This solicitation is for roof replacement and fascia work at various buildings at the Veterans Affairs Medical Center in Hampton, Virginia. The solicitation number is 36C24622B0011 and is seeking bids to replace roofs, fascia, soffits and gutters on multiple buildings under project number 590-18-121. Specific buildings included are 28, 31, 33, 137, 15, 140, 171, 170, 174 and 71. The work will involve removal of existing roofing materials and installation of new roof systems according to specifications. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The bid response date is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C24622B0011 0005.pdf | ||
| 36C24622B0011 0005_1.docx | DOCX document | |
| S07 Abstract of Bids 6-29-2022.pdf | ||
| 36C24622B0011 0004_1.docx | DOCX document | |
| 028333.13 Lead-based Paint.pdf | ||
| S06_36C24622B0011 0004.pdf | ||
| 028213.22 - Hazmat Survey Report.pdf | ||
| S06 36C24622B0011 0003.pdf | ||
| 36C24622B0011 0003_1.docx | DOCX document | |
| 36C24622B0011 0002_1.docx | DOCX document | |
| S04 Site Visit sign-in sheet from 5-18-2022.pdf | ||
| S05 Questions - Answers.pdf | ||
| 36C24622B0011 0001_1.docx | DOCX document | |
| S06 36C24622B0011 0001.pdf | ||
| 590-18-121 Combined Specs.pdf | ||
| 36C24622B0011_2.docx | DOCX document | |
| S02 36C24622B0011_1.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GE
NE
RA
TO
R
AC
C
AC
AC
AC AC
AC
AC
A C
AC
AC
AC
AC
AC
AC
AC
ACACAC
AC
AC
AC
AC
AC
AC
AC
AC
AC
A C
A C
A C
A C
AC
F
UP
D
E CK
S
LO PE
S L
O P
E
UP
SI D
EW A
LK
BLDG. 146
RA-B
RA-C
RA-D
RA-E
RA-F
RA-F
RA-G
RA-H
RA- I
RA- I
RA-J
RA-K
RA-L
RA-M
RA-N
RA-O
RA-P
RA-Q
RA-R
RA-S
RA-T
OPE N
RA-A
HVA C
AC
GRAVEL
G R A V E L P A R K I N G A R E A
C ONC. RAMP
NO P AR K IN G F I RE LA N E
48 " CHAIN LINK
S I G N
S I G N
S I G N
S E
W E
L L
A V E
N U
E
AVENUE
A M
E S
S T
R E
E T
S T R
E E T
K N
O X
S T R
E E
T
W O
O D
F
IN
T H
O M
P S
O N
S T
R E
E T
BLACK
FRANKLIN BOULEVARD
E M
A N
C
IP
A T
IO
N D
R
A V
E N
U E
M c C
L E
L L
A N
HARRIS
HARRIS
A V E N U
E
AVERILL AVENUE
F R
A N
K L
IN
B O
U
LE
V A R D
M A R T
IN
L. K
IN
G
JR
. B O
U
LE
V A R D
B O
U L E
V A
R D
SHORE ROAD
AVENUE
HARRIS
AVENUE
HARRIS
AVERILL AVENUE
FRANKLIN BOULEVARD
M A
R T
IN
L . K
IN
G
JR
CONTRACTOR'S STAGING AREA
MALLORY
STREET
JONES CREEK
SALVAGE YARD
G R
A V
E L
D R
I V E
W A
Y
G R
A V
E L
D R
I V E
W A
Y
G R
A V
E L
R O
A D
STORM
WATER
POND
IMPOUND LOT
FOUNDER'S
MONUMENT
AVENUE TANK
M109
AC
C
E X
IS
T
E
L E
C . V
L T
EX IS T. CONC. RAMP
EX
IST
IN
G
PA
RK
ING
L
OT
EX
IST
ING
P
AR
KIN
G
L OT
6' C.L.F.
EX
IS T
. B L D G.
F IN
.F L 6.7
F IN
.F L 6.7
EX
IS T
. B L D G.
R A-A
R A-B
R A-A
R A-B
R A-C
RA-B
RA-A
RA-C
RA-D
RA-E
RA-F
RA-
A
R A-B
RA-
E
R A-C
R A-D
RA-
F
R A-G
R A-H
RA- A
R A
-A
R A -A
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
/3
/2
:2
:0
P
M
G-001
COVER
1 3GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667
VA PROJECT #: 590-18-121 APOGEE PROJECT #: 19-111
TM
DRAWING LIST
GENERAL
G-001 COVER 1 3
G-002 GENERAL INFORMATION 2 3
G-101 PRE-CONSTRUCTION RISK ASSESSMENT - (PCRA) 3 3
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 19
AG100 SITE PLAN 2 19
AD101 BUILDING 28 & 31 ROOF DEMOLITION PLANS 3 19
AD102 BUILDING 33 ROOF DEMOLITION PLAN 4 19
AD103 BUILDING 137 ROOF DEMOLITION PLAN - A 5 19
AD104 BUILDING 137 ROOF DEMOLITION PLAN - B 6 19
AD105 BUILDING 15, 140 AND 171 ROOF DEMOLITION PLAN 7 19
AD106 BUILDING 170 AND 174 ROOF DEMOLITION PLAN 8 19
AD110 DEMOLITION PHOTOS 9 19
AD111 DEMOLITION PHOTOS 10 19
AE101 BUILDING 28 AND 31 ROOF PLAN 11 19
AE102 BUILDING 33 ROOF PLAN 12 19
AE103 BUILDING 137 ROOF PLAN - A 13 19
AE104 BUILDING 137 NEW ROOF PLAN - B 14 19
AE105 BUILDING 15,140 AND 171 NEW ROOF PLAN 15 19
AE106 BUILDING 170, 171, 174 AND 71 NEW ROOF PLANS 16 19
AE110 BUILDING 165, 192 AND 193 PLAN - PRESERVATION AND REPAINTING 17 19
AE501 ROOF DETAILS 18 19
AE502 ROOF DETAILS 19 19
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 2
E-501 ELECTRICAL DETAILS 2 2
BLDG 192
BLDG 191
BLDG 33
BLDG 31
BLDG 28
BLDG 170
BLDG 175
BLDG 15
BLDG 171
BLDG 137
137A 137B
BLDG 140
APPROVALS__________________________________________________________________
COR-ILSM & ICRA COMPLETED DATE:
REVIEW ED: AFGE DATE:
REVIEW ED: NAGE DATE:
APPROVED: INFECTION CONTROL DATE:
APPROVED: CONSTRUCTION SAFETY MANAGER DATE:
APPROVED: SAFETY MANAGER DATE:
APPROVED: CHIEF, POLICE SERVICE DATE:
APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:
APPROVED: SUPERVISORY PROJECT ENGINEER DATE:
APPROVED: ENGINEERING DIVISION MANAGER DATE:
APPROVED: CHIEF, ENVIORNMENTAL MANAGEMENT SERVICE DATE:
APPROVED: CHIEF, ENGINEERING DATE:
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DEPUTY CHIEF OF STAFF DATE:
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:
CONTRACTORS SHALL USE THE ONLINE DOCUMENT
EXCHANGE SYSTEM " SUBMITTAL EXCHANGE " FOR ALL
SUBMITTALS REQUIRED BY SPECIFICATIONS FOR THIS
PROJECT. CONTRACTOR IS RESPONSIBLE TO INCUR ALL
COSTS REQUIRED TO ALLOW FULL ACCESS AND USER
CAPABILITY FOR ALL CONTRACTORS.
W EBSITE FOR PROGRAM IS:
HTTP://W W W .SUBMITTALEXCHANGE.COM/PUBLIC/
W EBSITE REPRESENTATIVE IS :
FRANK PULEO: FRANK.PULEO@ORACLE.COM
PHONE: 610-729-3460 - 484-919-1012
WALL SECTION
SYMBOL INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
PLAN
0 4 8 16
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
:2
3:
P M
G-002
GENERAL INFORMATION
2 3GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
GENERAL SYMBOL LEGEND
S T A T E O F N E V A D A
TH
E O DO R E J O H N MO W E NJ RREGISTERED
No. 7867
A R C H I T E
C T
UTILITY / ESSENTIAL SERVICE
VIBRATIONS
NO IMPACT N/A
MINIMUM N/A
DUST (INFECTION CONTROL)/
AIR QUALITY
ALL WORK IS ON
EXTERIOR OF BUILDING
DUST NEAR HVAC INTAKES
POSSIBLE ISSUE. ASBESTOS
REMOVAL
-ALL INTAKES WILL BE
PROTECTED FROM DUST
ENTERING THE INTAKE.
-ALL ROOFS WITH ASBESTOS
OR HIGH AMOUNT OF DUST
WILL BE WET DOWN REMOVAL
BEGINS
NOISE ALL WORK IS ON EXTERIOR
OF BUILDINGS NO HEAVY
EQUIPMENT OR TOOL WILL
BE REQUIRED FOR WORK
N/A
MINIMUM N/AEQUIPMENT
CREATION OR SPREAD OF
CONTAMINANTS
ASBESTOS ABATEENT AND
LEAD BASE PAINT
ALL REQUIRMENTS FOR
REMOVAL ARE SPECIFIED
TRAFFIC FLOW - PATIENTS,
VISITORS, STAFF, CONTRACT
PERSONNEL
WORK OVERHEAD DUMPSTER
AREAS AND TRAFFIC
INTERRUPITION
REQUIREMENTS FOR
OVERHEAD PROTECTION AND
TRFFIC INTERUPTION ARE
SPECIFIED AND SHOWN ON
DRAWINGS
LIMITS OF CONSTRUCTION
BARRIER LOCATIONS
AREAS BELOW WHERE ROOF
WORK IS BEING PERFORMED
INDICATED ON DRAWINGS
EXPECTED IMPACTS PLANS/MEASURES ADDRESS
IMPACT
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
4/ 2/
2:
:1
PM
G-101
PRE-CONSTRUCTION RISK
ASSESSMENT - (PCRA)
3 3TJM GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
1D
KEVIN M. BRUN
DUST CONSTROL PLAN NOTES
INTERNAL DEMOLITION AND CONSTRUCTION
ACTIVITIES DUST AND DEBRIS CONTROL
A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS
SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE
SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM
THE CONSTRUCTIOIN AREA AND MATERIALS.
B. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL AND OUT OF THE
PROJECT - CLEAN CART SHALL BE USED; THE NOT-
SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN
ENTRY AND THE CONSTRUCTION STAGING PREP
AREA.
C. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN
CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTE. EFFORTS SHALL BE
MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED
DAILY AND AT TIMES SPECIFIED BY THE COR. IF
CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE,
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WEHN NOT IN
USE. FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AAREA. THE CONTRACTOR SHALL
NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS
WITHOUT PRIOR APPROVAL OF THE COR.
D. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE
PROTECTED TO PREVENT DAMAGE BY ADJACENT
CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
E. AIR SYSTEM FLOW: THE COR VERIFY AND
ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCUATED AIR; FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN
TO DIRTY PLACES.
F. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM
WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE, OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY COR. IF EXHAUST SHALL BE TIED INTO
A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND
HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
G. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILIING SHALL BE
VERIFIED DAILY.
H. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCUATED WITHOUT
FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THOUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
PROJECT NAME :REPLACE ROOF / FASCIA / SOFFIT / GUTTER - VARIOUS BUILDINGS
PROJECT NUMBER : 590-18-121
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
WALL TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1-
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN
THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS . SPECIFIC PRODUCTS AND DETAILS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE
DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A
COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR
ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS.
THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE
SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
13. LIGHTNING PROTECTION - CONTRACTOR SHALL DESIGN A LIGHTNING PROTECTION SYSTEM THAT MEETS VA SPECIFICATION 26 41 00 "FACILITY LIGHTNING PROTECTION" AND ALL NFPA RELATED DOCUMENTS. LIGHTNING PROTECTION SYSTEM SHALL MEET U.L. REQUIREMENTS SUCH THAT THE SYSTEM SHALL HAVE A
MASTER LABEL CERTIFICATE.
14. CONTRACTOR SHALL CONTACT THE COR A MINIMUM OF 14 DAYS PRIOR TO REQUEST ANY POWER OUTAGES REQUIRED.
15. CONTRACTOR SHALL STORE ALL HAZARDOUS MATERIAL NOT IN IMMEDIATE UE IN A SECURE LOCATION AT REMOET LAYDOWN AREA. HAZARDOUS MATERIALS
CANNOT BE STORED AT BUILDING LOCATIONS.
16. CONTRACTOR SHALL PLACE SIGNAGE AT THE ENTRANCE TO WORK AREAS WARNING PEOPLE OF ONGOING CONSTUCTION WORK. SUBMIT SAFETY SIGNAGE TO
THE MEDICAL CENTER SAFETY OFFICER FOR APPROVAL.
17. CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND DETAILING OF PROTECTIVE STRUCTURES AND LOCATIONS OF THE STRUCTURES AT BUILDING ENTRIES AND ADJACENT WALKWAYS/PATHS. LOCATIONS SHOWN ON THE ARCHITECTURAL DEMOLITION SHEETS (AD101-AD106) ARE FOR REFERENCE ONLY. FINAL PLAN FOR
LOCATIONS AND DETAILS TO BE SUBMITTED TO THE COR FOR FINAL ACCEPTANCE.
18. PROVIDE OVERHEAD PROTECTION FOR ALL ENTRANCES / EXITS / WALKWAYS, ETC. FOR A DISTANCE OF 30' FROM BUILDING. THE WALKWAY SHALL CONSIST OF PLANKING NO LESS THAN INDUSTRY STANDARD NORMAL THICKNES OF TWO INCHES, CLOSE LAID,MADE WATER TIGHT AND COVERED WITH EXTERIOR GRADE
FIRE RESISTANCE PLYWOOD
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:3
PM
AG001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
GENERAL NOTES
GE
NE
RA
TO
R
AC
C
AC
AC
AC AC
AC
AC
A C
AC
AC
AC
AC
AC
AC
AC
ACACAC
AC
AC
AC
AC
AC
AC
AC
AC
AC
A C
A C
AC
AC
AC
F
UP
DECK
SLOPE
SL
O
PE
UP
SIDEWALK
BLDG. 146
RA-B
RA-C
RA-D
RA-E
RA-F
RA-F
RA-G
RA-H
RA-I
RA-I
RA-J
RA-K
RA-L
RA-M
RA-N
RA-O
RA-P
RA-Q
RA-R
RA-S
RA-T
OPEN
RA-A
HVAC
AC
GRAVEL
GRAVEL PARKING AREA
CONC. RAMP
NO PARKING
FIRE LANE
48" CHAIN LINK
SIGN
SIGN
SIGN
SEW
ELL
AVENUE
AVENUE
AM
ES
S
TR
EE
T
ST
RE
ET
KN
OX
S
TR
EE
T
W
OO
DF
IN
TH
O
M
PS
O N
S
TR
EE
T
BLACK
FRANKLIN BOULEVARD
EM
AN
CI
PA
TI
ON
D R.
AVEN
U
E
M cC
LELLAN
HARRIS
HARRIS
AV
EN
UE
AVERILL AVENUE
FR
AN
KL
IN
BOULE
VARD
MARTIN L. KING JR. BOULEVARD
BO
ULEVARD
SHORE ROAD
AVENUE
HARRIS
AVENUE
HARRIS
AVERILL AVENUE
FRANKLIN BOULEVARD
M
ARTIN L. KING JR.
CONTRACTOR'S STAGING AREA
MALLORY
STREET
JONES CREEK
SALVAGE YARD
G R
AV
EL
D R
IV
EW
AY
G R
AV
EL
D R
IV
EW
AY
G R
AV
EL
R O
AD
STORM
WATER
POND
IMPOUND LOT
FOUNDER'S
MONUMENT
AVENUE TANK
M109
AC
C
EXIST.
ELEC
. VLT.
EXIST. CONC. RAMP
EX
IST
ING
P
AR
KIN
G
LO
T #5
EX
IST
ING
P
AR
KIN
G
LO
T #5
6' C.L.F.
EX
IST
BL
DG
FIN
.FL
6.7
FIN
.FL
6.7
EX
IST
BL
DG
RA-A
RA-B
RA-A
RA-B
RA-C
RA-B
RA-A
RA-C
RA-D
RA-E
RA-F
RA-A
RA-B
RA-E
RA-C
RA-D
RA-F
RA-G
RA-H
RA-A
R A-
A
RA-A
BLDG 192
BLDG 193
BL
D
G
BL
D
G
BLDG 170
BLDG 175
BLDG 15
BLDG 33
BLDG 171
BLDG 137D BLDG 137A
BLDG 137B
BLDG140
VALVE
HOUSE
BLDG 165
BLDG 174
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:4
PM
AG100
SITE PLAN
2 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
Scale: 1" = 100'-0"
1 SITE PLAN
A. CONTRACTOR SHALL ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURE ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING OR PATHWAYS
BELOW WHERE WORK IS BEING PERFORMED ABOVE.
SAFETY BARRIER TO INCLUDE COVERED WALKWAYS
BELOW AREAS WHERE ROOF WORK IS BEING
PERFORMED. SIGNAGE AND BARRIER TO RESTRICT
PEDESTRIAN TRAFFIC IN AREAS WHERE WORK IS
BEING PERFORMED AND ANY PROTECTIVE
MEASURES REQUIRED TO PROTECT PATIENTS,
STAFF, VISITOR OR OTHER PERSONNEL FROM THE
ROOF WORK BEING PERFORMED.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFETY DEVICES/FALL PROTECTION PER OSHA
STANDARDS.
C. CONTRACTOR SHALL PROVIDE SCAFFOLDING FOR
ROOF ACCESS AS NECESSARY TO PERFORM WORK.
FINAL LOCATION TO BE COORDINATED WITH COR.
D. CONTRACTOR SHALL ENSURE SCAFFOLDING AND
PROTECTIVE MEASURES COMPLY WITH ALL OSHA
REQUIREMENTS. CONTRACTOR SHALL BE
RESPONSIBLE FOR DESIGN AND ENGINEERING OF
SCAFFOLDING AND PROTECTIVE MEASURES.
E. CONTRACTOR SHALL BE REQUIRED TO INSPECT ALL
SCAFFOLDING AND PROTECTIVE MEASURES DAILY
TO ENSURE THEY ARE SAFE AND COMPLY WITH
OSHA REQUIREMENTS. OSHA QUALIFIED PERSON
NEEDS TO INSPECT THE SCAFFOLDING PER 29 CFR
1926. 950-459
F. CONTRACTOR SHALL REPAIR ALL AREAS DAMAGED
OR DISTURBED DURING CONSTRUCTION. THIS
INCLUDES BUILDING FINISHES, LANDSCAPING,
SIDEWALKS, PAVING OR ANY AREA DAMAGED BY
CONSTRUCTION WORK. RESTORE AREAS TO
ORIGINAL CONDITION AT NO ADDITIONAL COST TO
THE VA.
G. DUMPSTER AND TRASH CHUTE LOCATIONS ARE TO
BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE. SEE SHEETS AD101-AD106 FOR
SUGGESTED LOCATIONS OF LAY DOWN AREAS.
H. CONTRACTOR SHALL PROTECT THE LANDSCAPE
IRRIGATION SYSTEM IN THE CONSTRUCTION AREA
FROM DAMAGE. CONTRACTOR TO REPAIR ANY
DAMAGE TO IRRIGATION SYSTEM AND ADJUST ALL
HEADS AFFECTED BY CONSTRUCTION.
I. CONTRACTOR SHALL PREPARE A PLAN SHOWING
LAYDOWN AREA, SECURITY FENCE, DUMPSTER
LOCATION, SCAFFOLDING AND ACCESS FOR COR
REVIEW AND APPROVAL.
J. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING IS
LOCKED AT ALL TIMES WHEN IT IS NOT IN USE BY THE
CONTRACTOR.
01 02
01 02
01 LOCATION OF DUMPSTERS FOR ROOF DEBRIS.
DUMPSTERS TO BE LOCATED INSIDE FENCED
AREA. PROVIDE CHUTE FROM ROOF TO
DUMPSTER.
02 CONSTRUCTION LAY DOWN AREA AND DUMPSTER
LOCATION TO BE FENCED. THE FENCED AREA
WILL BE LOCKED DURING PERIOD WHEN
CONSTRUCTION IS NOT BEING CONDUCTED.
03 PROVIDE PORTABLE TRASH RECEPTACLES FOR
DEMOLITION OF SMALLER, LOW ROOF AREAS.
04 DO NOT BRING ANY EQUIPMENT OR STORE ANY
MATERIAL IN AREA INDICATED. EXISTING
UNDERGROUND CISTERN LOCATION.
01 02
'-2
41'
'-5
'-3
'-6
'-6
38'-6"
'-3
38'-6"
27'-3"
5'
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR.
I. ASBESTOS MATERIAL HAS BEEN FOUND IN BOTH
BUILDING 28 AND 31, SEE SPECIFICATION SECTION 02
82 13.21 ASBESTOS ROOF ABATEMENT AND
ATTACHED HAZARDOUS MATERIAL SURVEY REPORT.
J. LEAD BASE PAINT HAS BEEN FOUND IN BOTH
BUILDINGS 28 AND 31, SEE SPECIFICATION SECTION
02 83 33.13 LEAD BASE PAINT AND HAZARDOUS
MATERIAL SURVEY REPORT ATTACHED TO SECTION
02 82 13.21.
K. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
BUILDING 31
BUILDING 28
7600 SF
3080 SF
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:1
PM
AD101
BUILDING 28 & 31 ROOF DEMOLITION
PLANS
3 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
28 &31
TM
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING ASPHALT SHINGLE ROOF AND
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
02 REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS,
PIPES, ANTENNAS, ETC. NOT IN USE. CONFIRM
ABANDONED ITEMS WITH COR PRIOR TO REMOVAL.
03 REMOVE FLASHING NECESSARY FOR
INSTALLATION OF NEW ROOF SYSTEM.
04 EXISTING FAN EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
05 EXISTING VTR TO REMAIN. REMOVE FLASHING AS
NECESSARY FOR REROOFING.
06 REMOVE EXISTING SLATE ROOF AND MEMBRANE
INSULATION, FASTENERS SYSTEM, AND ALL PARTS
OF ROOF SYSTEM TO EXISTING SUBSTRATE.
07 REMOVE ALL ROOTED / DAMAGED FASCIA/DRIP
EDGE AROUND PERIMETER OF ROOF.
08 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING PROTECTION
AFTER REROOFING PER ELECTRICAL DRAWINGS.
09 REMOVE EXISTING VALLEY FLASHING AND
REPLACE FOR NEW ROOF.
10 LOCATION OF CONSTRUCTION FENCE WITH GATE
PER SPECIFICATION SECTION 32 31 13.
11 LOCATIONS TO ENTRY/PATHWAYS TO BUILDINGS
THAT WILL REQUIRE PROTECTION FROM ROOF
WORK ABOVE.
12 LOCATION OF CONTRACTOR LAYDOWN AREA. ALL
MATERIALS AND EQUIPMENT TO BE LOCATED
INSIDE FENCED AREA. CONTRACTOR TO LOCATION
DUMPSTERS, CHUTES, AND PORTABLE TOILETS
INSIDE THIS AREA. LOCATION AS REQUIRED FOR
WORK.
13 REMOVE EXISTING GUTTERS, DOWN SPOUTS AND
CONDUCTORS AND DISPOSE OFF SITE.
02 03
01 02 03 08
01 02 03 08
01 02 03 08
01 02 03 08 01 02 03 08
Scale: 1/8" = 1'-0"
1 BUILDING 31 ROOF DEMOLITION PLAN
Scale: 12" = 1'-0"
2 BUILDING 28 DEMOLITION PLAN 0 4 8 16
NORTH
PLAN
40'-2" 25'-8" 9' 49'-3"
12'-8"16'6'47'-8"
'-1
16'
'-3
'-3
'-6
49'-3"8'-6"
01 02
06 07 09 06 07 09
06 07 09
06 07 09
06 07 09
06 07 09 06 07 09
06 07 09
01 02
01 02 01 02
01 02
01 02
01 02
01 02
06 07 09
BUILDING 33
5820 SF
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR..
I. LEAD BASE PAINT HAS BEEN FOUND IN BUILDINGS 33,
SEE SPECIFICATION SECTION 02 83 33.13 LEAD BASE
PAINT AND HAZARDOUS MATERIAL SURVEY REPORT
ATTACHED TO SECTION 02 82 13.21.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:2
PM
AD102
BUILDING 33 ROOF DEMOLITION PLAN
4 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING STANDING SEAM METAL
ROOF.REMOVE MEMBRANE, INSULATION,
FASTENER SYSTEMS, AND ALL PARTS OF ROOF
SYSTEM TO EXISTING SUBSTRATE.
02 REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS,
PIPES, ANTENNAS, ETC. NOT IN USE. CONFIRM
ABANDONED ITEMS WITH COR PRIOR TO REMOVAL.
03 NOT USED.
04 EXISTING FAN EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
05 EXISTING VTR TO REMAIN. REMOVE FLASHING AS
NECESSARY FOR REROOFING.
06 REMOVE EXISTING GUTTER AND DOWNSPOUTS.
07 REMOVE ALL ROOTED/DAMAGED FASCIA/DRIP
EDGE AROUND PERIMETER OF ROOF.
08 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING PROTECTION
AFTER REROOFING PER ELECTRICAL DRAWINGS.
09 REMOVE AND REPLACE WOOD FASCIA, WOOD TRIM
AND DECORATIVE WOOD ITEMS. SALVAGE
DECORATIVE ITEMS TO BE USED AS TEMPLATES
FOR NEW DECORATIVE PIECES TO MATCH THE
EXISTING.
10 LOCATION OF CONSTRUCTION FENCE WITH GATE
PER SPECIFICATION SECTION 32 31 13.
11 LOCATIONS TO ENTRY/PATHWAYS TO BUILDINGS
THAT WILL REQUIRE PROTECTION FROM ROOF
WORK ABOVE.
12 LOCATION OF CONTRACTOR LAYDOWN AREA. ALL
MATERIALS AND EQUIPMENT TO BE LOCATED
INSIDE FENCED AREA. CONTRACTOR TO LOCATION
DUMPSTERS, CHUTES, AND PORTABLE TOILETS
INSIDE THIS AREA. LOCATION AS REQUIRED FOR
WORK.
13 AREA OF ROADWAY TO BE CLOSED DURING
CONSTRUCTION OF THE ROOF AREA ABOVE ONLY.
CONTRACTOR TO SUBIT PLAN OF ROAD TO BE
CLOSED AND PERIOD OF CLOSURE TO COR FOR
FINAL ACCEPTANCE. (LOCATION SHOWN FOR
REFERENCE ONLY.) CONTRACTOR IS RESPONSIBLE
FOR ALL TRAFFIC CONTROL.
14 DEDUCTIVE ALTERNATE NO.1 - STANDING SEAM
METAL ROOF SYSTEM AND ALL WORK ASSOCIATED
WITH THE REPLACEMENT OF THIS ROOF AREA
INCLUDING INSULATION, FLASHING, NEW GUTTER
SYSTEM.
Scale: 1/8" = 1'-0"
1 BUILDING 33 ROOF DEMOLITION PLAN
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E B
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E B
01 02 08
04 06
01 02 08
01 02 08
01 02 08
01 02 08
04 06
11 11
BUILDING 137A
4235 SF
DUMPSTER LOCATION
SEE SITE MAP IN SHEET AG100
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR.
I. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:2
PM
AD103
BUILDING 137 ROOF DEMOLITION PLAN
- A
5 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING SINGLE PLY ROOFING. REMOVE
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
02 REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS,
PIPES, ANTENNAS, ETC. NOT IN USE. CONFIRM
ABANDONED ITEMS WITH COR PRIOR TO REMOVAL.
03 REMOVE METAL COPING AND SALVAGE FOR
REINSTALLATION AFTER REROOFING.
04 EXISTING EXPANSION JOINT COVER TO BE
REMOVED AND SALVAGED FOR REINSTALLATION
AFTER INSTALLATION OF NEW ROOF.
05 EXISTING VTR TO REMAIN. REMOVE FLASHING AS
NECESSARY FOR REROOFING.
06 EXISTING FAN EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
07 EXISTING ROOF DRAINS. REMOVE DRAIN STRAINER
AND SALVAGE FOR REINSTALLATION AFTER
REREOOFING.
08 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING PROTECTION
AFTER REROOFING PER ELECTRICAL DRAWINGS.
09 ROOF AREA NOT IN SCOPE OF WORK OF THIS
PROJECT.
10 LOCATION OF CONSTRUCTION FENCE WITH GATE
PER SPECIFICATION SECTION 32 31 13.
11 LOCATIONS TO ENTRY/PATHWAYS TO BUILDINGS
THAT WILL REQUIRE PROTECTION FROM ROOF
WORK ABOVE.
12 LOCATION OF CONTRACTOR LAYDOWN AREA. ALL
MATERIALS AND EQUIPMENT TO BE LOCATED
INSIDE FENCED AREA. CONTRACTOR TO LOCATION
DUMPSTERS, CHUTES, AND PORTABLE TOILETS
INSIDE THIS AREA. LOCATION AS REQUIRED FOR
WORK.
13 AREA FOR DUMPSTER LOCATION DURING
DEMOLITION.
1 BUILDING 137 ROOF DEMOLITION PLAN - A
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E B
BUILDING 137
BUILDING 137C
BUILDING 137
03 10
01 02 10
11 15
100 SF
BUILDING 137D
2310 SF
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR.
I. ASBESTOS MATERIAL HAS BEEN FOUND IN BUILDING
137C, SEE SPECIFICATION SECTION 02 82 13.21
ASBESTOS ROOF ABATEMENT AND ATTACHED
HAZARDOUS MATERIAL SURVEY REPORT.
J. LEAD BASE PAINT HAS BEEN FOUND IN BUILDING
137C, SEE SPECIFICATION SECTION 02 83 33.13 LEAD
BASE PAINT AND HAZARDOUS MATERIAL SURVEY
REPORT ATTACHED TO SECTION 02 82 13.21.
K. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:3
PM
AD104
BUILDING 137 ROOF DEMOLITION PLAN
- B
6 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING SINGLE PLY ROOFING. REMOVE
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
02 REMOVE ALL ABANDONED EQUIPMENT, SUPPORTS,
PIPES, ANTENNAS, ETC. NOT IN USE. CONFIRM
ABANDONED ITEMS WITH COR PRIOR TO REMOVAL.
03 REMOVE FLASHING NECESSARY FOR
INSTALLATION OF NEW ROOF SYSTEM. REMOVE
METAL COPING AS NECESSARY TO INSTALL
FLASHING/REROOFING.
04 ROOF AREA NOT IN SCOPE OF WORK OF THIS
PROJECT.
05 EXISTING FAN EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
06 EXISTING VTR TO REMAIN. REMOVE FLASHING AS
NECESSARY FOR REROOFING.
07 EXISTING EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
08 EXISTING STACKS/PIPE TO REMAIN. REMOVE
FLASHING FOR REROOFING.
09 EXISTING ROOF DRAINS. REMOVE DRAIN STRAINER
AND SALVAGE FOR REINSTALLATION AFTER
REREOOFING.
10 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING PROTECTION
AFTER REROOFING PER ELECTRICAL DRAWINGS.
11 REMOVE EXISTING BUILTUP ROOFING, REMOVE
BALLAST, MEMBRANE, INSULATION, FASTENER
SYSTEMS, AND ALL PARTS OF ROOF SYSTEM TO
EXISTING SUBSTRATE.
12 LOCATIONS TO ENTRY/PATHWAYS TO BUILDINGS
THAT WILL REQUIRE PROTECTION FROM ROOF
WORK ABOVE.
13 FENCED AREA FOR DUMPSTER LOCATION DURING
DEMOLITION.
14 LOCATION OF CONSTRUCTION FENCE WITH GATE
PER SPECIFICATION SECTION 32 31 13.
15 USE PORTABLE DUMPSTER DURING ROOF
DEMOLITION.
1 BUILDING 137D ROOF DEMOLITION PLAN
109'-3"
'-9
'-6
'-8
6'-8"
13'
'-8
'-3
'-9
92'-2"
'-4
107'-3"
16'-8"
'-7
38'-9"
'-5
BUILDING 15
BUILDING 15
01 03 04 01 03 04
1111 15 15
12 12
04 06
07 08 07
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR.
I. ASBESTOS MATERIAL HAS BEEN FOUND IN BUILDING
15, SEE SPECIFICATION SECTION 02 82 13.21
ASBESTOS ROOF ABATEMENT AND ATTACHED
HAZARDOUS MATERIAL SURVEY REPORT.
J. LEAD BASE PAINT HAS BEEN FOUND IN BUILDINGS 15,
SEE SPECIFICATION SECTION 02 83 33.13 LEAD BASE
PAINT AND HAZARDOUS MATERIAL SURVEY REPORT
ATTACHED TO SECTION 02 82 13.21.
K. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:3
PM
AD105
BUILDING 15, 140 AND 171 ROOF
DEMOLITION PLAN
7 19GTS
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
15, 140 & 171
TM
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
01 REMOVE EXISTING ASPHALT SHINGLE ROOF AND
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
02 REMOVE FLASHING NECESSARY FOR
INSTALLATION OF NEW ROOF SYSTEM.
03 REMOVE EXISTING FASCIA/DRIP EDGE TO REMAIN
AROUND PERIMETER OR ROOF.
04 EXISTING LIGHTNING PROTECTION TO BE
REMOVED. INSTALL NEW LIGHTNING PROTECTION
AFTER REROOFING PER ELECTRICAL DRAWINGS.
05 ROOF AREA NOT IN SCOPE OF WORK OF THIS
PROJECT.
06 REMOVE EXISTING SINGLE PLY ROOFING. REMOVE
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
07 EXISTING SCUPPERS WITH COLLECTOR HEADS
AND DOWN SPOUTS TO REMAIN.
08 REMOVE EXISTING COPING CAP AND REPLACE
WITH NEW ROOFING.
09 EXISTING VTR TO REMAIN. REMOVE FLASHING AS
NECESSARY FOR REROOFING.
10 EXISTING FAN EQUIPMENT TO REMAIN. REMOVE
FLASHING AS NECESSARY FOR REROOFING.
11 REMOVE ROTTED FASCIA WOOD AND REPLACE
FOR REROOFING
12 LOCATIONS TO ENTRY/PATHWAYS TO BUILDINGS
THAT WILL REQUIRE PROTECTION FROM ROOF
WORK ABOVE.
13 FENCED AREA FOR DUMPSTER LOCATION DURING
DEMOLITION.
14 LOCATION OF CONSTRUCTION FENCE WITH GATE
PER SPECIFICATION SECTION 32 31 13.
15 USE PORTABLE DUMPSTER DURING ROOF
DEMOLITION.
Scale: 1/8" = 1'-0"
1 BUILDING 15 ROOF DEMOLITION PLAN
Scale: 1/8" = 1'-0"
2 BUILDING 140 ROOF DEMOLITION PLAN
3 BUILDING 171 ROOF DEMOLITION PLAN
36'-4"
16'
01 02
VET SHELTER PAVILION
03 04 05 06
01 02
SMOKING PAVILION
04 05 06
01 02
03 04
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE WORK IS
BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS BEING
PERFORMED AND ALL PERSONNEL WEAR PROPER
SAFE DEVICES/FALL PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN COVERS
AND PROVIDE BLOW DOWN OF DRAIN PIPES TO
ENSURE NO BLOCKAGE. DRAIN PIPING TO BE
REPLACED TO FIRST 90 DEGREE ELBOW.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON THE
PARAPET OF THE ROOF PERIMETER. NEW LIGHTNING
PROTECTION TO BE INSTALLED. SEE ELECTRICAL
DOCUMENTS FOR VA REQUIREMENTS.
E. CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS ON
ALL ROOFS INCLUDING EQUIPMENT, VTR, FANS, ETC.
NOT SPECIFICALLY INDICATED ON PLANS.
F. CONTRACTOR TO VERIFY ALL EXISTING ROOF CURBS,
PENETRATIONS, OR ANYTHING ATTACHED TO THE
ROOF MEET ROOFING MANUFACTURING MINIMUM
HEIGHT REQUIREMENTS. NOTIFY COR IMMEDIATELY
PRIOR TO STARTING WORK.
G. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
ALL ENTRIES AND ADJACENT WALKWAYS ARE
PROTECTED FROM ROOF WORK ABOVE. AREAS
INDICATED ARE FOR REFERENCE AND THE
CONTRACTOR IS REQUIRED TO SUBMIT PLANS AND
DETAILS FOR ALL REQUIRED PROTECTIVE
MEASURES.
H. CONTRACTOR SHALL DETERMINE AREA OF ROADWAY
REQUIRED TO BE CLOSED DURING CONSTRUCTION
AND SUBMIT PLAN TO COR.
I. LEAD BASE PAINT HAS BEEN FOUND IN THE VALVE
HOUSE BUILDING, SEE SPECIFICATION SECTION 02 83
33.13 LEAD BASE PAINT AND HAZARDOUS MATERIAL
SURVEY REPORT ATTACHED TO SECTION 02 82 13.21.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
TRAFFIC CONTROL.
A
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:3
PM
AD106
BUILDING 170 AND 174 ROOF
DEMOLITION PLAN
8 19Author
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
Checker
01 REMOVE EXISTING ASPHALT SHINGLE ROOF AND
MEMBRANE, INSULATION, FASTENER SYSTEMS,
AND ALL PARTS OF ROOF SYSTEM TO EXISTING
SUBSTRATE.
02 REMOVE FLASHING NECESSARY FOR
INSTALLATION OF NEW ROOF SYSTEM.
03 REMOVE EXISTING FASCIA/DRIP EDGE TO REMAIN
AROUND PERIMETER OR ROOF.
04 REMOVE ROTTED FASCIA OR RACK WOOD PIECES
AND REPLACE FOR REROOFING
05 SECURE THIS BUILDING DURING REROOFING.
06 USE PORTABLE DUMPSTER DURING ROOF
DEMOLITION.
07 CONTRACTOR SHALL NOT BRING ANY EQUIPMENT
OVER THIS DESIGNATED AREA. EXISTING
UNDERGROUND CISTERN.Scale: 1/8" = 1'-0"
1 BUILDING 170 ROOF DEMOLITION PLAN
Scale: 1/8" = 1'-0"
2 BUILDING 174 ROOF DEMOLITION PLAN
3 VALVE HOUSE ROOF DEMOLITION PLAN
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs#
FULLY SPRINKLERED
CEMS Engineering
320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com 843-875-3637
4/ 2/
2:
:5
PM
AD110
DEMOLITION PHOTOS
9 19Author
REPLACE ROOFS/FASCIA/
SOFFIT/GUTTER - VARIOUS
BUILDINGS
VAMC HAMPTON VA
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 4/6/2020
100% BID DOCUMENTS
590-18-12119-111
TM
Scale: No Scale
1 BLDG 33 DECORATIVE WOOD TRIM
Scale: No Scale
2 BLDG 33 WOOD FASCIA
Scale: No Scale
3 BLDG 28 SLATE ROOF
Scale: No Scale
4 BLDG 28 SHINGLE ROOF @ WALL
Scale: No Scale
5 BLDG 28 SHINGLE ROOF
Scale: No Scale
6 BLDG 31 SHINGLE ROOF
Scale: 1 1/2" = 1'-0"
7 BLDG 31 SHINGLE ROOF 2
Scale: 1 1/2" = 1'-0"
8 BLDG 174 SMOKE SHACK
Scale: 1 1/2" = 1'-0"
9 BLDG 171 GENERATOR BLDG
LAR
E GI H,NC
S
GO 52644P
E
N
CO
LU IT
E
NG
RG
UO
A.
P,P.
R E
G I
S T
E R
E D
A R C H I T E C T U R A L
C O
R P
O T
I O
N
N O R T H C A R O L I N A
A R
S TAT E O F N E VA DA
TH
EO
DORE JOHN MOWEN
JRRE
GISTERED
No. 7867
A R C H I T E C T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
DWG
of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .