20210121 A-E Response Document for Moisture Integrity construction RFI-003.pdf
PDF 401 KB Posted
- Solicitation number
- 36C24621R0020
About this file
This document includes a federal presolicitation notice and responses to requests for information related to a moisture integrity repair project. The Department of Veterans Affairs is seeking a contractor to provide labor, tools, and materials to repair, insulate, seal, and waterproof exterior walls, parapet walls, windows, lintels, roofs, roof flashings, precast concrete copings, and louvers of Buildings 110/110A located at the Hampton VA Medical Center in Hampton, Virginia. The estimated construction value is between $2 million and $5 million. The solicitation is anticipated as a total service-disabled veteran-owned small business set-aside, and will be issued on or around November 30, 2020 with proposals due approximately 30 days later. Responses to requests for information indicate that swing stages cannot be used due to structural concerns, and a proposed air barrier membrane substitution would require re-evaluation by the State Historic Preservation Office due to a difference in curing color.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20200529 Project Manual - Specifications.pdf | ||
| 36C24621R0020_1 0003.docx | DOCX document | |
| 20210126163746027.pdf | ||
| 20210119 A-E Response Document for Moisture Integrity construction RFI-002.pdf | ||
| 36C24621R0020_1 0002.docx | DOCX document | |
| 36C24621R0020_1 0001.docx | DOCX document | |
| Laydown Area.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| 20200529 Project Manual - Specifications.pdf | ||
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Safety Handbook.pdf | ||
| Attachment B - Corp Experience Form.docx | DOCX document | |
| 36C24621R0020_1.docx | DOCX document | |
| 100pct PDF Drawings.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architecture, Interior Design, Engineering, Consulting, and Testing Services www.RaymondLLC.com
1601 Summit Ave.
Richmond, VA 23230 804-726-9540 www.RaymondLLC.com
DUNS #: 84-048-8324
SDVOSB – 8a & SWaM
RFI Response #003
1) (The request ask about the use of swing stages on the project): Besides the brick work scope the other major cost driver is the access. Question 16 may have huge cost implications. Based on our walk of the site and roof we felt although it might be challenging there was a way to access most of the exterior work from swing stages. This is far and away the most cost-effective means of access. To scaffold the entire project would add a lot of money. We need to know definitively if we can or cannot use swing stages on this project?
R: The existing parapet walls/structures are solid masonry, non-reinforced, gravity structures with a horizontal cold joint where roof flashings are embedded in the structure. As such we believe these to have zero structural capacity when discussing supporting the loads and moments introduced by swing stage apparatus. Additionally, the horizontal roof structures were not designed to support the additional loads which would be superimposed by structure and counterweights necessary to support and cantilever swing staging. Finally, since a swing stage is also supported against the wall on which work is being performed, the swing stage would tend to preclude installation of a monolithic and uniform waterproofing membrane.
Scaffolding the entire project at once is not intended. The design intent is to scaffold the project in phases as indicated by 1/G-102, permitting, for example, Phase 2 to be erected while Phase 1 is performed, then work moving to Phase 2 and the scaffolding from Phase 1 leapfrogging Phase 2 and being erected for Phase 3, and so forth and so on, the intent being to only have scaffolding for two phases on site at any given time.
2) Additionally, please see the attached information from Mr. Lattimer regarding the Moisture Integrity Project. I do not know if there is a question about the product but please review and evaluate for usage of the item. The attached is the completed CSI Substitution Request Form, side-by-side product comparison, reference list, product data sheets, 15-year sample warranty, testing results, and sustainability information for PROSOCO’s Cat 5 fluid-applied, vapor permeable STP membrane air barrier system
R: The product proposed for substitution does not cure to a clear color, but rather cures to a light brown color as indicated in the submitted side by side comparison. The ability to cure to a clear color and minimally affect the appearance of the building was part of the justification presented to the SHPO in support of the specified product, and part of the SHPO’s basis for approval. Substitution of a product which does not cure clear would be cause for re-evaluation by the SHPO, with the very distinct potential for rejection and delay caused by that review process.
Z:\RVA\RVA1033 Dept of VA - VISN 6\001 VAMC Hampton Bldg 110 & 110A - Moisture Integrity Repair\RFI's\20210121 A-E Response Document for Moisture Integrity construction RFI- 003.docx
File details come from the government source that posted it. Updated .