Statement of Proposal Items.docx

DOCX document 17 KB Posted

Attached to
Y1DZ--Expand Building 1 D-Wing Project No: 565-135
Solicitation number
36C24621R0050
Issued by

About this file

This document contains a statement of proposal items and details of a related federal contract opportunity for construction services. The statement of proposal items is for a project to expand Building 1 at the Fayetteville VA Medical Center to construct a planned expansion including a four story elevator and shaft, patient drop off canopies, and site modifications totaling approximately 24,800 gross square feet. The basement level expansion includes additional space for the Emergency Room Department including Mental Health areas. The first floor expansion includes patient sub waiting areas, consult offices and additional staff areas. The proposal includes pricing for the base proposal and three deduct alternates that remove specified scopes of electrical, mechanical and interior partition work from the first floor portion of the project. The pre-solicitation federal contract opportunity provides additional context that the solicitation will be posted on or around May 28, 2021 for a construction project with a projected completion of 545 days after notice to proceed. The NAICS code for this procurement is 236220 for Commercial and Institutional Building Construction with a small business size standard of $39.5 Million.

View the file

Other files

File Type Posted
36C24621R0050 0005.pdf PDF
EXPAND BLDG. 1 D WING_ADDENDUM A DRAWINGS (17 total).pdf PDF
Specification Section 01 00 00 - R 06.22.2021.docx DOCX document
LISTING OF DRAWINGS.pdf PDF
36C24621R0050 0004.pdf PDF
36C24621R0050 0003.pdf PDF
FNCVAMC Lead Survey 2003 includes Building 8 - Part 1.pdf PDF
Bldg 8 Fire Alarm Replacement 1990.pdf PDF
B 4_5_8 Heat Pumps and Solar Sht 4 of 5 1983.pdf PDF
Dec 2016 Subsurface and Geotechnical Analysis for Expand D-Wing Project.pdf PDF
B 4_5_7_8 Heat Pumps and Solar Sht 5 of 5 1983.pdf PDF
Building 8 Lead Based Paint Survey Results 2003.pdf PDF
Telephone System Replacement Bldg 8-E1 Electrical 1984.pdf PDF
B 4_8 Heat Pumps and Solar Sht 3 of 5 1983.pdf PDF
Specification Section 09 24 00 - Portland Cement Plastering.pdf PDF
B 4_5_7_8 Heat Pumps and Solar Sht 1 of 5 1983.pdf PDF
Building 8 ACM Survey 2004.pdf PDF
FNCVAMC Lead Survey 2003 includes Building 8 - Part 2.pdf PDF
36C24621R0050 0002.pdf PDF
36C24621R0050 0001.pdf PDF
D Wing Drawings 51 to 120.pdf PDF
D Wing Specifications Vol 1.pdf PDF
D Wing Drawings 1 to 14.pdf PDF
D Wing Drawings 121 to 177.pdf PDF
D Wing Drawings 15 to 25.pdf PDF
D Wing Specifications Vol 2.pdf PDF
D Wing Drawings 26 to 50.pdf PDF
36C24621R0050_1.docx DOCX document
36C24621R0050.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24621R0050 Expand Bldg. 1 D Wing Amendment 0005 Statement of Proposal Items

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within one-hundred and twenty (120) calendar days after the date offers are due.

Contract completion time: Five Hundred and Forty-five (545) calendar days after Notice to Proceed (NTP)

PROPOSAL ITEM I (BASE PROPOSAL): $_____________________________________

All work shown or specified within the drawings and specifications.

The project will include expanding the Emergency Room on the Basement Level for Mental Health patients, creating Consult spaces on the first floor, and adding a dedicated elevator for transporting patients and roof access. The building expansion is designed to accommodate two (2) addition floors in future projects.

PROPOSAL ITEM II (DEDUCT ALTERNATE 1) $_____________________________

All work as specified for PROPOSAL ITEM I (BASE PROPOSAL) minus the following:

All Labor, material, equipment, and supervision necessary to perform the required electrical construction work on the First Floor.

PROPOSAL ITEM III (DEDUCT ALTERNATE 2): $ ___________________________

All work as specified for PROPOSAL ITEM I (BASE PROPOSAL ) AND PROPOSAL ITEM II (Deduct Alternate 1) minus the following:

All Labor, material, equipment, and supervision necessary to perform the required mechanical construction work on the First Floor.

PROPOSAL ITEM III (DEDUCT ALTERNATE 3): $ ___________________________

All work as specified for PROPOSAL ITEM I (Base PROPOSAL ), PROPOSAL ITEM II (Deduct Alternate 1), AND PROPOSAL ITEM III (Deduct Alternate 3) minus the following:

All Labor, material, equipment and supervision necessary to perform the interior partition construction work on the First Floor with the exception of required Life Safety partitions shown on AE120 (Exit Stairs, Elevator Shaft, and 2 other areas).