This document contains a solicitation announcement and related federal contract opportunity for renovating Building 509 at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The Department of Veterans Affairs is seeking a design-build firm through a 100% total set-aside for Service-Disabled Veteran Owned Small Businesses to renovate the building to house a 3D printing manufacturing center. The renovations will allow the facility to produce medical personnel protective equipment and other supplies for Veterans. The upgrades will include HVAC, electrical, architectural, structural, communication, and fire protection systems. Offerors must submit responses by 120 calendar days from receipt of the notice to proceed, with a period of performance of 365 calendar days to complete the renovations. The contract type will be firm-fixed price between $500,000 to $1,000,000.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
652-20-129 Renovate Bldg 509 for 3D Printing Lab
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-09-2021 652-20-129 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24621R0048 01-26-2021
X X X
X Solicitation 36C24621R0048 Amendment 0001:
The period of performance is reduced from 365 calendar days after Notice to Proceed to 270 days after Notice to Proceed.
See revised proposed schedule on page 2.
Magnitude of Construction revised to "Between $1,000,000 to $2,000,000".
Attachment "Spec Section 01 11 21 RFP to DB" replaced in its entirety with "Spec Section 01 11 21 RFP to DB Rev 1".
All other terms and conditions of the document referenced in Box 9A, as heretofore changed, remains unchanged.
Ranese Freeman Carroll Contracting Officer
DESIGN-BUILD SCOPE OF WORK
Renovate Bldg 509 for 3D Printing Lab 652-20-129
H.H. MCGUIRE VA MEDICAL CENTER, RICHMOND, VA
PROJECT IDENTIFICATION
Project Title: Renovate Bldg 509 for 3D Printing Lab Project Location: Building 509
PROPOSED SCHEDULE (calendar days)
| · Notice to Proceed | S-Day | ||||
| · 30% Submission (with 100% Demolition, 95% Architectural) | S+30 calendar days | ||||
| · 30% Review by VA | S+37 calendar days | ||||
| · 95% Submission (with 100% Architectural and Structural) | S+67 calendar days | ||||
| · 95% Review by VA | S+74 calendar days | ||||
| · CD Submission | (100% All disciplines) | S+104 calendar days | |||
| · CD Review by VA | S+111 calendar days | ||||
| · Mobilization of Construction Contractor | S+ 37 days |
(on approval of demolition plans)
· Construction Complete S+270 days Total Period of Performance – 270 calendar days from issuance of Notice to Proceed