36C24622Q0591 0002.docx
DOCX document 21 KB Posted
- Attached to
- M1DZ--EPOXY FLOORING REPLACEMENT Federal contract opportunity
- Solicitation number
- 36C24622Q0591
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24622Q0591 0001.docx | DOCX document | |
| 36C24622Q0591_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment A0002 Solicitation Question and Answers
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 2 of Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24622Q0591 06-09-2022
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
June 14, 2022 @1200 EST See CONTINUATION Page X Hunter Holmes McGuire VA Medical Center Animal Clinic Epoxy Flooring
1. Purpose of this Amendment is to provide correction to question 7.
2. Add additional questions 20 - 28.
3. See Pages 2 thru 4
Warren A Pennil Contracting Officer Animal Clinic Epoxy Flooring Hunter Holmes McGuire VA Medical Center Richmond Virginia, 23249 Amendment A0002 Solicitation 36C24622Q0591
Question 7 is amended from:
7. Q: What is the total sq ft for the job or do you want to just price per phase at 2700 sq ft per trip?
A: The total sq footage is 2700, to be broken down in 4-6 phases.
Is amended to:
Q: What is the total sq ft for the job or do you want to just price per phase at 2700 sq ft per trip?
A: 10,000 sq ft 2700 per phase
Additional question 20-28 as follow:
20. Q: Will the contractor be responsible for moving the VA’s equipment out of the phased work space?
A: No, we will move it
21. Q: If the contractor is responsible for moving the furniture, how long of a distance from the job site will the storage location be?
A: N/A
22. Q: It is imperative that we account for any possible downtime while working on the road. Will the contractor be able to work straight through from one phase to the next, or will the contractor have to wait a day or two between phases to allow the VA to move out of the area associated with the next phase? A: There will be days offs in between phases
23. Q: Non-slip shark-grit like aggregate can often be broadcasted with uniformity and sheen issues. If the VA wants slip resistance, a single broadcast of hybrid or 1/16” flake would be a better solution. Will the VA accept a Hybrid flake broadcast in lieu of the non-slip shark grit like additives?
A: Yes
24. Q: Once started Epoxy flooring installation must be continued without interruption otherwise your most recent layer of epoxy will cure and the installer will lose the chemical bond. This results in sanding the surface and more work/labor needed to create a mechanical bond the next available workday. We understand that the working hours are M-F, however, we often need a Saturday or Sunday to continue coating in order to retain the integrity of the chemical bond. The caveat is that if we are not afforded the weekend opportunity then a crew will likely not start a next phase until Monday, regardless if it becomes available on Thursday or Friday. Not being able to work a weekend will force the installer into a Monday – Thursday scenario. The POP is 31 days which is 4.3 weeks. Excluding Federal Holidays and weekends, there are only 20 workable days in July. If there are 6-7 phases with four days of work in each phase, then this project could drag on for 6-7 weeks therefore busting the 31 (20 working) day POP. Based on my calculations, we need a minimum of 24 and a maximum of 28 working days in order to accomplish this project. If we request to work over the weekend will this request be granted?
A: NO, work can only be Monday thru Friday.
25. Q: How tall in inches or feet or both, does the cove base need to be installed up the wall?
A: 4 inches
26. Q: What is the current wall substrate?
A: Block
27. If the wall is block/CMU, does the VA want the grout/course lines troweled smooth prior to the coating being applied?
A: Yes
28. Q: If the wall is sheetrock, will the VA provide a smooth finish for the contractor to install the cove base against?
A: N/A