PICS.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24621R0126
About this file
This document contains a pre-solicitation notice for a federal contract opportunity with the Department of Veterans Affairs to provide heating, ventilation, and air conditioning (HVAC) installation and insulation services at two buildings on the Salisbury VA Medical Center campus in North Carolina. The scope of work involves adding insulation and HVAC units to Buildings 17A and 17C due to increased medical supply storage needs resulting from the Covid-19 pandemic. The estimated construction value is between $500,000 and $1,000,000. The solicitation is set aside for total service-disabled veteran-owned small businesses. The pre-solicitation notice states that solicitation materials will be available on or around September 3, 2021. Interested parties are advised to register in the System for Award Management to receive notifications regarding the solicitation and any amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24621R0126 0001_13.docx | DOCX document | |
| 36C24621R0126 0001_11.docx | DOCX document | |
| SITE VISIT SIGN IN SHEET .pdf | ||
| Copy of B17AC RFI responses.xlsx | XLSX spreadsheet | |
| 36C24621R0126 0001_9.docx | DOCX document | |
| 36C24621R0126 0001_7.pdf | ||
| 4571 - 2021-05-20 100 percent Deliverable - Specs (1).pdf | ||
| 4571 - 100 percent CD Drawings 2021-05-20.pdf | ||
| 36C24621R0126 0001_4.pdf | ||
| 36C24621R0126 0001_5.docx | DOCX document | |
| 36C24621R0126.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHOULDER, SIDES, DITCHES,SLOPES (MAX. 3:1)
DATE TYPE PLANTING RATE
AUG 15 - NOV 1 TALL FESCUE 300#/ACRES(FESCUE)
NOV 1- MAR 1 TALL FESCUE & ABRUZZI RYE
300#/ACRES(FESCUE) AND
25#/ACRES ABRUZZI(RYE)
MAR 1 - APR 15 TALL FESCUE 300#/ ACRES
AUG 15 - JUNE 30 TALL FESCUE & ABRUZZI RYE
300#/ACRES (FESCUE) &
25#/ACRES (RYE)
JUL 1- AUG 15
TALL FESCUE& BROWNTOP MILLET OR
SORGHUM-SUDAN HYBRIDS
120#/ACRES
(FESCUE)-25#/ACRES
(BROWNTOP) -30#/ACRES
(SUDAN)
OLD WATER TANK BASE
OUTLINE OF CONCRETE SLAB
SITE LOCATION PLAN- TREE REMOVAL
1" = 40'
SITE LOCATION PLAN- NEW CONCRETE
1" = 20'
GENERAL NOTES:
A. REMOVE CURB, GUTTER, TREES AND STUMPS FROM AREAS INDICATED AND DISPOSE OFF STATION.
B. EXCAVATE AREA INDICATED BY HATCHING TO A DEPTH REQUIRED TO INSTALL THE CONCRETE SLAB AND FOOTINGS FOR
THE NEW PRE-ENGINEERED BUILDING AND THE NEW POROUS PAVEMENT AROUND THE ENTIRE AREA AS PER DETAILS.
CONCRETE SLAB TO BE LEVEL WITH B17B. DISPOSE ALL SOIL REMOVED FROM AREA OFF VA PROPERTY.
C. GRADE THE BOTTOM SECTION OF HATCHING FOR THE INSTALLATION OF NEW POROUS PAVEMENT. THE TOP OF THIS
PAVEMENT IS TO MATCH THE ELEVATION AND SLOPE OF ASPHALT DRIVEWAY OF B17B
D. GRADE THE SLOPES AROUND THE EDGES OF EXCAVATION TO A SLOPE OF OF MINIMAL GRADE.
E. INSTALL NEW CURB AND GUTTER AS INDICATED THE ON PLAN. SAWCUT EXISTING ASPHALT FOR A SMOOTH CUT FOR
SECTIONS OF ASPHALT TO BE REMOVED.
F. INSTALL NEW POROUS PAVEMENT AS PER DETAILS (SHEET 4 AND SPECS).
G. RESEED AREA AS PER NOTES BELOW.
SITE OF PROJECT LOCATION
N.T.S.
SITE OF PROJECT
SITE OF PROJECT EXCAVATION
1" = 20'
THE VEGETATION RATES ARE THOSE WHICH WILL DO WELL UNDER LOCAL CONDITIONS; OTHER
SEEDING RATES COMBINATIONS ARE POSSIBLE.
SOW SEED USING A SPREADER OR SEEDING MACHINE. DO NOT SEED WHEN WIND VELOCITY
EXCEEDS 5 MPH. DISTRIBUTE EVENLY OVER ENTIRE AREA BY SOWING EQUAL QUANTITY IN 2
DIRECTIONS AT RIGHT ANGLES.
SOW NOT LESS THAN THE QUANTITY OF SEED SPECIFIED OR SCHEDULED
RAKE SEED LIGHTLY INTO TOP 18" OF SOIL, ROLL LIGHTLY AND WATER WITH A FINE SPRAY.
PROTECT SEEDED SLOPES OF GREATER THAN 3:1 AGAINST EROSION WITH EROSION NETTING OR
OTHER METHODS ACCEPTABLE TO THE C.O.T.R.
PROTECT SEEDING AREA AGAINST EROSION BY SPREADING SPECIFIED LAWN MULCH AFTER
COMPLETION OF SEEDING OPERATIONS. SPREAD UNIFORMLY TO FORM A CONTINUOUS BLANKET
NOT LESS THAN 11
2" LOOSE MEASUREMENT OVER SEEDED AREAS.
ANCHORS MULCH BY SPRAYING WITH ASPHALT EMULSION AT THE RATE OF 10-13 GALLONS PER
1000 S.F. TAKE PRECAUTIONS TO PREVENT DAMAGE OR STAINING OF CONSTRUCTION OR OTHER
PLANTING ADJACENT TO MULCHED AREAS.
SEEDBED PREPARATION:
1. CHISEL COMPACTED AREA AND SPREAD TOPSOIL 3" DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE.
2. RIP THE ENTIRE AREA TO 6" DEEP.
3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE
REASONABLY SMOOTH AND UNIFORM.
4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSHATE UNIFORMLY AND MIX WITH
SOIL (SEE BELOW).
5. CONTINUOUS TILLAGE UNTIL A WELL PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS
PREPARED 4"-6" DEEP.
6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING
EQUIPMENT OR CULTIPACK AFTER SEEDING.
7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIR OR RE-SEEDING WITHIN THE
PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH
FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES.
* APPLY: AGRICULTURAL LIMESTONE- 2 TONS/ ACRE
FERTILIZER- 1000 LBS / ACRE 10-10-10
SUPERPHOSHATE- 500 LBS / ACRES 20%
MULCH- 2 TONS / ACRE SMALL GRAIN STRAW
ANCHOR- ASPHALT EMULSION- 10 GAL / 1000 S.F.
LANDSCAPING AND RESEEDING SPECS
CONSTRUCT NEW METAL
BUILDING B17C
DEMOLITION OF SITE WORK
AND RENOVATION OF C & G
PLANS NOTES AND DETAILS
6-14-2012
659-12-250
GLM
SCOPE OF WORK
THE INTENT OF THIS PROJECT IS TO HAVE A PRE-ENGINEERED METAL BUILDING EQUAL TO THE EXISTING METAL BUILDING IN COLOR, CONSTRUCTION
AND SIZE CONSTRUCTED. THE NEW BUILDING WILL BE SUBDIVIDED INTO TWO SEPARATE AREAS BY A NEW METAL STUD AND G.W.B. WALL. THE
WALL WILL HAVE A 6' x 7' METAL FRAME AND METAL DOORS WITH COMPLETE WITH HARDWARE, INCLUDING MORTISE LOCKSET, HINGES WITH NON
REMOVABLE HINGES, FLUSH BOLTS AT TOP AND BOTTOM OF ONE DOOR. THE NEW METAL BUILDING SHALL HAVE ELECTRICAL OUTLETS, HIGH BAY
LIGHTS, EXHAUST FAN AT THE END OF THE NON AIR CONDITION AREA. THE SMALLER SIDE WILL HAVE AN HEAT PUMP INSTALLED AND THE WALLS
WILL BE SPRAYED WITH CLOSED CELL SPRAY FOAM INSULATION. THIS INCLUDES THE NEW METAL STUD DIVIDING WALL, CEILING AND ALL WALLS IN
THIS SECTION. THE PROJECT WILL ALSO CONSIST OF EXCAVATION FOR BUILDING AND THE INSTALLATION FOR CONCRETE WORK FOR CURB AND
GUTTER, INSTALLING A SPRINKLER SYSTEM FOR THE WHOLE BUILDING, AND STRIPPING FOR PARKING.
1R
1 4
.6
A
R3.0'
R2.50
A 3" = 1'-0"
CURB ISLAND DETAIL
67.00'
6" 1'-6"
2'-0"
10" RADIUS
N.T.S.
CURB SECTION
N.T.S.
MOUNTABLE CURB SECTION
.1
114.52
'-0
" R
32.52
.5
.0
.0
.0
R E V
C
H A N G
E D
D
IM
'S
-3
-1
WP
INSULATION VALUES PER ASHRAE STANDARD 90.1 2010
STATION CLIMATE ZONE
ROOF
INSULATION
WALL
INSULATION
FLOOR
INSULATION
DOOR MAX
(OVERALL "U")
WINDOWS
SALISBURY (659)
R20 ci; METAL
R13+ R13, ATTIC R38
R13, 7.5 ci;
METAL R19;
MASS 9.5 ci.
R30 SLAB R15
FOR 24"
0.07 0.06 0.25
MAX "U" MAX "SHGC"
METAL BUILDING LAYOUT
GENERAL NOTES:
1. PROVIDE AND INSTALL NEW PRE-ENGINEERED METAL BUILDING WITH METAL ROOF WITH A CONCRETE SLAB DESIGNED BY THE
PRE-ENGINEERED MANUFACTURE. INSTALL A NEW PARTITION WALL FROM FLOOR TO ROOF ABOVE . WALL IS TO BE CONSTRUCTED OF 58
G.W.B ON BOTH SIDES, METAL STUDS. WALL IS TO RECEIVE A NEW 6' WIDE x 7' METAL FRAME AND METAL DOOR COMPLETE WITH NEW
MORTISE LOCKSET WITH THUMBTURN THAT WILL ACCEPT A SCFI FIGURE 8 CORE, WITH FLUSHBOLTS. THE WHOLE BUILDING IS TO BE
SPRINKLERED. TIE NEW SPRINKLER SYSTEM INTO EXISTING SPRINKER LINE FROM BUILDING 17B. THE CONTRACTOR IS TO PROVIDE
CERTIFIED SPRINKLER DRAWING PRIOR TO INSTALLING NEW SPRINKLER SYSTEM. THE NEW BUILDING IS TO HAVE METAL GUTTERS AND
DOWNSPOUTS, INSTALL NEW 2'x4' HIGH BAY LIGHT FIXTURES IN ALL AREAS. NUMBER OF LIGHTS ARE TO EQUAL .75 WATTS PER S.F.
INSTALL ONE (1) EXHAUST FAN LARGE ENOUGHT TO HAVE SEVEN (7) COMPLETE AIR CHANGE PER HOUR. TIE FAN INTO A THERMOSTAT TO
ACTIVATE THE FAN. INSTALL NEW MITISUBSHI HEAT PUMP MODEL MUZ-D30NA (OUTDOOR UNIT) AND MSZ-D30NA (INDOOR UNIT) OR
EQUAL TYPE SYSTEM. NEW HEAT PUMP SYSTEM TO HAVE THERMOSTAT MOUNTED ON WALL INSIDE DOUBLE DOOR. PAINT NEW METAL
STUD AND G.W.B WALL , METAL DOORS AND FRAME. THE BUILDING IS TO BE INSULATION AS PER REQUIREMENTS BELOW ON THIS SHEET.
2. THE NEW BUILDING IS TO HAVE FOUR (4) 14' HIGH x 13' WIDE INSULATED ROLL UP DOORS COMPLETE WITH HEAVY DUTY MOTOR WITH KEY
ACCESS TO UNLOCK AND ACTIVATE THE ROLL UP DOOR.
3. INSTALL NEW 200 AMP ELECTRICAL PANEL, 208 3 PHASE. COMPLETE WITH 10, 20 AMP BREAKERS, 22,000 AIC BOLT IN BREAKERS.
THIS PANEL TO TIE INTO EXISTING PANEL "B" ON THE 1ST FLOOR OF BUILDING 16. RUN NEW 4" Ø RACEWAY AS REQUIRED BY VA SPECS
AND N.E.C. PULL NEW 300 MCM WIRE FROM PANEL "B" TO PANEL IN NEW BUILDING.
4. INSTALL NEW ELECTRICAL OUTLETS AND DATA LINES IN OFFICE AREA. CONTRACTOR TO HAVE ALL CAT 6 CABLE PULLED THROUGH
RACEWAY
5. INSTALL NEW 2' x 4' HIGH BAY T-5 LIGHT FIXTURES WITH LENS COVERS. INSTALL AT 15'-0" A.F.F.
6. INSTALL NEW 3000# CONCRETE PAD FOR THE NEW A/C UNIT FOR OFFICE AREA. INSTALL NEW DISCONNECT AND WEATHERPROOF DUPLEX
OUT AND COVER. INSTALL TWO (2) METAL BOLLARD AS PER DETAIL THIS SHEET.
7. INSTALL 8" DEEP NC DOT ABC STONE AND COMPACT AS SPECIFICATION 32 12 43 REQUIRE AND INSTALL NEW POROUS PAVEMENT AS
REQUIRED IN AREA INDICATED
8. INSTALL ONE (1) NEW UNIT HEATER WITH FANS. SIZE UNITS SO THAT THE AREA OF THE NEW MAIN AREA OF THE BUILDING WILL MAINTAIN A
50° TEMPERATURE WITHOUT DAMAGE TO THE UNIT. TIE NEW FAN INTO NEW THERMOSTAT.
9. INSTALL TWO (2) STEEL BOLLARDS AT EACH ROLL UP DOOR AS PER DETAIL THIS SHEET. INSTALL AT 18" AWAY FROM BUILDING.
10. INSTALL LED EXIT LIGHTS OVER BOTH PASSAGE DOORS
11. INSTALL NEW FLORESCENT LIGHT FIXTURES ON OUTSIDE OF EACH PASSAGE DOOR. LIGHT FIXTURE TO HAVE PHOTO CELL FOR TURNING
ON AND OFF.
GLM
NEW 5" METAL DOWNSPOUT
INSTALL SPLASH BLOCK UNDER
DOWNSPOUT.
NEW 5" METAL GUTTER ENTIRE
LENGTH OF FRONT AND REAR OF
BUILDING
NEW 5" METAL DOWNSPOUT
TYPICAL BOTH ENDS AND BOTH
SIDES OF BUILDING. INSTALL
SPLASH BLOCK UNDER EACH
DOWNSPOUT
NEW 5" METAL GUTTER
TYPICAL EACH SIDE.
METAL BOLLARDS PER
DETAIL . TYP AT ALL ROLL UP
DOORS
GLM
CONSTRUCT NEW METAL
BUILDING B17C
SITE PLAN, BUILDING
LAYOUT AND NOTES
6-14-2012
659-12-250
2R 2 4
17'-8"47'-4"
14'-0" TYP.
BOTH SIDE
20'-0" TYP.
BOTH SIDES 10'-9" 20'-3"
65'-0"
3'-0"
18" TYP2
T Y P
HEAT PUMP PAD
N.T.S.
BOLLARD POST LOCATION
N.T.S.
BOLLARD POST DETAIL
N.T.S.
NEW EXIT LIGHT
NEW EXIT LIGHT
NEW DISCONNECT
AND WP DUPLEX
OUTLET
13'-0"
TYPICAL
T Y P
IC
A L
25'-0"
NEW WALL MOUNT
LED LIGHT FIXTURE NEW WALL MOUNTED LED LIGHT FIXTURE
R E V
C
H G
'S N
O T E
O N S
H T
F R O
M
A S P H A
LT
-1
T O
P O
R O
U S P
A V E M
E N T A
N D
S
IT
E P
LA
N T
IT
LE
32.19
.4
.0
.5
114.19
.1
SITE PLAN FOR CONCRETE AND POROUS PAVEMENT
1"= 30'
GENERAL NOTES FOR SHEET 3:
A. FORM AND POUR NEW 3000# CONCRETE OR AS REQUIRE BY PRE-ENGINEERED BUILDING MANUFACTURE. INSTALL ALL
REQUIRED REBAR, BOLTS ETC... AS REQUIRED BY MANUFACTURE.
B. FORM AND POUR NEW 3000# CONCRETE FOR NEW 5' WIDE x THE LENGTH OF THE BUILDING IN FRONT AND BACK OF
NEW METAL BUILDING. THIS SECTION TO SLOPE 1/8" PER FOOT AWAY FROM BUILDING. THE SECTIONS ARE TO GET A
LIGHT BROOM FINISH.
C. INSTALL A 3000# CONCRETE 5'-0" X 5'-0" X 4" THICK AT DOOR ON THE NORTH SIDE OF THE BUILDING. CENTER PAD TO
THE CENTER OF THE DOOR,
D. INSTALL A NEW 3'-0" X 3'-0" X 4" THICK 3000# CONCRETE PAD FOR THE NEW AIR CONDITIONING UNIT ON THE SOUTH
SIDE OF THE BUILDING.
E. NEW POWER AND SPRINKLER LINES ARE TO COME THROUGH NEW CONCRETE FLOOR. THESE NEED TO BE INSTALLED
PRIOR TO INSTALLING CONCRETE.
F. INSTALL NEW 4" Ø RACEWAY FOR NEW 200 AMP POWER PANEL. RUN NEW RACEWAY FROM NEW BUILDING 17C TO
BUILDING 16 PANEL "B LOCATED ON 1ST FLOOR IN MIDDLE OF BUILDING . RUN RACEWAY UP OUTSIDE WALL AND
THROUGH WALL AND AT FLOOR HEIGHT ALONG INSIDE WALL BEHIND LADDER TO ROOF AND UP AND OVER TO PANEL "B"
IN THE MIDDLE OF B16 1ST FLOOR. PANEL "B" IS AN 225 AMP PANEL, SO REMOVE REQUIRED BREAKER NEEDED TO
INSTALL A NEW 200 AMP 3 PHASE 22,000 AIC BREAKER. TURN OVER REMOVED BREAKER TO VA. INSTALL NEW CABLE
SIZED FOR THE DISTANCE BETWEEN THE TWO BUILDING.
G. INSTALL NEW 4" Ø RACEWAY FROM NEW BUILDING TO EXISTING BUILDING 18 BOILER PLANT AND INTO EXISTING ROOM
BH-10 INSIDE THE BUILDING FOR NEW DATA AND TELEPHONE LINES AND INSTALL NEW PULL STRINGS, CONTACT
TARHEEL COMMUNICATIONS FOR PRICING ON THE INSTALLATION OF TELEPHONE AND DATA.
H. PROVIDE AND INSTALL NEW SPRINKLER SYSTEM. SPRINKLER SYSTEM TO BE DESIGNED BY A CERTIFIED SPRINKLER
DESIGNER OR ENGINEER WHO IS CERTIFIED IN FIRE SYTEMS DESIGN. TIE NEW SYSTEM INTO EXISTING SPRINKLER
SYSTEM FROM B17B EXISTING SYSTEM.
BUILDING 16 1st FLOOR 1 1/2" = 1'-0"
BUILDING 16 EAST ELEVATION
1 1/2" = 1'-0"
NEW PRE-ENGINEERED BUILDING CONCRETE SLAB
N.T.S.
GLM
CONSTRUCT NEW METAL
BUILDING B17C
SITE PLAN FOR ELECTRICAL,
CONCRETE PLAN
6-14-2012
659-12-250
3R 3 4
67'-0"
EXISTING PANEL "B"
EXISTING ELECTRICAL
RACEWAY FROM B17B
NEW 4"Ø RACEWAY FROM
NEW B17C PANEL
SEAL PENATRATION
THROUGH WALL
DEPTH AS REQUIRED
THE N.E.C.
NEW ELECTRICAL RACEWAY
FROM NEW PANEL TO PANEL
"B" IN BUILDING 16 1st FLOOR
R E V
A D
D E D
S P R
IN
K L E R N
O T E A
N D
S P R
IN
K
LE
R L
IN
E A
N D
S
IT
E P
L A N T
IT
LE
-1
SITE PLAN FOR ELECTRICAL, TELEPHONE AND SPRINKLER
1"= 30'
GLM
CONSTRUCT NEW METAL
BUILDING B17C
SITE PLAN FOR ELECTRICAL,
CONCRETE PLAN
6-14-2012
659-12-250
4 4
4 N.T.S
SECTION AT ASPHALT & POROUS PAVEMENT
3 N.T.S
SECTION NATURAL GRADE & POROUS PAVEMENT
POROUS PAVEMENT DETAILS A
N.T.S.
POROUS PAVEMENT DETAILS B
N.T.S.
Emer Storage
462 SF
Warehouse
2535 SF
Emer Storage
462 SF
Warehouse
2535 SF
DEPT. OF VETERANS AFFAIRS
MEDICAL CENTER
SALISBURY N.C.
BUILDING 17A
REVISED BY GLM 07−9−08
| B16 yard across the road. Note transformer in front. May be used for parking or laydown. |
| B17A back wall opposite rolling doors; shows area behind the office |
| B17A from left rolling door |
| B17A from the front |
| B17A interior 1 |
| B17A interior, straight in view from left side rolling door |
| B17A rear from old water tower foundation. B18 in background |
| B17A rear view from old water tower foundation knoll. B18 in background. |
| B17A right side exterior. Note existing Mistubishi AC. New HVAC goes further down along wall. |
| B17A showing right side. Yellow spray insulation is on the small office section |
| B17B rear, from old water tower foundation knoll. 17C is behind white trailers. |
| B17C front right corner, note AC unit. |
| B17C front view |
| B17C interior from front door. |
| B17C left side from front. |
| B17C left side from the back. Elec plugs can be disconnected in daytime. |
| B17C rear asphalt area. |
| B17C with site plan |
| 659-12-250 EMERGENCY PREPAREDNESS STORAGE BLDG FINAL |
| Work |
| 659-12-250 Sht 1 of 4 |
| 659-12-250 Sht 2 of 4 |
| 659-12-250 Sht 3 of 4 |
| 659-12-250 Sht 4 of 4 |
| B17C, note fan at ceiling peak |
| Building 17A Warehouse Floor Plan |
| Building 17A Warehouse Floor Plan |
| Work |
| 24x36 |
File details come from the government source that posted it. Updated .