This document contains questions and answers regarding a federal contract opportunity for HVAC duct cleaning services at the Richmond VAMC. The opportunity involves cleaning ductwork located in various building floors and interstitial spaces totaling over 2 million square feet. Required supplies including replacement duct doors and sealant are specified. The conditioned space totals nearly 1.2 million square feet across five floors and a basement. Drawings of the HVAC system and ductwork can be provided prior to the bid due date. Information provided includes the height of the atrium area and that most HVAC units are located in mechanical spaces while ductwork runs through interstitial levels. The related solicitation is for opportunity number 36C24623Q0962 to provide duct cleaning services in Building 500.

View the file

Other files

File Type Posted
36C24623Q0962 0003.docx DOCX document
AHU List.pdf PDF
36C24623Q0962 0002.docx DOCX document
36C24623Q0962 0001.docx DOCX document
Richmond VAMC HVAC Duct Cleaning Questions 1.pdf PDF
36C24623Q0962_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Can you please provide the square footage of the building and/or prints?

Basement: 188,566.66 SF Floor 1: 483937.22 SF Floor 1 Interstitial: 483937.22 SF Floor 2: 263,203.88 SF Floor 2 Interstitial: 263,203.88 SF Floor 3: 93334.96 SF Floor 3 Interstitial: 93334.96 SF Floor 4: 73569.44 SF Floor 4 Interstitial: 73569.44 SF Floor 5: 64256.68 SF Floor 5 Interstitial: 64256.68 SF Total: 2,145,171.02 SF

1. What are the specs for needed supplies like replacement Duct doors and caulking?

There are some access panels that screws will need to be removed and those panels put back in place when they are done. Most of them have gaskets to seal air leaks, but in the event that sealant is required the following is from our HVAC specs:

1. Sealant: Elastomeric compound, gun or brush grade, maximum 25 flame spread, and 50 smoke developed (dry state) compounded specifically for sealing ductwork as recommended by the manufacturer. Generally, provide liquid sealant, with or without compatible tape, for low clearance slip joints and heavy, permanently elastic, mastic type where clearances are larger. Oil base caulking and glazing compounds are prohibited because they do not retain elasticity and bond.

2. Tape: Use only tape specifically designated by the sealant manufacturer and apply only over wet sealant. Pressure sensitive tape shall not be used on bare metal or on dry sealant.

3. Gaskets in Flanged Joints: Soft neoprene.

1. What is the square footage of the conditioned space?

Basement: 188,566.66 SF Floor 1: 483937.22 SF Floor 2: 263,203.88 SF Floor 3: 93334.96 SF Floor 4: 73569.44 SF Floor 5: 64256.68 SF Total: 1,166,868.84

1. Can HVAC drawings be provided prior to bid due date?

Provided separately.

1. Is there an equipment list that provides the Type of Duct system, CFM of each unit, Box system and where the units are floor or ceiling mounted?

Most units are in mechanical spaces and ductwork is in interstitial spaces.

1. What is the height of the atrium area?

Approximately 30’