shall manage and perform construction services with a recorded quality assurance surveillance plan as further defined in this contract to include, but not limited to, permitting, demolition, construction, construction management, submittals, fixtures, equipment, scheduling, inspection, testing, environmental protection, record (As-Built) drawings, and project closeout. The efficient management of the Contract, the submission of accurate, on time, and quality contract deliverables, as well as timely identification and solution of impediments to successful project execution. Technical requirements include, but are not limited to, early involvement in the process to allow for the development of the most cost-effective and technically sound approach or solution that conforms to the requirements of the specifications. Construction boundaries during windowpane replacement including installation required for building 509 The 3D Print Lab precautions must be made for personnel/equipment safety and care IAW ICRA requirements in designated spaces. The Richmond Engineering Projects Section will rely on the contractor’s expertise in recognizing and addressing problematic issues and successful execution of this Contract.
Inspections, set up, and construction services to be scheduled IAW service availability (weekend/off peak/after-hours work may be required and must be anticipated by the Contractor during RFI process/proposals). Due to the nature of the spaces located adjacent or near to the construction area- the phasing of the project must be accomplished following ICRA guidelines. Construction to follow all guidelines and applicable regulations for local, state, federal, and Veterans Administration, as well as IAW the phasing listed below (from the SOW).
Description of Procedure/Phasing:
· Secure each work area- Construction area to be contained as tightly and clean as possible during entirety of construction (this is a sensitive hospital location and must remain clean and dust free) IAW provided ICRA.
· Complete windowpanes/panels with seals- removal and replacement as spaces are available and approved through contractor schedule, inspect clean and prep existing frames, seal windows inside and out as directed, and restore entire construction area to full working condition.
· Contractor to conduct final inspections IAW approved (Quality Assurance Surveillance Plan) QASP- stating criteria and all safety requirements that is to be followed and verified for Quality assurance prior to Hospital acceptance/inspection.
Project Division/Work Group Breakdown Clarification/Highlighting:
· Special Requirements to include- None.
· General Requirements to include- Project Supervision, Project Management, Warranty Period work, Dumpster if required, and basic admin work of General Contractor.
· Existing Conditions to include- Frame inspection and preparation.
· Construction services to include- functions as listed in SOW detailed description.
· Equipment to include- Personnel lifts as required.
· 3rd party Services to include- None.
· Earthwork to include- ground surface restoration if manlift is utilized.
· Storage and Transportation to include- None.
· IT/Communications to include- None.
· Finishes and furnishings to include-interior painters caulking, color matched exterior caulking.
· Specialty construction to include- double panes, vacuum sealed, insulated, tinted windowpanes.
· Mechanical impacts to include- None.
Overview of General Requirements Items: The Building 509 window replacement project design materials to be provided by the contractor must include but are not limited to the following items:
| Line |
| Qty |
| Part Spec/Size |
| Description |
| 1 |
| 25 |
| Approximate measurements are included on the following attachments. |
· UPDATED Bldg 509 FLOOR PLAN - LEVEL 1- Model
· UPDATED Bldg 509 FLOOR PLAN - LEVEL 2-Model Low-E, double paned, sealed, insulated, tinted windowpanes with appropriately sized and function seals
| 2 |
| 13 |
| 10 oz containers |
| Color matched high durability silicone caulking for exterior use (clear must be approved through submittal process if color match is unavailable) |
| 3 |
| 13 |
| 10 oz containers |
| White painters’ silicone caulking for interior use (mildew resistant) |
*These are approximate measurements and are for solicitation purposes only, the contractor that gets awarded should still take their own measurements.
SOW provided materials list is only the estimated amount of material to be used (estimated by VA as the minimum requirement). The Contractor must provide all materials required to complete project, as the technical expert in the trade. The amount of material used from the list must be tracked by the Contractor (verified by COR) to ensure that they have been exhausted and upon contract completion all unused material made available to the VA as part of the contract.
Overview of Completion Time:
All rooms cannot be taken out of service during the work week (Monday – Friday 0700-1700) at the same time, installation can happen after hours or weekends with all areas inside restored to service by 5am for each workday. If Construction must be performed after hours or weekends, COR needs a minimum of (2) weeks’ notice, Contractor must have request included in schedule, and service must approve prior to official scheduling. All work is to be scheduled through COR- contractor to schedule over no more than 45 days from issuance of notice to proceed to include all lead times. Contractor must inform the CO and COR immediately if lead times impact scheduled completion within 45 days.
Overview of Additional notes:
Contract Notes:
· During construction services the Contractor must respond with onsite personnel within (4) hours for any incomplete project process, or maintenance that can affect patient care services, safety, or other VA required guidelines (as identified by the COR) from issuance of Notice to Proceed until contract completion. After project acceptance the Contractor must respond with onsite personnel within (24) hours for any issues arising during warranty period.
· All contractors are required to be safety trained by VA Safety department prior to commencement of work. In addition to Supervisory requirements of OSHA 30 Hour Certificates, all other Contractors are also required to minimally have an OSHA 10 Hour certificate within the last two years.
· The Contractor shall comply with all applicable VA Master Construction Specifications, Technical Information Library (TIL), and all other applicable standards/regulations. In the event of conflicting criteria, the Contractor shall notify the CO and COR to seek guidance.
· Contractors shall not use conflicts between guidance, interpretation of the guidance and order of precedence as a basis for a later request for equitable adjustment.
· Contractor Parking is allowed in hospital general parking lots only for all POV vehicles, only company vehicles are allowed in fenced area behind the hospital and must be clearly marked on the outside of the vehicle as to what company it is assigned. Any POV vehicles in the rear of the hospital may be ticketed or towed at the owner’s expense.
· Contractor shall field verify all measurements, material quantities, and site conditions prior commencing work.
· Provide submittals and (1) sample for all finish materials depicting actual texture for approval.
· Contractor shall provide a hard copy of each submittal with a separate transmittal sheet to each requirement. If applicable, submittals shall indicate the manufacturer’s full range of available colors, and from these, the COR will request a full-size sample for final color selection. Once submittals are approved the contractor is responsible for promptly purchasing all materials particularly finishes that do not expire (IE paint, or other time sensitive consumables that would be purchased closer to the date of use).
· If during the project performance or after completion it is found that any item does not meet the VA specifications and there was no variance approval from the VA- the Contractor shall correct at no additional cost or time to the Government even if a submittal was “approved”.
Safety Notes:
· Contractor is responsible for maintaining building life safety standards prescribed through an Interim Life Safety Measure, risk assessment permit for requirements issued prior to any work beginning.
· Contractor is responsible for dust control during construction and while transporting within the medical center.
· Contractor shall coordinate with COR for waste removal. All waste including lead shall be removed at the end of each day. Contractor shall remove and dispose of waste in accordance with all legal and VA Specification 01 74 19 Construction Waste Management.
· Contractor shall ensure all construction barriers are maintained in a clean and safe manner in all areas of the Hospital.
· All barriers at the Richmond VA shall be rigid and sealed with a neutral color- manufactured panel or primer/sealer paint, that can be cleaned (no VOC applied after hours only IAW space availability), joints or openings to be sealed with approved fire rated tape on all walls as well as covered with anti-microbial tape in patient care areas to maintain life safety and Infection control throughout entirety of construction. If not specified in Contract or through RFI process all walls will be considered in a Patient Care area.
· Contractor shall comply with Infection Control Risk Assessment permit requirements issued prior to any work beginning, always including any precautions for current worldwide infection controls such as negative air in construction areas.
· All contractors shall complete safety training with Richmond VAMC Safety team prior to work beginning. Contractor must comply with all requirements of VA Specification 01 35 26 Safety Requirements.
Construction/start up Notes:
· Contractor shall store all materials offsite and only bring materials to be installed the same day to the project site. Contractor shall coordinate delivery, storage, and handling of all materials with the COR to designated prepared areas to minimize site storage time, impact to the hospital, and potential damage to stored materials, unless project has a specified lay down area.
· Contractor shall protect all existing equipment, utilities, structures, etc. to remain. If any damage is noticed prior to starting work that may be misconstrued as damage caused by the contractor, the COR shall be notified immediately, and the damage documented (pictures taken with date as evidence and emailed to the COR/CO immediately) as existing prior to beginning demolition. After the space is turned over for construction, the contractor will be responsible for repairing all damage within the construction site.
· Contractor is responsible for removing, storing, and reinstalling any wall mounted items.
· When verifying all field measurements pertaining to the construction sites the contractor is to ensure strength/viability of all construction materials used per material function, quantities required, existing as well as provided material specifications, and existing site conditions prior to submitting a commencing work. Verifying from COR with In-House shops for access/use to any and all required services present currently in the VA.
· Contractor shall identify to COR any utility, equipment or other previously existing material not listed herein that needs to be moved to accomplish job scope, and Contractor shall remove then reinstall in new VA approved location (within 20’ of original location).
· Contractor is responsible to leave no boundaries exposed after receiving permits for and making penetrations (i.e. interstitial must be fire blocked, open wall installed boxes to be covered, core drilling should be adequately concreted for seal etc).
· Contractor is responsible to coordinate with the COR (VA Safety) and complete all operations for testing/abatement of any hazardous materials that can be identified within the construction boundaries to include providing their own 3rd party (IH) Industrial Hygienist.
· Contractor shall set up meetings with Contracting Officer, Contracting Specialist, Contracting Officer Representative, and applicable Contractor personnel monthly until construction begins then will be weekly after that. Contractor is to record minutes of each meeting and send out along with their weekly updates to Contracting Officer and COR no later than each and every Tuesday morning at 8:00am until contract completion.
Contract close out Notes:
· Contractor shall perform a pre-final inspection before requesting the final inspection with the COR and include time in their work plan for inspections and to repair any defective work after the final inspection has been made.
· Contractor shall turnover all unused materials listed in table to the VA Engineering Department.
· SOW provided materials list is only the estimated amount of material to be used (estimated by VA to help ensure that Contractors have an expected starting point for estimation), Contractor must provide them as well as any additional materials required to complete project. The amount of material used from the list must be tracked by the Contractor (verified by COR) to ensure that they have been exhausted and all unused material made available to the VA as part of the contract.
Regulations and standards that may be applicable to the work in this Contract include but are not limited to federal, state, local statutes/regulations; Department of Veteran Affairs instructions, manuals, handbooks, regulations, guidance, and policy letters National Association of Corrosions Engineers (NACE); National Fire Protection Association (NFPA); Steel Structures and Painting Counsel (SSPC); National Electrical Code (NEC); and International Building Code (IBC), including all changes and amendments in effect on the date of issuance of this Contract.
General Requirements/Specifications This section sets forth the general requirements for the Contractor. Contractor and any subcontractor shall possess applicable licensures prior to award of the Contract in order to meet the requirements to perform construction works identified in this Contract, Annexes and its subsequent attachments.
The Contractor shall comply with all applicable VA Master Construction Specifications, Technical Information Library (TIL), and all other applicable standards/regulations.
· In the event of conflicting criteria, the Contractor shall notify the CO and seek guidance.
The contractor shall be required to perform the requirements contained in any of the Contract attachments, drawings, specifications, exhibits and other documents.
The contractor shall follow order of precedence as established in the basic contract clauses 52.215-8, Order of Precedence, and 52.236-21, Specifications and Drawings for Construction, and its Alternate I.
Regulations and standards that may be applicable to the work in this Contract include but are not limited to federal, state, local statutes/regulations; Department of Veteran Affairs instructions, manuals, handbooks, regulations, guidance, and policy letters; National Fire Protection Association (NFPA); National Electrical Code (NEC); and International Building Code (IBC), including all changes and amendments in effect on the date of issuance of this Contract.
Focused Master Construction Specifications: MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) - Office of Construction & Facilities Management (va.gov)
· (PG-18-1) Division 01 (Focus 32-16.16, 35-26, and 45-00) General Requirements
· (PG-18-1) Division 08 (Focus 31-13, 71-00) Doors and Windows
· (PG-18-1) Division 09 (Focus 06-00, 22-16, 65-13, 65-16, 91-00, 94-19) Finishes
ATTACHMENTS
See attached document: UPDATED Bldg 509 FLOOR PLAN - LEVEL 1-Model.
See attached document: UPDATED Bldg 509 FLOOR PLAN - LEVEL 2-Model.
See attached document: 509 Window Replacement Photos 36C24624Q1207.
See attached document: 509 Window Replacement Sign-in Sheet 36C24624Q1207.